Our Services:

-Construction/Renovation and Interior Fit-out
-Fire Detection and Fire Protection
-CCTV Installation
-ACP and Glassworks
-Complete Set of Plans(Sign and Sealed) for Building Permit Application, Bank Loan and Housing Loan
-Structural and Seismic Analysis, Short Circuit and Voltage Drop Calculation, Septic Tank Analysis, etc.
-Detailed Estimate(Signed and Sealed)
-Technical Specifications(Signed and Sealed)
-Project Planning and Consultancy
-Other engineering related services

For queries please contact
09561791251

Photos from Municipal Government of Rizal, Laguna's post 09/07/2023

Project: Design and Project Management of a 4 Storey Legislative Community Building and Multipurpose Hall in Brgy. Pauli 2 Rizal, Laguna

Once again, it is our great honor to be a part of this projects in our early years.

Our Services:
-Construction/Renovation and Interior Fit-out
-Land Relocation Survey
-Fire Protection and Fire Detection
-Complete Set of Plans(Sign and Sealed) for Building Permit Application, Bank Loan and Housing Loan
-Structural and Seismic Analysis, Short Circuit and Voltage Drop Calculation, Septic Tank Analysis, etc.
-Detailed Estimate(Signed and Sealed)
-Technical Specifications(Signed and Sealed)
-Project Planning and Consultancy
-Other engineering related services
For queries please contact
09561791251

Photos from PrimeGon Construction's post 12/06/2023

A Proposed Two Storey 8 Unit Residential in Brgy. Gulang- Gulang Lucena City, Quezon

Our Services:
-Construction/Renovation and Interior Fit-out
-Complete Set of Plans(Sign and Sealed) for Building Permit Application, Bank Loan and Housing Loan
-Structural and Seismic Analysis, Short Circuit and Voltage Drop Calculation, Septic Tank Analysis, etc.
-Detailed Estimate(Signed and Sealed)
-Technical Specifications(Signed and Sealed)
-Project Planning and Consultancy
-Other engineering related services

For queries please contact
09561791251

Photos from PrimeGon Construction's post 27/05/2023

A Proposed Travel and Tours Office in Waltermart Candelaria,Quezon

Our Services:
-Construction/Renovation and Interior Fit-out
-Complete Set of Plans(Sign and Sealed) for Building Permit Application, Bank Loan and Housing Loan
-Detailed Estimate(Signed and Sealed)
-Technical Specifications(Signed and Sealed)
-Project Planning and Consultancy

For queries please contact
09561791251

12/04/2023

Soon to Rise!!!

Our Three Unit Residential Project in Sariaya,Quezon

Services: Building Permit Package B
-Complete Set of Plans(Sign and Sealed) for Building Permit Application
-Detailed Estimate(Sign and Sealed)
-Technical Specifications
-Application for Construction Loan (Pag-Ibig)

For queries please contact

09561791251

08/04/2023

Reference from the master himself

SPP Document 207

(replacing the 1979 UAP Doc. 207)
1.1 In any building project, there is need to balance the elements of time, quality and cost, which, in many cases, can best be achieved by the Architect performing Design-Build Services.

1.2 The building industry and the architectural profession have devised several methods of project delivery with the ultimate goal of handling projects in the shortest possible time, at the lowest possible cost and at an acceptable quality and performance.

1.3 An Architect with his education, training and expertise qualifies him to take a direct role in the project, from conceptualization to implementation.

1.4 Design-Build Services simplifies and expedites the process of project delivery while providing creative cost-effective solutions.

1.5 The Architect renders professional services in the implementation of his design. In Design-Build Services, he assumes the professional responsibility and civil liability for both the design and the construction of the project.

2. SCOPE OF DESIGN-BUILD SERVICES

2.1 Design-Build Services by Administration

The scope of Design-Build Services by Administration is similar to that of the Architect’s Regular Design Services (reference SPP Document 202):

2.1.1 Project Definition Phase

2.1.2 Schematic Design Phase

2.1.3 Design Development Phase

2.1.4 Contract Document Phase

2.1.5 Construction Phase

When the various phases of design services are completed, the Construction Phase goes beyond periodic inspection and assessment to include the following:

a. Preparation of schedule of work, program and estimates of materials, labor, transportation, equipment and services as reference for the construction.

b. Organization and hiring of construction personnel, designation of duties and remunerations

c. Negotiation and entering into contract with piecework contractors and evaluation of work accomplishments

d. Procurement of materials, plants and equipment, licenses and permits

e. Authorizing and undertaking payments of accounts

f. Keeping records and books of accounts

g. Negotiation with Government and private agencies having jurisdiction over the project, and

h. Management of all other business transactions related to the project construction / implementation.



