O.B Construction
*Extensions *Alterations *Steel work *Maintenance *Landscaping *All aspects of walling *Newbuilds.
External before and after. Next post internal completion ๐คฉ
Little job in Narborough recently completed.
Consisted of knocking through to create an open plan kitchen diner, steel up, new spotlights, overboard the ceiling and skimmed up, kitchen supplied by the customer and fitted by us.
Cosby Extension coming along ๐งฑ๐งฑ
Watertight โ๏ธ
Progress at Narborough. Ready for roof to be tiled tomorrow ๐ช๐ผ
Meeting with Building Control complete. โ๏ธ Survey complete for party wall agreement. โ๏ธ structural calcs in place โ๏ธ outbuildings coming down ready to set out and excavate โ๏ธ
Progress on our Bungalow extension in Littlethorpe. ๐งฑ
Progress being made at Elmesthorpe. This build is the first โPassivhausโ Eco energy efficient house to be built under the local council so quite a privilege to be building it. Looking forward to the end result ๐งฑ๐งฑ
Knock through in Braunstone Town. Structural calcs and steel supplied and fitted.
Blaby coming along nicely.
All steels are now in and electrics nearly first fixed ready to insulate the roof. ๐งฑ๐จ๐๐ผ
Blaby job coming on nicely.
Roof on next week then inside to start knocking some walls through ๐จ
Verges repointed for a customer after the existing mortar was falling out.
Narborough extension continued..
Extension in Blaby underway ๐งฑ๐จ
Couple of Chimneys rebuilt in Cosby. I donโt think these would have seen many more winters. A good job done and the roofer can flash into the stack properly now instead of crumbling bricks ๐๐ผ๐งฑ
Small job we did. Poor ground and small foundation equals subsidence. Underpinned with more concrete and brickwork rebuilt.
Small steel job we did recently in Oadby. Wall taken down and steel installed to support existing floor joists ready to be boarded and skimmed.
Old weathered crumbling Arch taken down and rebuilt with a blue brick feature, creasing tile with brick on edge and flaunched off. I enjoyed this one ๐๐ผ
Open Oak Porch built in Ibstock nearly complete. Ready to be slate roofed and composite door to be installed. 2 more windows to have plinths laid aswell ready for new window installation. A great customer to work for aswell ๐๐ผ
Brickwork taken out and a new opening formed for a set of 3m Bifolds. Steel installed to carry masonry above and middle wall taken out and double joist installed to carry existing joists.
Autumn Brown sandstone patio laid in Glen Pava. Old unsafe slabs removed, ground reduced for a less intrusive area and steps built to access it with a retaining blue brick wall.
Conservatory knocked down and single story going up in Narborough ๐๐ผ
A porch canopy to a built in porch. Awaiting composite door with glazed side panels, plasterer and ceiling spotlights.
Videos (show all)
Contact the business
Telephone
Website
Opening Hours
Monday | 08:00 - 17:00 |
Tuesday | 08:00 - 17:00 |
Wednesday | 08:00 - 17:00 |
Thursday | 08:00 - 17:00 |
Friday | 08:00 - 17:00 |
Saturday | 08:00 - 13:00 |