HKonstruction

HKonstruction

REGISTERED & INSURED!
>>Side Jobs only

Photos from HKonstruction's post 04/05/2024

Deck repair. Fixed the railings, a few deck boards, and then the center stringer dry rotted causing a safety issue. We cut a new one and then replaced all the tread boards.

Photos from HKonstruction's post 13/04/2024

We fixed the railing posts that were wobbly in the centers of each railing. We also fixed some top boards, and some deck boards. Also fixed the lattice underneath and added a new piece.

Photos from HKonstruction's post 31/03/2024

Some repointing we did over the past couple days on two houses. The previous person who did restoration had put caulk in the brick along the rowlocks and also some other areas so it all needed to be repointed.

Book for restoration now!

Photos from HKonstruction's post 14/03/2024

Quick and easy. Book now warm weather is approaching look at all our services!

Photos from HKonstruction's post 03/03/2024

Honey do list is what we call this one! Got everything the homeowner needed done. House is going up for sale soon! Keep booking.

Photos from HKonstruction's post 18/02/2024

New paint job, light, and mirror with storage put in. Brighten up the bathroom with a brighter color and more modern with the new fixtures!

Photos from HKonstruction's post 21/01/2024

Bathroom freshly painted with a brighter color and new tub added makes this bathroom look way better l.

Photos from HKonstruction's post 15/01/2024

Some painting from this past weekend at Charlie’s transmission. More will be getting painted and remodeled within this room and building so stay tuned! Thank you.

10/01/2024
18/12/2023

It’s never too late to book with us. Check out our services and shoot us a message! Thank you to all the customers who booked with us throughout this year.

Photos from HKonstruction's post 29/10/2023

Some concrete jobs we have done over the course of a week. Get with HKonstruction for any construction work you need done.

Photos from HKonstruction's post 30/09/2023

Little patch work done today. All though it’s only a temporary patch we still want it to look good.

Temporary patches still can last a long time if they are done correctly. On to the next one.

28/09/2023

We are looking to get people on the schedule for inside work. Drywall, painting, handyman, flooring, tile. Winter is coming and we want to satisfy everyone all year around.

Thank you, Hunter

Photos from HKonstruction's post 17/09/2023

Chimney repointing. The chimney cap was still in good condition and only the top half of the chimney needed to be fixed!

We do chimney work but only if the roof is safe to be on.

Photos from HKonstruction's post 11/09/2023

Out with the old & in with the new. Transformed this entire family room!

Also did some other projects around the house as well.

Keep checking in with us to see some other things that will be going on at this house.

Photos from HKonstruction's post 06/09/2023

Smaller job from over the weekend.

Step sunk overtime and separated from the house.

The owners wanted 8 inch step up into the house.

Also did some patch work and patched the driveway where there was a gap.

( used bagged concrete so had to wait to strip it )

Photos from HKonstruction's post 21/08/2023

A pour from over the weekend. Trash can pad for a customer.

Photos from HKonstruction's post 06/08/2023

Something a little different then we do usually. It was previously put in but, was swaying because it was not in the ground deep enough and was only put into the dirt.

Flagpole required 2 feet of depth and 4-6 times the diameter of the sleeve wide. Concreted poured around it.

On to the next one!

Photos from HKonstruction's post 06/07/2023

Quick board repair on a deck. Home owners are going to be repainting the deck. Just needed a few replaced for now.

Photos from HKonstruction's post 01/07/2023

New sidewalk put in. So glad the rain held off and moved out so we can get this done !!

Thanks Dominic Starzi and the Starzi Brothers for excavating this for me.

Photos from HKonstruction's post 28/05/2023

12ft by 20’ wooden deck
Pressure treated wood and waterproofed ledger board.

Space on the sides for some storage, beautiful addition for grilling and lounging with the nice weather approaching!

Photos from HKonstruction's post 08/05/2023

We officially added epoxy concrete to our services. This is a small epoxy job.

Painted the railings with a glossy black finish.

Epoxied the steps and used a rough texture and flakes for grip when it rains and snows.

We can do small jobs like these and even garage floors as well.

Photos from HKonstruction's post 15/04/2023

NEW RAILING added to the concrete steps and sidewalk we did.

Covered the railing with a tarp since rain is coming and going to wait until the pressure treated wood is dried out, before coating it with a waterproof sealer.

Photos from HKonstruction's post 02/04/2023

We don’t tend to work on Sundays but when a job needs to get done, it’s got to get done.

New sidewalk and steps put in!

Let’s keep rolling.

Photos from HKonstruction's post 25/03/2023

What a good day for a demo day. Just beat the rain before it started to come down too hard.

Owner is putting in a paver border. There was a drain pipe running all the way down through the existing concrete.

Photos from HKonstruction's post 24/03/2023

HKonstruction is staying busy with jobs currently in progress and others scheduled. Reach out to HKonstruction by phone number, email or the Book Now button to schedule for an appointment.

Also we came up with a design for hats. If you would like to purchase one or give feedback on them we would highly appreciate it!

Thank you.

Photos from HKonstruction's post 13/03/2023

Quick and easy, scrap wood the owners had already, and the pipes were tightened that’s why there is alittle leakage on the new wood. There was a leak before and the wood underneath was not replaced properly.

Photos from HKonstruction's post 09/03/2023

Another paint job done!

- Patched drywall that needed to be fixed from holes in the wall.

-Painted the ceiling and walls all one color.

-The trim and closet door were painted with the same color but a semi gloss.

Thank you guys for keeping me going.

Photos from HKonstruction's post 27/02/2023

The new business cards did come in. If you guys have the old cards from the previous name let me know and I can get you some new cards.

Also in the works, we have a hat it has been designed already but have not decided the final look yet.

Thank you everyone for supporting HKonstruction and let’s keep growing!!!

Photos from HKonstruction's post 30/01/2023

Finished drywall patches done, scroll through feed to see the before and afters of this job.

WHAT WE ARE ABOUT

We are about honesty, excellence, and overall hard work!

Our best efforts are put into all jobs and the customer’s opinion matters most.

This was founded and owned by Hunter Killinen, who is currently a student at Williamson College of the Trades studying Masonry. Coming out of college, he wishes to grow this business successfully in and out!

This is currently SIDE WORK only, feel free to call about any job needed in the Pennsylvania and Delaware area.

Videos (show all)

Our indoor services!

Telephone

Opening Hours

Friday 07:00 - 17:00
Saturday 07:00 - 17:00
Sunday 07:00 - 17:00