E.D. Swett

E.D. Swett

Since 1936, we’ve led the way in bridge building for the New Hampshire, Massachusetts, and Vermont regions.

Photos from E.D. Swett's post 31/10/2024

October 31, 2024 NHDOT I-93 NB, Stevens Pond and Wellington Road overpass bridges. E.D. Swett family members removing the temporary concrete barriers in preparation for our sub-contractors to begin on Monday the three week process of returning NB traffic back into its original configuration, for this year. Phase 2 will start March 2025. Nice work.

29/10/2024

October 29, 2024 Rte 12 Project, BUR Construction, Claremont. ED Swett Project Superintendent Buzz Abbott, operator Randy Gibson, craftsmen Derek Boynton, Dave Clark, Brandon Steller and Aman Dery constructing the new concrete wall. Excellent work.

Photos from E.D. Swett's post 29/10/2024

October 29, 2024 NHDOT I-93 NB Wellington Road overpass bridge rehabilitation. Project Superintendent Michael Desroches, Foreman Craig Moses, Foreman Lon Collins and ED Swett family members paving base asphalt off of the bridge in preparations to remove the temporary barrier and begin the paving sequence. Nice work

Photos from E.D. Swett's post 24/10/2024

October 24, 2024 NHDOT I-93 NB over Rte 3 ( Exit 9): E.D. Swett family members constructing the temporary widening onto and off of the Rte 3 overpass bridge in preparation for paving and a March 2025 traffic switch.

16/10/2024

October 16, 2024 NHDOT I-93 NB. Our sub-contractor, Moulson North, preparing their foundation formwork for concrete which will eventually support the CCTV system.

Photos from E.D. Swett's post 16/10/2024

October 16, 2020 NHDOT I-93 NB Stevens Pond and Wellington Road Bridges. The E.D. Swett family members placing concrete patches and deck ends. Terrific

Photos from E.D. Swett's post 15/10/2024

October 15, 2024 I-93 NB Manchester. We here at E.D. Swett want to spread the message to all the traveling public passing thru construction sites and work zones, to obey the speed limits and travel lane adjustments while driving in these areas. STAY ALERT. SLOW DOWN. We speak not only for E.D. Swett but for the entire construction industry in NH. These hard working men and women have families to go home to. This particular accident today was 2 seconds from certainly being a casualty.

15/10/2024

October 15, 2024 Memorial Bridge Loon Mountain. Project Foreman Jason Littlefield, operators Mark Bailey and Derek Boynton finishing up the stone rip rap around repaired wings and footing.

Photos from E.D. Swett's post 14/10/2024

October 14, 2024 Memorial Bridge Loon Mountain. Project Foreman Jason Littlefield, operators Mark Bailey and Derek Boynton placing stone rip rap around the repaired wings and footing. Nice work

Photos from E.D. Swett's post 09/10/2024

October 9, 2024 NHDOT I-93 NB Stevens Pond Bridge Manchester. Project Superintendent Mike Desroches, Foreman Craig Moses, Foreman Lon Collins, Foreman Joe Symonds, craftsmen Nate Puluti, Scot Frechette, Ed Coulstring, George Abek, Victor Davis, Aman Dery, Rick Griffin, Nate Pagan, and Dzevad Tokovic placing 50 % of concrete deck patches today. Excellent effort by all these E.D. Swett family members.

Photos from E.D. Swett's post 07/10/2024

October 7, 2024 Memorial Bridge, Loon Mountain. Project Foreman Jason Littlefield, operator Derek Boynton and craftsman Rob Estes getting the project underway by setting in the turbidity curtain, lowering our CAT Mini Excavator under the bridge and placement of the sandbag cofferdam.

Photos from E.D. Swett's post 07/10/2024

October 7, 2024 North Main Street, BUR Project Claremont. Project Superintendent Buzz Abbott, Operator Randy Gibson, craftsmen Dave Clark and Brandon Steller erecting our concrete wall forms for the cast-in-place concrete walls. Excellent work.

