Our final inspection passed two weeks ago!
Super thankful to God for this entire process being smooth. Even though this project ended up taking almost a full year as opposed to the estimated 6 months I have no complaints because it is just such an amazing outcome!
The kitchen turned out much larger than expected!
Kitchen looking super fresh! Countertop and appliances coming soon 🔜
The guest bathroom is coming together nicely. It has a large shower head and a portable wash head as well!
My favorite part is the seat to sit on for detailed cleaning 🧼!
The two bedrooms and the master bathroom are almost complete in terms of finishing touches (flooring, outlets, lighting, trims). Looking really nice!
Sewage and water lines are installed and ready to go
The bathrooms are coming together slowly but surely. I love the area where you can put the shampoos, body wash, etc.
Not shown in the picture of the guest bathroom is a place where you can sit to scrub your feet.
The details of the bathroom were very time consuming! Definitely did not account for such effort but totally understandable.
Sneak peak of the stucco. One side is finished so far.
We went with a beige color because it goes very well with the black trim of the windows!
Bathrooms are under way.
The master bedroom will have a tub and the guest bedroom will have a standup shower.
Brown coat is on! Next two days will be letting dry and third and fourth day we will water it to let it become more durable.
Sheetrock is complete in the ceiling and is now being installed all around the home (bedrooms, bathrooms).
The purple colored sheetrock in the bathroom is moisture resistant hence it is used in the bathrooms. They are a bit heavier at 102 lbs a sheet compared to 82 lbs a sheet.
Insulation in the ceiling is complete! Sheetrock for the ceiling coming up next.
We had an issue with our pre-stucco paper. Inspector wanted two layers even though our felt type II was twice the thickness of grade D. So now we have two ply jumbo tex. Fingers crossed on the upcoming inspection!
A rather small update but very exciting one:
We have the shower valves installed - master bathroom will have a tub hence you see the faucet at the bottom. Guest bathroom will have a shower stall that has both a shower head and a shower handheld rinser. Looking forward to the installation of the matte black utilities.
Right now we are working on testing the plumbing to make sure there are no leaks. For example, to test where a gas leak is we put soapy water at the joints of the pipes to see if bubbles are blown. And for water we fill water from the roof and ensure the water is level across all pipes. Gas PSI needs to be 15 and water PSI needs to be 60.
Chicken wiring is complete!
Now we are working on the rough plumbing: gas and out water piping inside is complete, in water is in progress.
Rough electrical almost complete as well, and the fixtures for the recessed lighting is in
Starting to put up the stucco netting around the home. Using 17 gauge for extra durability.
Roofing is quite a satisfying process.
We purchased 38 packs of tile to be delivered by a mini-crane truck to the main home and then walked over by “bridge” to the ADU.
5 of 6 windows installed and black paper in progress! I gotta say I love the black trim on the windows.
Late post - but trusses and framing on the outside all complete! Roof nail and sheer nail inspections passed 🎊
Interior architecture and walls are complete.
Starting on putting up the truss!
Almost all boarded up on the outside.
Framing for the walls on the inside are coming up too!
More progress on the framing!
1. On left from front to back are the living room, guest bedroom, and master bedroom windows. The shed blocking the master bedroom window will be removed.
2. On the right from front to back are the guest bathroom window and master bathroom window.
The side still not built out will be have the kitchen window which goes above the sink.
Now we are starting to work on the framing.
Those are 9 footers 2 by 6’s.
It’s quite an effort to build out one side and to lift it up!
Insulation and underfloor DWV completed. Ready for inspection this coming Monday!
We are now working on the subflooring!
Late post from last week but the concrete has curated. No cracks, perfect condition! Now moving on to prep for the sub flooring.
The concrete is poured!
Pictures show the pouring in progress at about 40% completion.
Now just waiting for the concrete to dry and forms will be removed.
Forms are almost complete! Almost ready for pouring concrete. 👍🏽
In the process of making 96 Rebar triangles for perimeter of the foundation.
Rebar squares (10) for the bracket joists are completed - two rows of 5 evenly spaced throughout the foundation.
Digging is almost complete for the 748sq ft ADU. It really doesn’t look like much but hopefully it will look much more spacious after it’s built.
Next up will be rebar and getting the foundation prepped!
Click here to claim your Sponsored Listing.
Videos (show all)
Category
Website
Address
Napa, CA
94558
Napa, 94558
My focus is now strictly pressure washing,for now only weekends.Thank You
NAPA
Napa, 94558
We are a company specialized in providing high quality interior and exterior painting services, as well as cabinet refinishing and repainting and the use of stains to protect and e...
Napa Valley Corporate Drive
Napa, 94558
Specialized in industrial strength concrete coatings for residential and commercial clients
2330 Lakepark Drive
Napa, 94558
34 years of painting experience. Interior exterior residential commercial.
Napa, 94558
Fine Custom Woodworking for Napa Valley's Finest Custom Homes and Commercial Properties
257 Walnut St, Ste F
Napa, 94559
We are an EPA Lead Certified Company specializing in: Commercial & Residential Interior & Exterior Waterproof Coating Lead Stabilization Epoxy Coating
3231 California Boulevard
Napa, 94558
We are a full service kitchen and bath design and retail showroom www.designshowcasenapa.com
1518 Yajome Street
Napa, 94558
JS Design + Build is an established firm offering in-house design, material selection, plans and con