New Level Construction

New Level Construction

I am a small owner operated company specializing in residential renovations. I have over 20 years experience and am a licensed red seal carpenter.

I also have a license for Nudura ICF foundations.

20/02/2023

Replaced the old glass and wooden trim around them. Painted it white to match.

Photos from New Level Construction's post 20/02/2023

Insulated, installed vapour barrier, hung the drywall and crack filled the complete second floor.

Photos from New Level Construction's post 20/02/2023

There was a slight roof leak that damaged the existing closet and wooden header holding the brick up. Removed pretty much everything and made a temporary new entrance to the warehouse behind it. Framed it back up, drywalled and crack filled it, and installed some of the widest door jambs ever.

Photos from New Level Construction's post 20/02/2023
Photos from New Level Construction's post 20/02/2023

Floor drain from the garage clogged the pipe. Jackhammered and removed section of slab to access the pipe. Loyd Wilson Plumbing replaced pipe with ABS and I filled it back in and poured new concrete.

Photos from New Level Construction's post 27/06/2021

Jackhammered old steps and walkway out. Taylor's landscaping did all the stone work. I built the new steps, replaced the top rail and installed the rain gutter on the shed to collect water.

Photos from New Level Construction's post 27/06/2021

Replacing corbels and and rotten wood in preparation for the painters.

Photos from New Level Construction's post 27/06/2021

Replaced the crown molding over the windows.

Photos from New Level Construction's post 27/06/2021

Pictures of the 42" pocket door I installed with soft close and open.

27/06/2021

Installed a 42" pocket door with soft close and open.

Photos from New Level Construction's post 27/06/2021

the ceiling was removed to get access to k**b and tube wiring for replacement. After the electrical was completed I went back and levelled the ceiling, Installed new tongue and grove boards and sprayed them ceiling white. Owners are repainting the walls.

Photos from New Level Construction's post 27/06/2021

The posts on the fence were falling over and coming loose. I removed them all, straightened the fence and installed all new ones. Re-using the fence panels that were existing.

27/06/2021
Timeline photos 12/04/2021
Photos from New Level Construction's post 05/03/2021

House suffered a flood but it’s all back together now and better then before.

Videos (show all)

Installed a 42" pocket door with soft close and open.

Telephone

Website

Opening Hours

Monday 08:00 - 22:00
Tuesday 08:00 - 22:00
Wednesday 08:00 - 22:00
Thursday 08:00 - 22:00
Friday 08:00 - 22:00
Saturday 08:00 - 22:00
Sunday 08:00 - 22:00