05/10/2024

October 4, 2024 Memorial Bridge, Loon Mountain. Mobilize our Komatsu Loader and 50 T Linkbelt RT Crane to begin bridge repairs for Loon Mountain.

Photos from E.D. Swett's post 25/09/2024

September 25, 2024 Tully Brook Road Bridge Replacement Richmond. Another project in the books!! What a terrific final product. ED Swett thanks all of our sub-contractors, the on site engineering team of Hoyle Tanner and Associates (Katie, Josif and Holly), the design engineers of H.L. Turner Group, the residents of Richmond, the Town of Richmond for the opportunity and especially thanks go out to the ED Swett family members, who once again showed their talents. A project well done.

Photos from E.D. Swett's post 25/09/2024

September 25, 2024 Rte 12A City of Claremont. Prime Contractor, BUR Construction, preparing the last of the site for our arrival to began construction of the concrete face wall and cap.

Photos from E.D. Swett's post 25/09/2024

September 25, 2024 NHDOT Rte 202 Peterborough. Final loam/seed/hay areas used by office trailers. Nice work

Photos from E.D. Swett's post 24/09/2024

September 24, 2024 NHDOT I93 NB Stevens Pond Bridge and Wellington Road Bridge rehabilitation Manchester. ED Swett family members continuing moving the needle as Phase 2 is under way.
Excellent effort by these men. Hard work and long hours.

Photos from E.D. Swett's post 23/09/2024

September 20, 2024 NHDOT I-93 Stevens Pond Bridge and Wellington Road Bridge Rehabilitation Manchester. Project Superintendent Mike Desroches, Foreman Jason Bisson, Foreman Craig Moses, Foreman Joe Symonds, Foreman Lon Collins and ED Swett family members completing multiple tasks as the project moves into Phase 2. Excellent effort from all these men.

Photos from E.D. Swett's post 17/09/2024

September 17, 2024 NHDOT I93 NB Stevens Pond and Wellington Road Bridges Manchester. ED Swett family members worked thru the night last night switching traffic into Phase 2 with our sub-contractor, Continental Paving, wasting no time grinding off the existing bridge deck asphalt. Dedication to the max. Excellent work.

12/09/2024

AGC of NH is proud to announce that member E.D. Swett has achieved a zero-incident rate in 2023 and was awarded a National AGC Safety Award (NASA). They also received this award in 2022.

NASA compares an AGC member’s safety record with other AGC members according to the member size and construction type.

Photos from E.D. Swett's post 12/09/2024

September 12, 2024 Tully Brook Road Bridge Replacement Richmond. Project Superintendent Buzz Abbott, Forman Jason Littlefield, operator Randy Gibson and craftsmen Dave Clark and Branden Steller removing the temporary access road and bridge.

Photos from E.D. Swett's post 12/09/2024

September 10, 2024 NHDOT I-93 NB Wellington Road Bridge Rehabilitation. Project Superintendent Michael Desroches, Foreman Craig Moses, Foreman Jason Bisson, Forman Lon Collins and E.D. Swett family members placing the last of the concrete (island) in Phase 1. Our sub-contractor, Nicom Coating, membrane the bridge deck in preparations for paving. Excellent work.

Photos from E.D. Swett's post 05/09/2024

September 5, 2024 Tully Brook Road Bridge Richmond. Project Superintendent Buzz Abbott, Foreman Jason Littlefield, operator Randy Gibson and craftsman Dave Clark preparing to open the new bridge tomorrow and begin removing the temporary road and bridge. Nice work.

Photos from E.D. Swett's post 05/09/2024

September 4, 2024 NHDOT I-93 NB Wellington Road and Stevens Pond Bridges Manchester. Project Superintendent Mike Desroches, Foreman Lon Collins, Foreman Jason Bisson, Foreman Craig Moses and E.D. Swett family members pushing the project to the end of Phase 1. Excellent work.

Telephone