Brennan Scaffolding Ltd
Scaffold specialists covering the West Midlands and beyond
Small temporary roof and enclosure built for a repeat client who was adapting the existing dormers on this property so had to take a section of the roof off and with our great unpredictable British weather they couldn’t risk any water damage. ⛈️☔️
Edge protection provided for a new client on a large industrial unit for roof maintenance.
Unbelievably a lot of so called ‘scaffold company’s’ still use the out dated ‘A’ frame method or similar for providing edge protection around roofs which means that the scaffold sits on the roof which needs to be worked on, and also that scaffolders have to get on to the roof to erect the ‘A’ frame without any form of protection which is a massive no no for obvious reasons.
The proper method as you see here is to build several support towers which carry the edge protection thus keeping the roof clear to be worked on. Also more importantly it means that our scaffolders can erect the edge protection standing on the towers without having to step foot on the roof before having any protection or any anchor point to clip on to.
Well done the the Brennan lads again.
Well done to the lads for completing this 10m high scaffold inside a church in just one day, true grafters 💪🏼.
The client is cleaning the organ which involves removing ALOT of pipes of all different sizes and taking them off for cleaning, then bringing back and re-fitting them. The only problem is the organ/pipes are between 7-12m above the floor which is where we come in - after a site visit we decided on a birdcage scaffold with a working deck at the foot of the organ (7m high) so the pipes can be walked from the back of the organ and packed into wooden crates on the scaffold. In order to get the crates to the ground we suggested an overhead gantry with a ‘Niko’ runway system and an electric hoist, so the crates can be lifted off the scaffold, pushed out over the edge and lowered to the ground safely, reducing a lot of manual labour, meaning a faster turn around overall. This process can then be repeated when the pipes return from cleaning and can be raised and fitted back into place, a very effective system ✅.
This is what sets us apart, our depth of knowledge and experience allows us to take a clients needs and devise an effective and cost efficient plan to meet everybody’s needs, all with a rapid turn around and 100% satisfaction guaranteed.
Brennan Scaffolding Ltd 🔩🔧
Birdcage scaffold erected for access to fit false ceiling at one of our sites in Walsall. We built over and around the stairwell in order to retain access to the 1st floor as not to pi** the plaster boarders off 😂.
14m Beambridge over fragile roof with middle ‘spine beam’ anchored to the building using sheer brackets.
Basic scaffolds erected for new signs to be fitted at Costa Coffee Reedswood Way
Access scaffolds erected in the Jewellery Quarter for access to roof for repairs.
Here the client needed access to the overhead ducts/pipes in order to re-lag them but needed to retain clear access to the tank (left) so we built a birdcage scaffold underneath the ducts/pipes and cantilevered one side ✔️🔥
25m high 6ft wide tower scaffold to provide safe access to the top of the spire to repair the lightning strip on Birmingham Childrens Hospital ⚡️⚡️
Multi level scaffold erected to this shop frontage for painting and decorating works. Due to the high st being so busy in normal times, our team had to erect this between 4.30 & 7.30am (last summer) which they did so with time to spare 🔧⏰
Independent scaffold with support buttress for renovation works on the front of this old building
Access tower & edge protection around this massive submarine part for welding work ⚡️🔥
Basic Scaffold To The Front Of A Domestic Property For Decorating We Did In The Summer.
Put Your Hands Up If You Can’t Wait For The Warmer Weather 🙋♂️🙋♂️🙋♂️🙋♂️🙋♂️🙋♂️🙋♂️
Reedswood Way - 80m Heavy Duty Scaffold For Blockwork With Loading Bay.
Nice Fast Work Doing Straight Runs Like These, Every Scaffolder Loves Them 🤪🤓
Reedswood Way - Lift Shaft Scaffold, Built From The Ground Up With Only The Top 2 Levels Boarded So The Lift Guys Can Test The Lifting Eye
Another Birdcage Scaffold 😅, This Time Hanging From The Steel Girders In The Roof Of This Industrial Building.
To Build This We Had To Utilise An Alloy Tower Scaffold To Get Us Up There Safely And Erect And Dismantle Several Times In Different Locations, Nice And Safe 😍.
We Also Had To Build A Small Tower For The Ladder To Reach Properly And Safely.
Reedswood Way - Triple Edge Protection To Roof Of Offices Using Double Puncheons Inline With The Design 🗒
Reedswood Way - Birdcage Scaffold Over Stairs For Access To Ceiling
Awkward Chimney Access For Roofer Made Easy By Us 🔩🔧
Claire’s Accessories HQ - Tiered Birdcage Scaffold Inside The Auditorium Over The Seats For Access To False Ceiling To Fit Sprinklers 💦🔥
Another wet & late night last week fitting these contemporary roller blinds to the temporary workshop we built 😆.
Well done to the lads for building this temporary roof in just 2 days on very short notice last week.
The client, a car salesman needed a temporary work shop while he was having work done to his existing workshops.
Once again the lads pulled it off working through torrential rain and continuing until 10pm to get the job complete on time, a happy team is a productive team and it shows here 👏🏼.
Here at Marstons Brewery, the client required access to change the ‘Marstons’ window sign above the Foyer. So we erected a small tower either side then connected the 2 with beams to span over the foyer, then built 2 working lifts up to access the sign. Erected on a Friday evening and dismantled early the following Monday morning before the staff arrived for work.
Nice little job to provide access to fit solar panels at the top of this roof.
A project we completed recently for painting, chimney work and sign replacement on this pub in Pelsall.
Phase 1 of a new site we started today in Walsall. 115m of triple edge protection around perimeter and up and around stairs/landings completed in just over half a day.
Tidy little stair tower we built on site at Walsall Hospital 🏥
Another One Of Our Larger Projects We Started Last Week, Well Done To The Team Who Only Took 4 Full Days To Complete 😅😅
#
Newest Member Of The Brennan Fleet 😍.
Massive 4.6 Tonne Payload, Euro 6 CAZ Compliant And Best Of All Automatic Gearbox 😁.
Another Scaffold For Painting On These Victorian Houses 🏠