Schuller & Co. Construction

Schuller & Co. Construction

Schuller & Co is an independent carpentry business. We pride ourselves on our attention to detail an

Photos from Schuller & Co. Construction's post 29/10/2024

It’s truly wonderful how some cabinetry and a new floor can make such a change πŸ› οΈ

Photos from Schuller & Co. Construction's post 23/10/2024

Summer is fast approaching β˜€οΈ
Get the place in order and ready to host summer gatherings with the deck you’ve always wanted.
Give us a call today so we can bring your dreams to life πŸ”¨

Photos from Schuller & Co. Construction's post 18/08/2024

Before 🚫
After βœ…
Complete demo and rebuild for our wonderful clients in Mount Waverly.
Now is the perfect time to get any jobs completed and ready for summer.
Message us for your free quote today πŸ™‚

Photos from Schuller & Co. Construction's post 25/02/2024

Completed this 40m2 deck before handover in Ashburton. Contact us today for a free quote.

28/10/2023

Calling in the big guns for a helping hand πŸ˜‚πŸ˜‚πŸ’ͺ

25/10/2023

Getting the job done rain hail or shine πŸ˜‚πŸ˜‚

Photos from Schuller & Co. Construction's post 22/08/2023

Always great doing something new with the no concrete surefoot foundation system on this home extension in Blackburn. Now ready for steel joists/walls and roof. Cheers for the help Clardel Projects

Photos from Schuller & Co. Construction's post 31/07/2023

Was awesome doing this amazing stairwell with Clardel Projects in AshwoodπŸ’ͺ lots of hard work in this one. Finishing touches on the rest of the house and photos to come.

Photos from Schuller & Co. Construction's post 29/05/2023

Complete re-do of this beautiful wrap around deck in Wonga Park. 110m2 Merbau deck with two new set of stairs, 60m2 extension on roof and new tensioned wire balustrade. πŸ’ͺ

Photos from Schuller & Co. Construction's post 02/05/2023

A fresh new deck with wrap around steps in the front entrance for our awesome client in Bayswater. πŸ’ͺπŸ‘ŒπŸΌβ€οΈ

Photos from Schuller & Co. Construction's post 10/02/2023

New Merbau deck with ramps for our wonderful client in box hill.

Photos from Schuller & Co. Construction's post 28/12/2022

Updating this living area with a new fireplace, cabinets and half moon cladding for our very happy client in Wollert.

Photos from Schuller & Co. Construction's post 28/12/2022

A complete reconstruction of a rotten deck, a freshen up of the patio and extra privacy screens for a very happy client in Surrey Hills

Photos from Schuller & Co. Construction's post 16/06/2022

Updating this bathroom in Blackburn north with a walk in shower, feature wall, new niche, new shower fittings. Blocked off the old entrance, new cavity slider and and entrance. New floor and two very happy clients.

Photos from Schuller & Co. Construction's post 11/05/2022

A complete deck demo and rebuild with new balustrades
Swipe right for progress shots ➑️
Location: Ferntree Gully

Photos from Schuller & Co. Construction's post 28/04/2022

A complete deck demo and rebuild for a lovely lady in Mt Evelyn

Photos from Schuller & Co. Construction's post 04/04/2022

Giving some major TLC to this old rotten timber deck in Bayswater.

Photos from Schuller & Co. Construction's post 20/03/2022

From nothing to this New deck with steps and balustrade. Thanks to Julius and his partner for looking after us while we transformed his backyard.
Who can spot our new apprentice πŸ˜‰

Photos from Schuller & Co. Construction's post 07/03/2022

Transformed this concrete backyard into this peaceful oasis of a privacy deck
Location: Kilsyth

Photos from Schuller & Co. Construction's post 24/02/2022

Making the most out of the empty space by creating some storage in the attic
Location: Malvern East

Photos from Schuller & Co. Construction's post 24/02/2022

Finished extension/renovation, isn’t she beautiful?! πŸ‘ŒπŸΌ
Location: Carnegie

Photos from Schuller & Co. Construction's post 24/02/2022

2 new decks and a front entrance facelift, next stage is attic storage.
Location: Malvern East

Photos from Schuller & Co. Construction's post 24/02/2022

Lower level completed and ready to move
Location: Warrandyte

Photos from Schuller & Co. Construction's post 24/02/2022

Progress shots of the second story at a previous Reno ready for finishing touches before painting.
Location: Warrandyte

Photos from Schuller & Co. Construction's post 24/02/2022

Bringing some life back to this deck by re-surfacing with alpine ash composite decking.

Location: Wollert VIC

Videos (show all)

Getting the job done rain hail or shine πŸ˜‚πŸ˜‚
Ready for painting

Telephone

Website