O.B Construction

O.B Construction

*Extensions *Alterations *Steel work *Maintenance *Landscaping *All aspects of walling *Newbuilds.

Photos from O.B Construction's post 12/06/2024

External before and after. Next post internal completion ๐Ÿคฉ

Photos from O.B Construction's post 24/05/2024

Little job in Narborough recently completed.
Consisted of knocking through to create an open plan kitchen diner, steel up, new spotlights, overboard the ceiling and skimmed up, kitchen supplied by the customer and fitted by us.

Photos from O.B Construction's post 09/04/2024

Cosby Extension coming along ๐Ÿงฑ๐Ÿงฑ

Photos from 1st Choice Fencing & Property Services's post 02/02/2024
31/10/2023

Watertight โœ”๏ธ

Photos from O.B Construction's post 06/10/2023

Progress at Narborough. Ready for roof to be tiled tomorrow ๐Ÿ’ช๐Ÿผ

Photos from O.B Construction's post 08/08/2023

Meeting with Building Control complete. โœ”๏ธ Survey complete for party wall agreement. โœ”๏ธ structural calcs in place โœ”๏ธ outbuildings coming down ready to set out and excavate โœ”๏ธ

Photos from O.B Construction's post 22/07/2023

Progress on our Bungalow extension in Littlethorpe. ๐Ÿงฑ

Photos from O.B Construction's post 27/04/2023

Progress being made at Elmesthorpe. This build is the first โ€˜Passivhausโ€™ Eco energy efficient house to be built under the local council so quite a privilege to be building it. Looking forward to the end result ๐Ÿงฑ๐Ÿงฑ

Photos from O.B Construction's post 11/04/2023

Knock through in Braunstone Town. Structural calcs and steel supplied and fitted.

29/09/2022
Photos from O.B Construction's post 29/09/2022

Blaby coming along nicely.
All steels are now in and electrics nearly first fixed ready to insulate the roof. ๐Ÿงฑ๐Ÿ”จ๐Ÿ‘Œ๐Ÿผ

Photos from O.B Construction's post 09/09/2022

Blaby job coming on nicely.
Roof on next week then inside to start knocking some walls through ๐Ÿ”จ

Photos from O.B Construction's post 24/08/2022

Verges repointed for a customer after the existing mortar was falling out.

Photos from O.B Construction's post 17/08/2022

Narborough extension continued..

Photos from O.B Construction's post 17/08/2022

Extension in Blaby underway ๐Ÿงฑ๐Ÿ”จ

Photos from O.B Construction's post 17/08/2022

Couple of Chimneys rebuilt in Cosby. I donโ€™t think these would have seen many more winters. A good job done and the roofer can flash into the stack properly now instead of crumbling bricks ๐Ÿ™Œ๐Ÿผ๐Ÿงฑ

Photos from O.B Construction's post 17/08/2022

Small job we did. Poor ground and small foundation equals subsidence. Underpinned with more concrete and brickwork rebuilt.

09/08/2021

Small steel job we did recently in Oadby. Wall taken down and steel installed to support existing floor joists ready to be boarded and skimmed.

Photos from O.B Construction's post 28/06/2021

Old weathered crumbling Arch taken down and rebuilt with a blue brick feature, creasing tile with brick on edge and flaunched off. I enjoyed this one ๐Ÿ‘Œ๐Ÿผ

Photos from O.B Construction's post 28/06/2021

Open Oak Porch built in Ibstock nearly complete. Ready to be slate roofed and composite door to be installed. 2 more windows to have plinths laid aswell ready for new window installation. A great customer to work for aswell ๐Ÿ‘Œ๐Ÿผ

Photos from O.B Construction's post 30/05/2021

Brickwork taken out and a new opening formed for a set of 3m Bifolds. Steel installed to carry masonry above and middle wall taken out and double joist installed to carry existing joists.

Photos from O.B Construction's post 01/05/2021

Autumn Brown sandstone patio laid in Glen Pava. Old unsafe slabs removed, ground reduced for a less intrusive area and steps built to access it with a retaining blue brick wall.

27/03/2021

Conservatory knocked down and single story going up in Narborough ๐Ÿ‘Œ๐Ÿผ

Photos from O.B Construction's post 27/03/2021

A porch canopy to a built in porch. Awaiting composite door with glazed side panels, plasterer and ceiling spotlights.

Videos (show all)

Glen Parva job coming along nicely. Next reel.. stud wall for the utility, everything plastered and kitchen fitted ๐Ÿคฉ
The finished results at the Blaby job last year ๐Ÿ‘Œ๐ŸผStill not sure about the catflap in the bifold door but what the custo...

Telephone

Website

Opening Hours

Monday 08:00 - 17:00
Tuesday 08:00 - 17:00
Wednesday 08:00 - 17:00
Thursday 08:00 - 17:00
Friday 08:00 - 17:00
Saturday 08:00 - 13:00