Royal Energy

All About Solar Power and Net Metering. To provide cheap solar solution to public

05/04/2024
05/04/2024

Net Metering Files with E-Stamp available at 4500 Rs upto 15KW

Italy University of Camerino Without IELTS | No Application Fee| Italy admission 2024 - YouTube Deeplink by Mysocial 27/12/2023

๐”๐ง๐ข๐ฏ๐ž๐ซ๐ฌ๐ข๐ญ๐ฒ ๐จ๐Ÿ ๐‚๐š๐ฆ๐ž๐ซ๐ข๐ง๐จ ๐ˆ๐ญ๐š๐ฅ๐ฒ ๐Ÿ‡ฎ๐Ÿ‡น

-No IELTS
- No Application Fee
- Bachelor, Master PhD
+Deadline: 15 March 2024

Two scholarships are available at the University! Limited set so apply early and confirm your spot.

๐‘๐ž๐ช๐ฎ๐ข๐ซ๐ž๐ ๐ƒ๐จ๐œ๐ฎ๐ฆ๐ž๐ง๐ญ๐ฌ
Passport Front Page
FA/Fsc Transcript & DMC
Bachelor's Degree & Transcript (For Master's degree)

๐‡๐จ๐ฐ ๐ญ๐จ ๐š๐ฉ๐ฉ๐ฅ๐ฒ?
Visit the link for Details on the online application

Apply Video link: https://to.mysocial.io/s/ee6lBlbpk
Official Website: https://international.unicam.it/

Apply as soon as possible to get an admissions acceptance letter

Italy University of Camerino Without IELTS | No Application Fee| Italy admission 2024 - YouTube Deeplink by Mysocial Explore the exciting opportunity to study in Italy at the University of Camerino for the 2024 admission cycle, without the need for IELTS sc - YouTube Deeplink by Mysocial

Punjab Information Technology Jobs 2023 in Punjab 10/12/2023

*PITB JOBS 2023*

๐Ÿข Government Job
๐ŸŽ“ Bachelor | Master | MS | BS
๐Ÿšฉ Total Positions: 34
โฐ December 24, 2023
๐ŸŒ Pakistan

Follow for More Updates
JobSeed - Job Advertisements hub

Punjab Information Technology Jobs 2023 in Punjab The Punjab Information Technology Board (PITB) in Lahore, Punjab, Pakistan, announced vacancies for various positions as per the advertisement in the

Consultant Jobs 2023 in Badin 22/11/2023

*Indus Hospital, District Headquarter Hospital, JOBS 2023*

๐ŸŽ“ postgraduate degree
๐ŸŒ Total Positions: 1
โฐ 2023-11-23

๐Ÿ‘‰ https://www.jobseed.pk/2023/11/consultant-jobs-2023-in-badin.html

Consultant Jobs 2023 in Badin Consultant jobs at Indus Hospital, District Headquarter Hospital, Badin Services of Consultant are required at Accident & Emergency department.

Institute Of Health Sciences Peshawar Jobs 2023 in Peshawar 20/11/2023

*Health Department KPK JOBS 2023*

๐ŸŽ“ Mphil | PhD
๐ŸŒ Total Positions: 5
โฐ November 25, 2023

๐Ÿ‘‰ https://www.jobseed.pk/2023/11/institute-of-health-sciences-peshawar.html

Institute Of Health Sciences Peshawar Jobs 2023 in Peshawar Institute of Health Sciences (IHS) in Peshawar is seeking applicants for various academic positions, as announced in the Mashriq Newspaper on November

Public Sector Organization New Jobs 2023 in Islamabad 17/11/2023

*Public Sector Organization JOBS 2023*

๐ŸŽ“ Bachelor/ Master
๐ŸŒ Total Positions: 3
โฐ 2023-11-24

Public Sector Organization New Jobs 2023 in Islamabad Public Sector Organization Latest Jobs in Islamabad November 2023 has been announce through Latest advertisement A subsidiary of public sector.

27/10/2023

New! IEEE PES Technical Report (TR113): Simulation methods, models, and analysis techniques to represent the behavior of bulk power system connected inverter-based resources.

Access ๐Ÿ”— : https://bit.ly/3ZTNbuM..
Presently, many utility-scale inverter-based resources (IBRs) are in remote areas of the system where often there is sparse transmission and few synchronous generating resources. This interconnection scenario invariably leads to a low short-circuit current availability at the point of common coupling (PCC) of the IBR. Additionally, most new IBRs are connected to the grid through converter interfaces (e.g., Type 3 and 4 wind generators, photovoltaic solar generators, battery energy storage systems, etc.). Thus, the stability of an increased percentage of inverter-based IBRs in large power systems is an emerging research topic for the reliable operation of the grid. Since IBRs have controls and dynamic behavior that can be quite different from traditional synchronous machines, the mechanisms of instability in low short circuit systems need to be investigated using improved and appropriate mathematical models. This report looks at the availability, applicability, usability, and reliability of present state-of-the-art computer simulation models for the representation of IBRs. Further, the limitations of the above alternative methods are discussed..
PES members have access to all technical reports in the IEEE PES Resource Center, discounted for IEEE members & available for non-members.

A new tidal turbine generates as much power as 12 solar panels 27/10/2023

A new tidal turbine generates as much power as 12 solar panels Solar panels and wind turbines cannot generate power continuously. So, a tidal turbine that does not harm the environment is the need of the hour.

