Key & Knob Constructions
Construction of Residential houses, Commercial buildings, Quantity surveying, Pre build estimation, Architecture drawing Structural drawings etc
Slab of 1 kanal Area DHA phase 5
is in progress
&KNOBCONSTRUCTIONS #
#
Slab pouring
Alhamdulilah construction is in progress
&KNOBCONSTRUCTIONS #
#
Alhamdulilah CCTV cameras Installed at DHA phase 5 site
Alhamdulilah First brick ceremony of 1 Kanal residential project
Dha phase 5
#
#
&KNOBCONSTRUCTIONS #
#
Before Finishing
&KNOBCONSTRUCTIONS #
#
Concrete slab pouring of 1 kanal area
Swimming pool Construction is in progress on rooftop of house
Location: Canal View
Ground Floor slab
Area : 1 kanal
completed another commercial project
Main Raiwind road
of KTC
Double Tee concrete structure placing is in progress
Alhamdulilah Project Completed LDA Avenue Phase 1
Alhamdulilah Grey Structure completed
Foundation work is in progress
#
#
&KNOBCONSTRUCTIONS #
#
CCTV view of site
#
.
… #
#
.
: 45000 sqft
&KNOBCONSTRUCTIONS #
#
Alhamdulilah steel fixing work is about to complete
. #
#
.
: 45000 sqft
&KNOBCONSTRUCTIONS #
#
#
#
.
: 45000 sqft
Excavation is in progress
&KNOBCONSTRUCTIONS #
Concrete slab pouring is in progress
Pouring Day In Ramazan
38°C Temp
Slab pouring of basement floor
Location: 111 D AWT Phase
&KNOBCONSTRUCTIONS #
#
2 #
Location: 112 D AWT phase 2
Concrete Raw flooring Of Ground Floor
&KNOBCONSTRUCTIONS #
#
#
LOCATION: 125 D MUHAFIZ TOWN
First floor top slab pouring
MATERIAL: Mughal supreme G60 Deformed steel
DG Khan cement
Chenab Sand
Margalla Crush
Steel Formwork
&KNOBCONSTRUCTIONS #
#
pouring of basement retaining walls is in progress
Alhamdullilah Installation of CCTV cameras at our sites
&KNOBCONSTRUCTIONS