Photos from Ghost Gum Carpentry's post 30/05/2024

Last 5 weeks have seen me back in my old stomping ground - Toowoomba!!

This has been quite a job - small extension which will become walk-through robe to master ensuite.

Brand new deck with flyover roof (those rafters are bloody heavy and no, getting them 4.2m up in the air was not fun!

Existing deck will be framed in and become entry and rumpus to allow part of the existing lounge to become the 4th bedroom.

Some long days on the tools; I tried to find photos that weren't taken in the dark.

Shout out to my amazing wifey Emilie for holding down the fort while I've been gone

Photos from Ghost Gum Carpentry's post 27/02/2024

New verandah all finished at Tivoli.
The old decking had been nailed and screwed that many times that the old joists had to be replaced too.

Tried a new Hyne LGL joist on this one and screwed the boards down.
Fitted a new bearer to support the external wall on one end that is a tiled shower wall on the other side, which allowed me to re-run those joists so that they run the right way now.

Photos from Ghost Gum Carpentry's post 21/12/2023

All done for the year!!
What a massive few weeks... months...have lost count actually.

In the last 3 weeks alone, all the walls straightened and insulated; ~150 VJ sheets fitted; downstairs fit out done except doors and ready for paint; upstairs almost fully sheeted.

We're well and truly ready for a little break and the knock off bell has rung.

Thank you to all our amazing clients, trades and suppliers and all those people who consistently throw us a like and a share for all your support throughout the year. You make small businesses viable.

Merry Christmas all and see you in the new year

Photos from Ghost Gum Carpentry's post 04/12/2023

Cladding is officially finished! I can finally stop dreaming about cutting boards!

I finished last week but I wanted to wait until the scaffolding came down before I shared the photos.

Really starting to come along now. Downstairs wall linings are nearly done and then it's on to fitout and finish.

Photos from Ghost Gum Carpentry's post 20/09/2023

Well after 5 months, we've finally finished frame stage! What a monumental task this old girl has laid on for us.
Everything downstairs is obviously new. It's been almost completely reframed upstairs.

We've started cladding and have given it a pretty good nudge the last few days and it's starting to show what it'll look like when it's done.

We estimate 2 skip bins worth of old material has either been reused in various ways or sold on to it's next step in life. We're going to use that to take our wonderful clients out to lunch tomorrow! Can't thank them enough for the trusting us to transform their new home from plans on paper into reality!

Photos from Ghost Gum Carpentry's post 13/07/2023

Big progress happening at Newtown!
Old cladding all but gone and external reframing nearly finished, which has fixed some bad level and plumb issues. Big dent in the internal demo done too.
Bressumer beams arrive Monday to open up some of those internals.
We also removed the old verandah ceiling joists to give some nice high raked ceilings in these areas.

Really starting to take shape now!

Photos from Ghost Gum Carpentry's post 01/06/2023

Lots of progress happening at Newtown, with Superior Design and Construction.

Downstairs framing is almost done.

Photos from Ghost Gum Carpentry's post 12/05/2023

Not bad for a short week.
Some pretty 'high' level (get it? get it?) framing.
Those walls are over 4m at the peak.

We're enclosing a deck that gets absolutely baked by the sun. Extra thick wall framing to allow for extra insulation. New kitchen will go in here.

Little secret mezzanine storage area going in first thing next week.

Stay tuned - have a surprise in store for next week!

Photos from Ghost Gum Carpentry's post 26/04/2023

All but done!

This massive deck has been an amazing build and has almost doubled the living space of this family home.

And I still looooove that mixed Aussie hardwood decking 😍

Will update when the it's all painted and the outdoor kitchen goes in.

Photos from Ghost Gum Carpentry's post 24/03/2023

Week one down on this big deck. Pour concrete Monday.

Photos from Ghost Gum Carpentry's post 06/03/2023

This old girl has been lifted to her new lofty heights - air a little thinner up there! Slab goes down next week.
And then it's action stations! Build in under, completely remodel upstairs.
Will keep us busy for most of the year!

Photos from Ghost Gum Carpentry's post 06/03/2023

Quick little recoat of a deck I did last year.

Regular maintenance keeps your deck looking great for years to come - 3 🍺 job for those of you following along at home 😉

Photos from Ghost Gum Carpentry's post 14/12/2022

Second to last job for the year all done and dusted.

First time using factory dressed timber and i don't miss all the sanding!

At the end of time these stairs, that concrete path (was over 200mm thick!) and the cockroaches will still be here, just hangin' out.

Photos from Ghost Gum Carpentry's post 06/11/2022

Started a new job on a lovely old girl (circa 1890!) at North Ipswich this week.
Verandah to become an ensuite, increase the size of the bedroom, and walk in robe.

Going well so far in spite of the weather.

Site doggo got to come and found himself a playmate.
No. They didn't do ANY work

Photos from Ghost Gum Carpentry's post 05/10/2022

Been a busy, and varied few weeks!

