C J Renovations LTD
Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from C J Renovations LTD, Construction Company, .
Scaffolding gone.
Nice to see the final results π€©
Now onto finishing the inside before the big man comes π
πβοΈπ·π»ββοΈπ·π»ββοΈ
The way to a builders heart β€οΈ ππ»π·π»ββοΈπ·π»ββοΈ
And the outside of loft conversion is 100% complete π π₯³
Here are some before and after pictures ππ»
Very happy builders and customer π·π»ββοΈπ·π»ββοΈ
Lots more complete on loft conversion
Cedral Lap cladding on dormer and gable β
Small window installed to gable β
GRP roof complete β
All roof tiles on β
Dry ridge system installed β
Ridge tiles on β
Roof end cemented in β
100mm kingspan in pitched ceiling and dormer walls β
75mm kingspan in flat roof β
Vapour barrier layer β
50mm kingspan in counter battens β
Stud walls up β
Stair case handrails on β
The end is in sight ππ·π»ββοΈπ·π»ββοΈ
3 years since the start of C J Renovations ππ₯³
Here is some before and after pictures of work we have completed over the years π
Please like and share our business page ππ»
More progress on loft conversion.
Windows installed in dormer β
Large velux installed β
All tiles back on front of roof β
Lots of lead work complete β
18mm OSB T&G board on flat roof β
Edge trims for cladding on dormer β
One more week and the outside will be complete ππ»π·π»ββοΈπ·π»ββοΈ
End to another great week π
Felt and batten on β
150 x 50mm C24 timber dormer frame built β
12mm OSB board to external walls of dormer β
Tyvek house wrap β
22mm chipboard T&G flooring complete β
New staircase β
Lots more changes next week ππ»π·π»ββοΈπ·π»ββοΈ
More progress on loft conversion
Roofline complete all round β
soffit, facia and gutter on β
Over facia vents β
Stainless steel screws on gutter and vents β
Felt support trays β
Gable wall complete β
Now time to felt and battern the roof ππ»π·π»ββοΈπ·π»ββοΈ
Another good week on loft conversion
175 x 50mm c24 timber plates bolted every 400mm to steel beam β
175 x 50mm c24 timber roof rafters complete to front and back of roof β
Soffit to front built back out β
Doubled up rafters for large velux opening β
150 x 50mm c24 timber dormer frame β
150 x 50mm c24 timber dormer flat roof rafters β
This time next week we will finally have a water tight house again π
π₯³ π·π»ββοΈπ·π»ββοΈ
Loft conversion.
Cleaned and removed existing roof tiles β
New cavity gable block wall β
178x102x19 steel beam above baywindow β
203x133x23 steel beam on ridge β
Window opening on new gable β
Concrete lintels β
First fix electrics β
First fix plumbing β
175x50mm C24 timber triple support beam β
Staircase trimmers in β
175x50mm C24 timber on loft floor, M12 bolts and noggins every 600mm. β
30x3mm Twisted straps β
Padstones and steel beams all signed off by a very happy building control inspector β
Massive thanks to our brothers Ray and Alex Bloomfield for helping us lift the massive steel beam from ground to ridge πͺπ»ππ»
Now on to the roof and dormer π·π»ββοΈπ·π»ββοΈ
Recent garage roof replacement.
Original asbestos removed by professionals β
Replaced old crumbling concrete lintel β
Coping stones off and wall lowered to back and sides β
Some new brick work to front of garage β
8x2β timber rafters and 18mm T&G OSBβ
Facia, flat board and gutter β
Cure it GRP resin roof system β
No more leaking roof for this customer π§ππ»
One very happy customer and builders once again ππ·π»ββοΈπ·π»ββοΈ
Full Bathroom and Kitchen Renovation
Complete rip out β
New copper pipe work and wastes β
All new electrics β
Insulated ceiling β
Moister-boarded bathroom β
Plastered walls and ceiling β
Fresh new UPVC windows β
Bathroom suite installed β
Full kitchen installation β
Laminated flooring throughout ground floor β
Amazing results again. ππ»
Happy builders and customers π·π»ββοΈπ·π»ββοΈ
A recent velux window installation. πͺ
It really has transformed this small dark claustrophobic room into a bright ventilated room.
