Photos from LeClair Construction Management's post 23/06/2024

Mass Timber Structure Completed! Now we progress to shear wall construction.

Photos from LeClair Construction Management's post 31/05/2024

Rosseau Lake College's new Athletic Building captured by Jordan Patten (RLC Alumnus 2011). Thank you for the shots.

Photos from LeClair Construction Management's post 30/05/2024

CLT roof decking being placed on Rosseau Lake College's new Recreation Centre.

Photos from LeClair Construction Management's post 12/05/2024

Glulam rafters and trusses being hoisted into place.

Photos from LeClair Construction Management's post 12/05/2024

Placement of CLT(cross laminated timber) for the Mezzanine floor deck.

Photos from LeClair Construction Management's post 12/05/2024

Er****on is underway of the Mass Timber Structure for the Rosseau Lake College Athletic Centre.

Photos from LeClair Construction Management's post 26/04/2024

With the arrival of the Mass Timber package, construction of Rosseau Lake College's Recreation Centre begins again.

22/03/2024

Let's hope this last blast of winter is the last of the season. We will be mobilizing shortly to erect our Mass Timber Structure.

Photos from LeClair Construction Management's post 21/03/2024

December 2023- RLC's Recreation Centre- Site drainage installed, backfilled, compacted and ready to demobilize until Spring of 2024.

Photos from LeClair Construction Management's post 21/03/2024

December 2023- RLC's Recreation Centre- Site drainage installed, backfilled, compacted and ready to demobilize until Spring of 2024

Photos from LeClair Construction Management's post 20/03/2024

Foundations- forming, placing, stripping, and ready for backfill at Rosseau Lake College's new Recreation Centre.

Photos from LeClair Construction Management's post 18/03/2024

Rebar and concrete placing to footings in the Fall of 2023 for the new Recreation Centre at Rosseau Lake College.

Photos from LeClair Construction Management's post 17/03/2024

Footing formwork underway in the Fall of 2023.

Photos from LeClair Construction Management's post 14/03/2024

Excavation continued in the Fall of 2023 for RLC's new Recreation Centre.

11/03/2024

Andrew Murray and Darren LeClair, both Alumni of Rosseau Lake College on the site of RLC's new Recreation Centre.

Photos from LeClair Construction Management's post 11/03/2024

Excavation and Layout for RLC's new Recreation Centre.

Photos from LeClair Construction Management's post 28/02/2024

Site Clearing at the site of Rosseau Lake College's new Recreation Centre.