27/10/2023

New! Technical Report (TR115): Flexibility for Integrated Grid Planning with Distributed Energy Resources in the IEEE PES Resource Center๐Ÿ‘‰๐Ÿป https://bit.ly/404Eq17..
To successfully achieve the desired level of electrification and integrate clean energy resources into the grid, utilities must proactively plan and construct urgently necessary grid infrastructure and must achieve concurrence with regulators and stakeholders of the need for investment. Proactive planning must address constraints created by aging infrastructure and the need for additional generation and grid capacity while evolving planning and operations to incorporate and leverage new technologies to their full extent, including distributed energy resources (DER) technologies, Grid Enhancing Technologies (GET), and advanced automation technologies, while also reflecting evolutions in regulatory and public policy measures. There is also an urgent need across various jurisdictions to anticipate electrification load growth and quantify customer adoption of DER and their value geospatially and temporally. Urgent collaboration among the entire industry and customers is critical to driving innovation, adopting proven processes and technologies, and developing a comprehensive grid planning approach that advances affordability, reliability, resilience, safety, and equity while transitioning to a decarbonized grid future. The design of the grid must be adapted to accommodate the increasing pe*******on of DER and electrification effectively and at speed, which means that grid modernization plays a pivotal role in enabling orderly DER integration and facilitating increased electrification. Planning should be conducted in an integrated manner, considering grid assets, large-scale generation, and DER together to enable the delivery of reliable, resilient, safe, and cost-effective electrical energy. This report highlights the importance of grid flexibility, modernization, and integrated planning to achieve advanced emissions targets..
View the official announcement: https://bit.ly/406eP7I
PES members receive free access to all PES technical reports, they are discounted for IEEE members & available for non-members for purchase.

JobSeed 30/08/2023

Pakistan Civil Aviation Authority Jobs 2023

Last date to apply: September 10, 2023

JobSeed JobSeed is a platform that provide advertised jobs from online and news papers at one place.

Research Associate - MUET 17/08/2023

*Mehran University of Engineering & Technology, Jamshoro JOBS 2023*

*๐Ÿ“Œ Pin Points:*

*Post Name:* Research Associate

*Qualifications:* Masters in Engineering /MBA/M.Phil in Math/MS in English

Research Associate - MUET Mehran University of Engineering & Technology, Jamshoro requires [POST NAME], the candidate must have Masters in Engineering.

10/06/2023

Meezan Bank Limited required support engineer ADC for head office karachi, Eligibility is BS (04 years Programme) / MS Degree in Computer Science / Software Engineering or any other related area from an HEC recognized university. And Experience should be 1 to 3 years of relevant experience in ADC projects support or projects implementation.

https://needyjobs999.blogspot.com/2023/06/support-engineer-adc-at-meezan-bank.html

Want your business to be the top-listed Engineering Company in Multan?
Click here to claim your Sponsored Listing.

Telephone

Website

Address

Multan

Other Solar Energy Companies in Multan (show all)
Fahad solar energy solution Fahad solar energy solution
Street No. 1 Tiba Kareemabad
Multan

Solar energy solution

Mega Solar Energy Mega Solar Energy
70-B, Model Town B
Multan, 66000

We are Tier 1 Vendors, Installers, trainers and Developers in the field solar PV renewable and susta

Mux Solar Solutions Mux Solar Solutions
3rd Floor Business City Plaza
Multan, 60700

Mux Solar Solutions 1. Solar Installation 2. Inverters 3. Solar Panels

Enlight Energy Enlight Energy
Ghosia Street, Y-Block Bodla Town, Qasoori Chowk, Chowk Kumharanwala
Multan, 66000

Enlight Energy #Solar Panels

Smart Solutions Pvt-Ltd Smart Solutions Pvt-Ltd
Jan Muhammad Chowk Masoom Shah Road Multan
Multan

Smart Solutions is one of the leading solar solution provider in Pakistan. We deal in both on-grid

Richy Solar Richy Solar
Office No: 27-28, Lower Ground, Business City Plaza, Bosan Road
Multan, 60000

Pakistan's 1st Entrepreneur Solar Systems Provider with Instalment For Residential & Commercial.

SunLight Tec Pvt Ltd SunLight Tec Pvt Ltd
Saeed Center, Kitchery Road
Multan, 61000

Solar power made affordable & simple, for you! ยปSolar energy | CCTV camera | security equipment

Signaring Pakistan Signaring Pakistan
Plot # 15/Commercial, X Block, Alfalah Market, New Multan
Multan, 66000

Signaring Pakistan's Biggest Solar Company 03111786173 Lahore DHA 03111786174 Islamabad Bahria Town

Technoland Solar Energy Solution Technoland Solar Energy Solution
Opposite Tasty Garden Restaurant Bhawalpur Road Bipass Multan
Multan, 60000

Provides solar inverters ,solar panels other accessories & solar installation services.

Unisolar & Engineering Services Unisolar & Engineering Services
Multan, 34030

Solar energy, the smart way to power up your home

Al Hamd Solar Solutions Al Hamd Solar Solutions
Office 2-A Near K&N's, Model Town, Nothern Bypass
Multan

Fast reliable solar services at affordable prices.

ULTRA SOLAR Energy ULTRA SOLAR Energy
Head Muhammed Wala Road, Near Zakria Public School, Basti Nou Road Sardar Chowk Multan
Multan, 60000

We Provide high Efficiency Solar System in , Industrial, Commercial, Agriculture and Domestic Level.