AxialStruct

| Civil Engineering
| Building Construction
| Project Management
| 40+ Projects Executed RC 1886598

27/02/2024

Land remains the king of the property market. Inflation or no inflation, this is one investment that will continue to grow in value over time.

With just N950,000, you will become a landlord in a high-growth area like Awka, one of the fastest-developing cities in Nigeria.

Don’t miss out this *Premium Layout*

Photos from AxialStruct's post 07/02/2024

We keep Building.

01/02/2024

Happy February!

Be ready to take on this month with confidence and enthusiasm.

With 28 days ahead of you, be determined to make significant progress towards your goals.

January is already behind you. Be focused on the present and excited about the future.

know that success is within reach, and be confident in your ability to achieve it.

Reinforce your decision to pursue your visions and goals with vigor.

Be ready to follow through on that commitment and take action.

Stop being afraid of challenges and accept the fact that every obstacle is an opportunity to grow and learn.

Remember, you have the power to shape your own destiny.

Embrace this month with confidence and take bold steps towards your dreams.

You have what it takes to make 2024 a year of unparalleled success.

I am rooting for you.

Engr David Emefo
CEO, AxialStruct Limited.

BE INTENTIONAL

Photos from AxialStruct's post 30/01/2024

Great news! Our team of experts has successfully delivered the Soil Investigation Report to our esteemed client in Festac Town, Lagos.

Our team conducted a thorough soil investigation and based on our findings, we highly recommend a Pile foundation as the most appropriate foundation type for the proposed building structure.

Always Engage AxialStruct for Professional Engineering Services.

15/01/2024

FESTAC TOWN, LAGOS.

Photos from AxialStruct's post 13/01/2024

One of our clients consulted us for a building project.

We scheduled a site visit to do our checks.

Prior to producing the construction drawings we advised him on the need to carry out a soil investigation and he accepted.

The only challenge was that the land was a swampy one so we had to sand fill so we could have a solid platform on which we would install our equipment and also carry out a proper soil investigation.

The first phase of the Soil test has been completed and we move to the second phase after which it will take another two weeks to get the soil report for further decisions.

The results of the soil test will show us the features of the soil and recommend the foundation type to be adopted.

At AxialStruct we follow the right process.

Hire Professionals for Professional services.

Photos from AxialStruct's post 09/01/2024

The building finishes stage is a very interesting and expensive phase of a building project.

Interesting, because you get to see the beauty of the exterior envelope and the internal spaces.

Like the foundation stage, the client tends to get touchy here, especially if it is their first time building or if you have one artisan who keeps wasting materials.

Plaster sand, POP materials, wall and floor tiles, paint, etc. are all relatively expensive.

However, the client's taste for interior design comes into play.
Some clients have a knack for specific details while others don't mind.

When you get to this stage of the work, ensure you have talks with your interior designer to furnish you with the cost implications.

If you are a minimalist then you are kind of safe relative to cost.

04/01/2024

GATEHOUSE CONSTRUCTION

📌Concrete Works and Backfilling

03/01/2024

GATE HOUSE CONSTRUCTION

📌Procurement

03/01/2024

GATE HOUSE CONSTRUCTION

📌Levelling Works

03/01/2024

If you have or know someone who has land around Abijo GRA, Ajah Lagos State, please kindly tell them to always engage professionals for their building projects.

Most of them are easily deceived by quacks who tell them that they don't need to carry out soil tests to ascertain the geotechnical properties of the soil and recommend the foundation type for the building.

Many houses within that area experience differential settlement to the extent that the ground floor turns into a basement while the first floor comes down to the level of the ground floor.

Always carry out soil tests on that land before you Build.

Rework is Costly.

03/01/2024

GATE HOUSE CONSTRUCTION

02/01/2024

LUXURY HOTEL CONSTRUCTION

📌Ground Floor Level

02/01/2024

Where the mind goes, the man follows.

Set your mind towards success today and success will follow.

Defy Gravity.

Lagos Nigeria.

02/01/2024

It is a new week.

