PTbuilds.co.uk

PTbuilds.co.uk

Pt builds - For all aspects of building and home improvements/renovation

Photos from PTbuilds.co.uk's post 27/05/2024

Before and after en suite makeover.
Converted original ‘Jack and Jill’ en-suite room into just a single modern en suite. Wall blocked up, re tiled, re plastered, painted, new shower, shower enclosure, sink, radiator and toilet

Photos from PTbuilds.co.uk's post 19/02/2024

Latest kitchen install. The works included the removal of a load bearing wall with new rsj sunk into the ceiling as high as it would go. Full kitchen rewire. Plastering of the entire room. Full kitchen install Inc. Plumbing. Floor levelling and installation of Karndean flooring.

11/02/2024

New wardrobe doors handmade, painted and fitted to replace the old doors which were damaged

Photos from PTbuilds.co.uk's post 11/02/2024

Herringbone flooring supplied and fitted before kitchen installation

Photos from PTbuilds.co.uk's post 11/02/2024

Bespoke Storage wardrobe/units made to measure

Photos from PTbuilds.co.uk's post 11/02/2024

Bespoke Media wall. Handmade and painted

13/05/2023

A problem with the drain …. No problem trying to find the cracked pipe with my two helpers!
🤣👷‍♀️🐕

Photos from PTbuilds.co.uk's post 17/01/2023

Bespoke bar and matching record/music unit.

Photos from PTbuilds.co.uk's post 17/01/2023

Latest kitchen installation before and after

Photos from PTbuilds.co.uk's post 05/01/2023
Photos from PTbuilds.co.uk's post 05/01/2023

Another cellar conversion!
This house had two very damp and dark vaulted cellars. We converted one cellar into a bar (see previous post) and the other cellar into a cloakroom/downstairs toilet.

Photos from PTbuilds.co.uk's post 05/01/2023

This room started as very dark and damp
Cellar. It was unhabitable until we turned it into a home bar! 🍸🍾🍹

Photos from PTbuilds.co.uk's post 30/11/2022

Latest job completed....
Customer wanted more light in their dining room and easy access to the garden from the rear of their property.

Photos from PTbuilds.co.uk's post 18/11/2022

Latest job…..
flood damaged kitchen.
wet flooring removed, two industrial dehumidifiers supplied to dry out the building. plaster removed to 1m and then re plastered using lime plaster. New kitchen and flooring installed, and all walls and skirting given a base coat of white paint.

Photos from PTbuilds.co.uk's post 20/10/2022

New labourer helping me at the weekend!

22/09/2021

Today's Rockdoor installation

Photos from PTbuilds.co.uk's post 26/04/2021

Recent porch upgrade..we replaced the rotten timber frames with new architectural aluminium frames with insulated Grp fiberglass roof. Future job is to replace the balustrade for frameless glass.

Telephone

Opening Hours

Monday 09:00 - 17:00
Tuesday 09:00 - 17:00
Wednesday 09:00 - 17:00
Thursday 09:00 - 17:00
Friday 09:00 - 17:00