Very happy customers and builders π·π»ββοΈπ·π»ββοΈ
Full en-suite bathroom renovation
All old plasterboard and floor ripped out β
Took out the half stud wall β
New spot lights and extractor fan β
Copper pipe work and new shower pump β
3 way mixer valve shower β
Recessed heated light up mirror β
FIBO Tile Effect panelling- perfect panelling β
Double floating basin and square toilet β
1800mm x 500mm towel rail in black β
Flooring to go down soonππ»
Very happy customer and builders π·π»ββοΈπ·π»ββοΈ
Warm room complete β
Before and after pictures ππ»π€©π€©
Happy builders and customers π·π»ββοΈπ·π»ββοΈ
Recent fireplace π₯
Took down all faced brick walls β
Installed larger concrete lintel to main fireplace β
Reinforced concrete floor β
Built block walls for new supporting lintels β
Enlarged fireplace opening β
Double timber frame to support 2 ceiling joists β
12mm construction/ fire board used inside fireplace, fire plasterboard on outside β
Access to chimney opening for flue lining in future β
Nothing combustible at all within fire opening β
Multifinish plaster β
Natural blue lias stone hearth β
New skirting boards β
Amazing end result π€©
Very happy customer and builders π·π»ββοΈπ·π»ββοΈ
Beautiful π€©
Latest warm room extension.
Old conservatory, joining alley taken down β
Course of blocks on base β
4 x 2β timber frame β
8 x 2β timber roof joists & wall plate with resined in bolts every 400mm β
Canopy to back and front β
22mm osb board on external frame and 18mm osb board on roof β
Felt, batten and Freefoam Fortex External PVC Cladding Weatherboard in slate grey β
New UPVC windows and doors β
150mm kingspan insulation in ceiling and 75mm kingspan in walls β
First fix electrics and plumbing β
GRP roof system β
Scratch coat of render on blocks β
All walls and ceiling plaster-boarded with moister board β
Now onto the finishing stage of the build π·π»ββοΈπ·π»ββοΈππ»
Re-roof complete ππ»
Wobbly chimney taken down β
Soil pipe cut down below roof with air admittance valve β
New fascia, soffit and gutter β
New felt and batten β
New cement boards and felt support trays β
All new dry ridge system and ridge tiles β
Cleaned all old tiles β
From a bad leaking roof to a nice and watertight roof π€©
Very happy customers and builders ππ·π»ββοΈπ·π»ββοΈ
What a perfect week to start a re-roof βοΈβοΈβοΈ
The only way to move tiles quickly π·π»ββοΈπ·π»ββοΈπͺ
Looks like a completely different house ππ»π·π»ββοΈπ·π»ββοΈ
Leaking roof repaired β
Felt support trays β
Take down lath and plaster ceiling β
Insulated ceiling and wall β
Moister plasterboard β
Two new radiators β
Fresh skim of plaster β
This small extension was once the coldest room in the house now it is the warmest βοΈπ₯
A warm and happy customer π·π»ββοΈπ·π»ββοΈ
Kitchen Renovation Complete π€©π€©
The final results are amazing ππ»
Check out the before and after pictures!
Very happy customers and builders π·π»ββοΈπ·π»ββοΈ
We wish you all a very merry Christmas ππ
Here are some before and after pictures of our work over the last 12 months π·π»ββοΈπ·π»ββοΈ
Thank you to all our customers.
