AK Engineering - Nottm. Ltd.

AK Engineering - Nottm. Ltd.

For all your steam boiler and equipment requirements from sales and repair, to maintenance and annual insurance inspection preparation, in all industries.

Photos from AK Engineering - Nottm. Ltd.'s post 17/04/2024

Bradlee Boiler preparations for annual insurance inspection and 5 yearly NDT

Photos from AK Engineering - Nottm. Ltd.'s post 15/11/2023

Multi tubular horizontal steam boiler full service and placed back on line

Timeline photos 13/11/2023

Gestra Water Sample cooler supplied new and fully installed at a local Micro Brewery.

Timeline photos 08/11/2023

Nabic 542 safety valve supplied new and fitted.

Timeline photos 06/11/2023

Camptel Master knitwear Press repaired and back online for longstanding valued customer.

Photos from AK Engineering - Nottm. Ltd.'s post 01/07/2023
Photos from AK Engineering - Nottm. Ltd.'s post 19/06/2023

New Clifton Reflex gauge glass fitting supplied and fitted to a Fulton VSRT. Customer back up and running with minimal downtime

19/09/2022

Trouble shooting on a Fulton J series boiler.

12/09/2022

Veit boiler breakdown, new parts supplied and fitted, one happy customer.

08/09/2022
05/09/2022

Sample cooler supplied and fitted at a local brewery

Photos from AK Engineering - Nottm. Ltd.'s post 29/08/2022

Longditudinal seam weld fully prepared for 5 yearly NDT.

22/08/2022

Another boiler, reconditioned and sold to a happy customer.

06/07/2022

Bailey G4 pressure reducing valve installed and commissioned.

Photos from AK Engineering - Nottm. Ltd.'s post 29/06/2022

Fulton multi tubular boiler prepared for 5 yearly NDT

Photos from AK Engineering - Nottm. Ltd.'s post 22/06/2022

Second hand Camptel boiler shell supplied, hydrolically tested with the insurance company present, fully installed and ready to go!

15/06/2022

All pipework and valve installation and maintenance undertaken

08/06/2022

Heat exchanger fully tested and dye machine back on line

01/06/2022

New water feed pump supplied and fitted Engineering

02/05/2022

Bailey G4 pressure reducing valve installed and commissioned.

31/01/2022

Comel curtain table with boiler, preparation for annual service and insurance inspection.

16/01/2022

ICI multi-tubular boiler prepared for annual service inspection

06/12/2021

Brand new Sirovap steam boiler, iron and heated vaccum board complete with sleeve arm supplied and installed for a local university

Photos from AK Engineering - Nottm. Ltd.'s post 07/06/2021

Inspection work carried out at a company well known for their blinds and curtains.
Please contact me on 07770474807 if you require any repairs or inspection work on your steam boilers or equipment, big or small.

Photos from AK Engineering - Nottm. Ltd.'s post 20/05/2021

We also specialise in Fulton steam boilers of all sizes.
Give me a call on 07770 474807 if I can help in any way.
Please share, thank you. 😀

Videos (show all)

Merry Christmas and a happy New Year to everyone Let’s all hope 2021 is a better one for us all

Telephone