2.2 Design-Build Services with Guaranteed Maximum Project Construction Cost

2.2.1 This method is essentially the same as Design-Build Services by Administration except that the Architect provides the Owner/ Client a guaranteed maximum project construction cost for the construction of the project.

2.2.2 The Architect gives the Owner/ Client an estimate of the project. If upon completion there is realized savings from the estimated project construction cost; the savings is divided equally between the Owner/ Client and the Architect.

2.2.3 The project construction cost is guaranteed by the Architect not to exceed Ten Percent (10%) of the estimated project construction cost. Should the actual cost exceed the estimated project construction cost plus Ten Percent (10%), the Architect shall be liable for the excess amount but only up to the amount of his administration Fee.

2.2.4 Should there be additional expenditures beyond the guaranteed maximum project construction cost which are due to legitimate change / variation orders (CVOs), extra work orders (EWOs), substantial escalation of prices of the costs of materials or labor as evidenced by data certified by a nationally recognized agency such as the National Economic Development Authority (NEDA), or to other causes not attributable to the fault of the Architect, the additional costs shall be borne by the Owner/ Client.

1. MANNER OF PROVIDING SERVICES

1.1 The Architect may be involved in construction, including that of his own design, by adopting an arrangement different from the general way of bidding out projects to constructors, or from the different modes of Design-Build Services (DBS). Such an arrangement may take the form of any of the following:

1.1.1 The Architect is part of or a member of the entity constructing his design. He works in tandem with or has authorized an entity to construct his design.

1.1.2 The Architect is himself a State-licensed contractor implementing his design (or that of others).

1.2 In adopting any of the above arrangements, or any acceptable variation thereof, the Architect must strictly adhere to the following:

1.2.1 The Architect must retain his separate / distinct professional identity, prerogatives and integrity as an Architect, and is therefore subject to the standards and tenets of the SPP, particularly Document 200, otherwise known as the Code of Ethical Conduct and SPP Document 202.

1.2.2 Whatever mode the Architect adopts in being involved in construction, he must strictly adhere to the tenets of the Architects Credo with the pledge that he “shall disclose whenever required, any business investment or venture that may tend to create a conflict of interest, and ensure that such conflict neither compromises the legitimate interest of the Client nor interfere with his duty to render impartial judgment.”



2. METHOD OF COMPENSATION

2.1 The manner of payment to the Architect follows the progress of construction. The Client directly pays all costs for labor and materials. The Architect does not advance any money for payment of expenditures connected with the work. Generally, a revolving fund is given to the Architect beforehand and is accounted for and subject to periodic auditing by the Client.

2.2 The Owner/ Client shall pay for the cost of all permits, licenses and other incidentals to the work.

2.3 The Architect may appoint, subject to the Owner / Client’s approval, a construction superintendent, purchasing agent, timekeeper and property clerk aside from the usual labor personnel required. Salaries of such persons are paid by the Owner/ Client and not deductible from the Architect’s Fee under this SPP.

2.4 The method of compensation may be modified by using the relevant alternatives detailed in SPP Doc. 202.

Source: PRC WEBSITE
📸: CTTO

Photos from PrimeGon Construction's post 30/03/2023

A Closer look to our Two Storey Residential Project in Alaminos, Laguna

Services:Building Permit Package B
-Complete Set of Plans(Sign and Sealed) for Building Permit Application
-Detailed Estimate(Sign and Sealed)
-Technical Specifications
-Application for Construction Loan (Pag-Ibig)

For queries please contact
09561791251

Photos from PrimeGon Construction's post 20/03/2023

A closer look to our Rest House Project in Tanauan City, Batangas.

Services:Building Permit Package A
-Complete Set of Plans(Sign and Sealed) for Building Permit Application
-Detailed Estimate(Sign and Sealed)
-Technical Specifications

For queries please contact
09561791251

Photos from Civil Engineering Discoveries's post 14/10/2022
Timeline photos 10/04/2022

"Sino ang sisisihin ko? ikaw ba o ang subcon mo? o siya baaaaaaa!!! 🎵🎶🎵"

-PM Escobar

24/03/2022

🙂

Photos from Mr. Contractor's post 20/03/2022
25/02/2022

Though I am the CEO, I value all the team's efforts in producing quality outputs.
And I make sure that our clients know the hard work of all team members to satisfy them and fit their vision of their project.

Timeline photos 14/02/2022
21/10/2021

May kwentong BID EXPERIENCE ka ba? Ibahagi mo sa comment section.

We were praying for this project but we failed to get it. Maaaring may dahilan si God.