See you all in 2023 π
Phase 3 - Kitchen Renovation
Basin and toilet installed β
Kitchen fitted β
Integrated fridge, freezer and dish washer β
Compact laminate stone effect worktops β
Tongue and grove profiled cladding for splash back β
Natural slate for sink and hop splash backs β
Reclaimed Barn door β
New heating pump installed β
Double column anthracite radiator β
Belfast sink and copper tap β
We are back in the new year for the finshing touches ππ»
What a transformation π
Very happy builders and customers π·π»ββοΈπ·π»ββοΈ
Phase 2- Kitchen Renovation
Exposed natural stone wall, raked and re-pointed in lime mortar β
3 steel beams signed of by building control β
Ceiling boarded, plastered leaving timbers on show β
Opened up and exposed original timbers on stairs β
Plumbing to new down stair toilet, basin and radiators β
Dividing stud wall β
Took up old floor and self levelling compound down β
Amtico linden oak flooring β
On to second fix plumbing and installing the kitchen ππ»ππ»
Very happy customers and builders π·π»ββοΈπ·π»ββοΈ
Updated sign writing on the work horse π π πππ»
Phase 1 - kitchen renovation.
Needle supports through 450mm solid blue lias wall β
Take down 450mm wall β
Pad stones 600mm x 150mm x 140mm β
152mm x 152mm x 23UC size steels x3 β
All completed exactly to the structural engineers report β
When two rooms become one β
Lots more construction work to do before kitchen can be installed π·π»ββοΈπ·π»ββοΈ
Full bathroom renovationβ¦
Removed old rotten floor, plasterboard walls β
New 18mm moister board floor β
12mm tile backer board on walls β
Ceramic tiles on floor and walls β
Shower pump β
Nice new floating basin, heated light up mirror, p shape bath and close couple toilet β
Overflow filled bath and shower mixer β
Towel rail β
Very happy customers and very happy builders π·π»ββοΈπ·π»ββοΈ
Please share and like our Facebook business page!!!
We have new contact details βοΈ π§
Give us a call, email or Facebook message for a free quotation π·π»ββοΈπ·π»ββοΈ
New boiler installationβ¦.
System change from open vent to Worcester Bosch combi boiler β
13 new radiators and 1 towel rail β
All new TRVβs and lock shield valves β
Bosch EasyControl app controlled room stat β
Pipe work lagged in boiler room β
A very warm and happy customer π
π·π»ββοΈ
Warm room complete π€©π€©
GRP roof β
Two new radiators and washing machine connections β
Tiled floor β
Fresh white paint β
New skirting β
Second fix electrics β
Check out the before and after pictures π²
Very happy customers and extremely happy builders once again π·π»ββοΈπ·π»ββοΈππ»
Lots more progressβ¦.
100mm kingspan in the ceiling β
Freefoam Fortex External PVC Cladding β
External walls and steps rendered β
Moister board plasterboard inside β
Walls skimmed β
Now onto finishing this warm room π·π»ββοΈπ·π»ββοΈ
We are now officially C J RENOVATIONS LTD π
Warm room is starting to take shapeβ¦..
Reinforced insulated concrete floor β
4x2 timbre frame for walls β
9x2 lintels and wall plate, 8x2 roof rafters β
New windows and doors β
First fix plumbing and electrics β
75mm kingspan insulation in walls β
Felt and batten β
18mm OSB boarded roof β
Now onto the finishing side of things π·π»ββοΈπ·π»ββοΈ
Start of a new warm room extension.
Took down old extension β
Tied existing base to house using heli-bar and resin β
Blocked up to new level floor height β
New damp proofing membranes β
Insulated floor β
Reinforcing mesh tied to house and block work β
Radiator pipes under floor and raised drain β
All prepped and ready for the 100 mixβs of concrete π·π»ββοΈπ·π»ββοΈπͺ
The start of a new warm roomβ¦β¦β¦οΏΌπ
π
Not only do we have to get rid of all the waste like this we have to bring all the new materials down tooπͺπͺπ·π»ββοΈπ·π»ββοΈ