Be Focused,
Be Resilient,
Be Productive.

AxialStruct

Cheers ❤️🏆🏆🏆

01/01/2024

YOU WILL WIN THIS YEAR 2024.

BE POSITIVE🤝

01/01/2024

May the New Year bring you happiness, peace, and prosperity.

Wishing you a joyous 2024!

Cheers😊🥰

25/12/2023

If you live in Lagos state Nigeria and you plan to move to a new apartment next year. Please ensure that you engage a professional builder or facility manager to check the structural integrity of the said building.

The LAGOS STATE BUILDING CONTROL AGENCY (LASBCA) is currently doing a good job of demolishing distressed buildings in Lagos state.

Distressed buildings are prone to collapse at any given time.

The lives of you and your loved ones matter.

Seasons Greetings.

#

Photos from AxialStruct's post 25/12/2023

Basement (Underground) Construction
Nnobi, Anambra State.
September 2017.

25/12/2023

MERRY CHRISTMAS ❤️❤️❤️🎅🎅🎅

24/12/2023

Site Works👷

20/12/2023

We keep building 💪

Want your business to be the top-listed Engineering Company in Lekki?
Click here to claim your Sponsored Listing.

Videos (show all)

Slab works
GATEHOUSE CONSTRUCTION📌Concrete Works and Backfilling
GATE HOUSE CONSTRUCTION📌Procurement
GATE HOUSE CONSTRUCTION
👷👷👷#axialstruct #buildingconstructionwork #roadconstruction#structuralengineering #civilengineering
Launching of the Estate.Work in Progress.#axialstruct #buildingconstructionwork #civilengineering #structuralengineering...
🏆🏆🏆
Engineering is Life ❤️❤️🏆
#axialstructprojects #axialstruct #buildingconstruction #civilengineer #HappyNewWeek #PrepareForMore
In this new week do the following;📌 Keep Developing Capacity📌 Prepare for More📌 Develop to Emerge.Happy New Week from Te...
Site Works.

Telephone

Website

Address

Lekki Phase 2
Lekki
2341

Opening Hours

Monday 08:00 - 17:00
Tuesday 08:00 - 17:00
Wednesday 08:00 - 17:00
Thursday 08:00 - 17:00
Friday 08:00 - 17:00
Saturday 09:00 - 13:00

Other Lekki engineering companies (show all)
Serium Homes Serium Homes
B3 Maple Court, Off Kunsela Road, Ikate
Lekki, 105102

Real estate agent, sell, rent and lease spaces

Mabtech construction company Mabtech construction company
Lekki Free Zone
Lekki, CONSTRUCTION

Your choice is our purchase

Modelxcape Africa Modelxcape Africa
East Legon, Ghana
Lekki

We Design and Build State-Of-The-Art Houses for Africa and The International Community.

Rayysol electrical engineering Rayysol electrical engineering
Lagos Island
Lekki

energy installation wizard

Prince Abdulrazak Ahmed Prince Abdulrazak Ahmed
Angwa Ankpa L. G. A
Lekki

Steel fabrication

FineViews Koncepts FineViews Koncepts
Lagos Nigeria.
Lekki

Providing good Architectural design and construction for your comfort.

Rewind Realtor Rewind Realtor
House 22 Road 2 Ikota Villa Estate
Lekki, 23401

At Rewind Realtor, Our Services Include: *Lands/Properties Sales *Lease/Rental

Zenom Tech Zenom Tech
Lekki

ELVTTE-CONCEPT NIGERIA LIMITED ELVTTE-CONCEPT NIGERIA LIMITED
4th Floor, Gold Crest Plaza Beside Mega Chicken, Ikota 1st Gate Bus Stop Lekki, Lagos
Lekki

ECN.,LTD is multi-discipline company offering infrastructure development, co

Tosolar solution venture Tosolar solution venture
Lekki

we install solar Inverters system and security technology⚪💪

Yusuf Frayo Yusuf Frayo
Agungi
Lekki

available for All type of cars