Removed an unwanted external door and re-clad both sides
Wardrobe units
Machine work on a long driveway
Cutting split posts
Replaced some rotten roof framing (forgot to get photos though)

We start an interesting one on a lovely old Queenslander next week so stay tuned for some pics!

Photos from Ghost Gum Carpentry's post 16/09/2022

Well the Narangba deck is all finished!
Just gonna let the pictures speak for themselves, I think.

And yes, there was a helluva lot'a work in that walkway...

Thanks you A&S - you made working away from home very comfortable and enjoyable and are just a terrific pair of humans.

In case you're wondering, the braces have been left on the posts to prevent warping and bowing while we decide what sort of roof we want

Photos from Ghost Gum Carpentry's post 04/08/2022

Narangba deck extension progressing nicely.

Structure all but done. Time to put some posts up.

Photos from Ghost Gum Carpentry's post 10/07/2022

Just a little teaser...

1 week to go and then it's all done!!

Photos from Ghost Gum Carpentry's post 10/06/2022

Been a huge few weeks at the Yamanto renovation.
If I never have to pick up a plaster blade again it'll be too soon!
But finally have no holes in the walls anymore.

All the paint prep is done and painter starts next week; I can't wait to be rid of the horrible yellow walls!

New kitchen has been built and ready to be installed with its beautiful benchtops.
Tiles up and new flooring and carpet ordered.

Robe units for all the bedrooms along with new sliding doors.

Will all look VERY different in 3 weeks!

Photos from Ghost Gum Carpentry's post 09/05/2022

Well they say "Ya win some, ya lose some."

This was definitely the latter. Just about everything that could go wrong, did.

But a with a bit of perseverance and maximum effort, this came a up a proper treat!!

Photos from Ghost Gum Carpentry's post 04/05/2022

Rotten deathtrap steps out - beautiful new ones in.

Rotten, unsightly, unsafe balustrade gone - looks much more betterer now.

Thank you K & T - you've been wonderful clients; thank you for the coffees!! ☕☕

Photos from Ghost Gum Carpentry's post 22/03/2022

Another little piece of decent carpentry today.

How does one hold a whole set of stairs in place whilst you replace one rotten stringer?
🪄🪄

Good to go on the market now!

Photos from Ghost Gum Carpentry's post 21/03/2022

Simply little job but really helps in dressing up the front of this house for sale.

Photos from Ghost Gum Carpentry's post 27/02/2022

It's finally stopped raining for more than 3 minutes so I thought I'd pop a pretty piece of positivity up

Tivoli bathroom all finished.

Certainly made the most of every square cm on this one! Double vanity, large shower and washing machine inside 6m2

All the trades came together and did a great job; I was glad to be a part.

Photos from Ghost Gum Carpentry's post 06/02/2022

Work all week, work all weekend.

This addition will house a tractor and help keep it and all its implements out of the weather.
Will also allow the first bay of the shed to be opened up, allowing access for the tractor load/unload big and weather sensitive items.

Finished photos to follow

Photos from Ghost Gum Carpentry's post 22/12/2021

That's a wrap for the year! We made it!

What a year too; bigger and better jobs, learning every day.

We've welcomed another tradesman to the team now and he's been invaluable already.

Next year is starting to fill up already; am looking forward to sharing some of those jobs with you.

I can't thank you all enough - all my terrific clients, sub trades and all those who've supported us by liking and sharing my posts - you've all really contributed to the incredible growth my little business has seen this year.

Now for a few weeks R&R, family and 🍻

Photos from Ghost Gum Carpentry's post 09/12/2021

Just a little one this time.

New fencing at the bottom of a lovely property in Brookwater.
Style and colour matched to existing fencing around the pool and deck etc.

Client is getting the stainless balustrading done this week and that'll keep the new grand kids safe.

Photos from Ghost Gum Carpentry's post 24/11/2021

Something a bit different for Ghost Gum this week.

Few progress shots -
Moving a dental laboratory to new premises;

Refitting existing cabinetry and 1 piece stainless benchtop into a smaller space with a different layout, accommodating a service cupboard in one corner with core holes into the underground carpark.

Logistics has definitely been a challenge on this one - plenty of things I don't usually need to consider.

Should look pretty different next week with some new flooring, glass doors and panels and office cabinetry in place.


!!

Photos from Ghost Gum Carpentry's post 04/11/2021

Tidy little reno at Brassall.

New kitchen, updated bathroom and laundry, new paint throughout and new flooring goes in soon.

Has breathed new life into this little place.

Photos from Ghost Gum Carpentry's post 23/10/2021

"Thanks a lot Bodie. The new decking makes the old step treads look really average. We need you to replace them too now."

Funnily enough - not the first time I've heard this 'complaint'....

Not a bad problem to have I guess :)

This old girl gets a whole new lick of paint, including new colour scheme, at the end of the year. I can't wait to see how it comes up

Want your business to be the top-listed Contractor in Ipswich?
Click here to claim your Sponsored Listing.

Category

Telephone

Website

Address

196 Shepherd Road
Ipswich, QLD
4306

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm
Saturday 8am - 12pm