Kwgu Water Engineer Nigeria Limited

Kwgu Water Engineer Nigeria Limited

You may also like

Jamesfab702
Jamesfab702

We specializes mainly in Borehole drilling both manually and machinery method, Geophysical survey, p

28/01/2022
Photos from Kwgu Water Engineer Nigeria Limited's post 07/10/2021
Photos from Kwgu Water Engineer Nigeria Limited's post 08/06/2021

Reverse osmosis 1.3 Million...

Photos from Kwgu Water Engineer Nigeria Limited's post 24/05/2021

For sale...

07/05/2021

Drilling in progress.

15/04/2021

How to flush a water borehole

The water rises along the rod on its outer side, between the walls of the borehole and the rod, with such a velocity that the broken rock fragments are carried up by this water current (direct flushing ).
Alternatively, water enters the borehole around the rod and issues upwards through the rod (indirect flushing ).

14/04/2021

The determination of depth to freshwater aquifers and lack of geophysical borehole log data to help borehole developers in the design of borehole have long been identified as a problem in coastal areas.

10/04/2021

Geophysical survey report for the purpose of water borehole drilling..

26/03/2021

Definition of flushing
i. A drilling method in that water or some other thicker
liquid, such as a mixture of water and clay, is driven into the
borehole through the rod and bit. The water rises along the
rod on its outer side, between the walls of the borehole and
the rod, with such a velocity that the broken rock fragments
are carried up by this water current (direct flushing).
Alternatively, water enters the borehole around the rod and
issues upwards through the rod (indirect flushing).

26/03/2021

6 Steps to Controlling
Water Loss in a Bore
Hole

When drilling in highly fractured or broken
ground, you run the risk of hitting a void or
large fracture and having your drill water
escape through that fault. You find yourself
with a dry hole and dry bore holes are a pain
to deal with. You end up drilling blind because
you are not getting any water return and you
will not get an indication that the core is
blocking. No water return also increases the
vibration in the hole, greatly increases your
drilling cycle time and, if you are in an area
with limited water resources , you will not be
able to recycle your water.
When you hit a void or fracture, you will
immediately notice that your water return
suddenly drops off. Here are some suggested
steps to try and control the water loss.
1. The best way to deal with a dry bore hole
is to try and prevent them by using drilling
fluid additives to condition your hole.
Download your guide to mixing drilling
fluid additives here . Drilling additives are
like an insurance policy – well worth it
when trouble happens. Using them
beforehand can allow you to plug up small
cracks and fissures before they become a
problem
2. Identify where the fault is. You can do this
by immediately stopping operations so you
do not drill beyond the fault. If you have
already drilled past the fault, you can
always check your core as it will indicate
where the water fault occurred. You want
to identify the precise location so you can
send down the additives to the right spot,
which is just above the fault.
3. Prepare a “pill” to control your water loss
using an additive made for this, such as
DD X-Pand . Make sure you allow the
mixture to “cure” for half the recommended
time. The additives usually take about 20
minutes to absorb water and reach
maximum volume. You want to send the
mixture down when it is halfway cured, i.e.
10 minutes, so the pill will absorb the
water in the fault effectively.
4. P

10/02/2021

The Water Borehole Drilling Process In 4 Steps

Step 1 – Hydro-geologists site the borehole

The very first thing that needs to be determined is where the water is, and how we’re going to get to it.

That’s why we employ hydro-geologists who make use of a variety of borehole drilling methods to assess the geophysical properties of the underlying area.

These are the guys that help us ensure we’re not drilling into natural hazards or man-made infrastructure (pipelines, cables, phone lines, etc).

Step 2 – Drilling and Construction

Once the hydro-geologists have helped us prep a path for borehole drilling, we follow through and construct the borehole.

It’s not as easy as Moses and the rock, unfortunately, and, contrary to popular belief, an endless supply of water won’t just surge to the surface following the drilling of the borehole; there are still steps to follow and processes to be completed.

Once the borehole has been drilled the necessary unstable lengths of the borehole are steel cased in an effort to reinforce the ‘tube’.

Step 3 – Determining the yield of the borehole

In order to most accurately gauge the yield of a domestic water borehole an aquifer test is performed.

This involves installing a test pump and pumping borehole water for a fixed set of variables; a given time at a given rate, and then assessing the test’s impact on the water level in the borehole.

Maximum yield is achieved by increasing the abstraction rate, ensuring optimum drawdown of water in the borehole.

Step 4 – Pumping and piping the borehole

The kind of pumping system and piping installed in your new domestic water borehole will largely depend on the intended use of the borehole water.

For more information, or to make an appointment to start the process, feel free to contact us via the particulars provided on our Contact page.

Photos from Kwgu Water Engineer Nigeria Limited's post 10/02/2021

Hand pumps are manually operated pumps; they use human power and mechanical advantage to move fluids or air from one ... for both community supply and self-supply of water and can be installed on boreholes.

23/11/2020

Water used for drinking, cleaning fish and ice-making must
be free from pathogenic bacteria and may require
secondary treatment... Will drilling and treat water from bacteria.

23/11/2020

Chlorine tablets kill all bacteria leaving your water clean and
safe. If you are looking for the best ways of treating your
water, Schultz ... Constant Kwgu water Engr. Nigeria Limited

19/11/2020

A FULL GEOTECH...

10/03/2020

Geophysical survey..

10/03/2020

MANUAL BOREHOLE DRILLING..

15/02/2020

Hand borehole drilling operation.. A cheap drilling operation that a poor man can afford it...

14/01/2020

For your hand Borehole at affordable price constant me....

Want your business to be the top-listed Equipment Service in Kaduna?
Click here to claim your Sponsored Listing.

Videos (show all)

Telephone

Website

Address

Kaduna

Other Kaduna equipment services (show all)
MANTA WATER TECH MANTA WATER TECH
38 Kafayawa Street, Sabon Tasha
Kaduna

We're experts in drilling boreholes, Survey, repairing of submersible Pump, flushing and general maintenance of holes

Genuine SRT Parts Shop Genuine SRT Parts Shop
Enugu Abakpa
Kaduna

Dodge.Auto.Parts.For.Sale.USA Get the best deals in the entire MARKET. Shipping✈️ Available!! #mopar#

callmie_alhajy callmie_alhajy
Kaduna

Callmie_alhajy fans

Boris Resources Micro Enterprise Limited Boris Resources Micro Enterprise Limited
CA 2 YARIMA Road KINKINAU KADUNA
Kaduna

Engineering,Construction and Manufacturing Company

Sanni Rabeeu Sanni Rabeeu
Baban Bali Road, Katabu
Kaduna

Adachukwu Adachukwu
Kaduna, BLESSING

Viruz169 Nig Ltd Viruz169 Nig Ltd
# G13 Dan Alhaja Road Barnawa
Kaduna, 800243

Viruz169 Nigerian Ltd. Is an Engineering company, specialist on Electrical, mechanical Installations

Prako integrated concept Prako integrated concept
V11 LAGOS STREET BY ZARIA Road, KADUNA.
Kaduna, 800282

Dealers and suppliers of Building, Plumbing Materials, Tiles and Security Doors.

ibgeneralshehuktc ibgeneralshehuktc
R18 Aminu Kano Street Mando
Kaduna

Usman shehu Usman shehu
1A Jos Road Opp Of Fithchucker Maraban Jos, Katabu
Kaduna

Holley Metering Limited, Kaduna Electric MAP. Holley Metering Limited, Kaduna Electric MAP.
1st Floor, Khemsafe House, 6A/7A Constitution Road
Kaduna

We are both manufacturer and provider of top quality meters, metering products and systems.