Posibleng pinambangga lang ang proposal namin. 😂

“Failure is simply the opportunity to begin again, this time more intelligently." ~ Henry Ford

Timeline photos 09/10/2021

Our services, all signed and sealed:
📌 Technical Specifications
📌 Structural Plans
📌 Architectural Plans
📌 Plumbing/Sanitary Plans/Analysis
📌 Electrical Plans/Analysis
📌 Bill of Materials, Costings
📌 Other Building Permit Requirements
📫 PM us for your inquiries.
email us @ [email protected]
📱 09561791251

NO MORE 25k per square meters for the year 2021

Due to inflation in Materials and Labor Rates, the previously established 25k per sqm (2018-early 2020) has increased to 30k per sqm. By the fourth quarter of 2020, the price had begun to progressively rise. According to Rider Levett Bucknall's Construction Cost Calculator, the price has not returned this year and is gradually increasing, with the lowest rate of 30.1k and a high rate of 63.2k per sqm (as of October 8, 2021).

We regret to inform our clients (present) who have been caught in the middle of the market inflation season that these data will be the new minimal basis for house construction. Also, future clients should be cautious of individuals who claim that the rates haven't changed. Remember that the cheapest price is not necessarily the best option.

As architects, we are trained to design your building around your unique guidelines and, of course, your budget. We are made to adapt to changes and solve issues using our skills to manipulate planning and design, which is why it is such an important step in creating your dream home. It isn't just about adding to your expenses; it's about making the most out of your resources.

References:
https://www.rlb.com/ccc/ -cost-indicator
Architect JM de Jesus (Construction Cost of a House in PH), https://www.facebook.com/ArchitectJMdeJesus/photos/a.110214777160688/419743789541117/
DISCLAIMER: This is only applicable to houses made of CONCRETE, which is common here in the Philippines. The Probable Project Cost always depends on the materials used, the location of the project, labor rates... etc. Which is already stated in the photo. Thank you.

27/09/2021

𝐀𝐧𝐠 𝐩𝐞𝐫 𝐀𝐑𝐄𝐀 𝐨𝐫 𝐒𝐐𝐔𝐀𝐑𝐄 𝐌𝐄𝐓𝐄𝐑 𝐁𝐀𝐒𝐈𝐒 𝐚𝐲 𝐁𝐀𝐒𝐄𝐇𝐀𝐍 𝐋𝐀𝐌𝐀𝐍𝐆 𝐚𝐭 𝐇𝐔𝐖𝐀𝐆 𝐊𝐀𝐘𝐎 𝐏𝐀𝐏𝐀𝐘𝐀𝐆 𝐍𝐀 𝐇𝐈𝐍𝐃𝐈 𝐈𝐓𝐄𝐌𝐈𝐙𝐄𝐃 𝐚𝐧𝐝 𝐐𝐔𝐎𝐓𝐀𝐓𝐈𝐎𝐍.

No More 25k/sqm Standard Finished House

Based on Q1 2021 Market Price

https://www.rlb.com/ccc/ -cost-indicator

Construction Material Price surge up by 50% since Q4 2020 and never returned to the last price increase since 2018.

Consult and deal only with the legitimate construction professionals.

17/09/2021

tulungan po namin kayo😊

Law of Attraction: Magkakabahay din ako! 🏠🙏

Grow with us by jumpstarting your investment journey now! Join us this coming 𝐒𝐞𝐩𝐭𝐞𝐦𝐛𝐞𝐫 𝟐𝟑𝐫𝐝, 𝐓𝐡𝐮𝐫𝐬𝐝𝐚𝐲 𝐚𝐭 𝟓:𝟎𝟎 𝐏𝐌 𝐯𝐢𝐚 𝐅𝐚𝐜𝐞𝐛𝐨𝐨𝐤 𝐋𝐢𝐯𝐞. #𝐈𝐧𝐯𝐞𝐬𝐭𝐏𝐇: 𝐔𝐧𝐝𝐞𝐫𝐬𝐭𝐚𝐧𝐝𝐢𝐧𝐠 𝐏𝐡𝐢𝐥𝐢𝐩𝐩𝐢𝐧𝐞 𝐈𝐧𝐯𝐞𝐬𝐭𝐦𝐞𝐧𝐭𝐬 brings together top-tier industry leaders to share their valuable insights on how to start your journey in the investment landscape.

Are you ready to take the first step in achieving your investment goal?

Register Now: www.tgfiph.com/bdo/

08/09/2021

Just a Sunday inspirational thought. 🥰

Photos from Arch Capitol's post 08/09/2021

Telephone

Website

Opening Hours

Monday 08:00 - 05:00
Tuesday 08:00 - 17:00
Wednesday 08:00 - 17:00
Thursday 08:00 - 17:00
Friday 08:00 - 17:00
Saturday 08:00 - 05:00
Sunday 08:00 - 12:00