Our People, Our Strength
Amanda Caso
MEP Engineer
Years with Turner: 5
, B.S., Mechanical Engineering
Turner provided construction management services for the interior fit-out of JetBlue’s new corporate headquarters 27-01 Queens Plaza North in Long Island City, Queens.
The scope of work included the complete fit-out of three floors, totaling 200,000 sq. ft. as well as 30,000 sq. ft. of roof dunnage and equipment installation. The building was originally built in 1911 with an infill building added in 2003, creating two different structural systems. Turner worked around the two existing structural systems to ensure the cohesive feel of JetBlue’s three interconnecting floors.
.newyork
Success is best when it’s shared.
As Safety Week 2022 winds down, we are reaffirming our commitment to Building L.I.F.E. (Living Injury Free Every day)
Throughout the week, jobsites facilitated discussions that highlight how behavioral health and well-being is so important in keeping ourselves, each other, and our jobsites safe. Thank you to all those who actively participated - today and everyday.
Jonathan Del Fierro
Senior Estimator
Years with Turner: 22
, B.S., Architecture
| The Hearst Corporation Lobby
Turner provided construction management services for this 46-story glass and steel, 858,000 sq. ft. commercial office building for Hearst Corporation. The building was built within and above the original six-story Hearst office building, completed in 1928. The existing 1928 Landmark façade was restored and integrated into the tower, designed by Foster + Partners.
The structural frame, standing 598-feet tall, is enclosed with a panelized glass curtain wall system with stainless steel diagrid cladding. The triangulated steel frame uses 21% less steel than a traditionally framed building, saving 2,000 tons of steel. Hearst Tower is the first commercial building in the United States to receive the Green Building tax credit, and is also registered as a New York State Energy Research and Development Authority (NYSERDA). The project achieved the US Green Building Council’s Leadership in Energy and Environmental Design LEED Gold Designation.
Individually, we are one drop. Together, we are an ocean.
Thank you to our entire workforce for another week of hard work, construction never quits! If you recognize someone, tag them and thank them too!
| Brooklyn Navy Yard Development Corporation, STEAM Center
Located inside Building 77 at the Navy Yard, Turner completed the construction of the STEAM Center, a 38,700 sq. ft. hub for high-quality Career and Technical Education. Designed by .newyork, the center features computer rooms, learning laboratories, a kitchen, and full production studio. The 6-month project was completed on behalf of the
Working alongisde Brooklyn Navy Yard Development Corporation (BNYDC)'s consultants, the team carefully planned the structural upgrades to safeguard the building’s integrity prior to completing the demolition of the 6,000 sq. ft. slab on the 4th floor. The team’s pre-planning efforts extended to the fit-out of the kitchen. Due to limited ceiling height, the coordination and phasing of equipment installation was vital to ensuring the project remained on schedule.newyork
Every accomplishment starts with the decision to try.
Happy Earth Day!🌎
On behalf of Empire State Development, a Lendlease / Turner joint venture with tvsdesign provided design-build services for the expansion of the Jacob K. Javits Convention Center. The $1.5 billion project will generate millions of dollars in new economic activity for New York City, while serving as a model of environmental efficiency and sustainability.
The 1.2 million square-foot expansion includes several innovative concepts to push the boundaries of sustainability and create a path for future initiatives. Since 2014, the Javits Center has reduced the building’s energy consumption by 26%, created a rooftop wildlife habitat and installed energy-efficient equipment throughout the structure on Manhattan’s West Side. The innovative design has enabled the expansion to achieve LEED Gold certification from the U.S. Green Building Council.
Completed in 1957, the scope of work included the construction of a massive headquarters building for the Connecticut General Life Insurance Company.
Designed by SOM, the building’s programming takes uniquely horizontal ex*****on, and feature landscaped gardens, new roadways and pedestrian walkways.
Kevin Farry
Superintendent
Years with Turner: 14
, B.A., Environmental Sciencetech, M.S., Civil Engineering
,
On behalf of Mount Sinai Medical Center, Turner completed the first phase of a multifaceted capital improvement program at the Klingenstein Clinical Center (KCC), located at 1450 Madison Avenue. The scope of work included the build-out of a 10,000 sq. ft. cardiac office suite on the 7th floor, as well as the construction of a 9,000 sq. ft. mechanical room, located on the 10th floor.
The project’s second phase, required a complete gut and fit of the 6th floor. Following that was the construction of 10 private cardiac care units, two isolation rooms, and renovations to the existing elevator lobby.
📷: © Halkin Mason Photography
Courtesy is the true characteristic of a good mind.
Have a safe weekend, New York!
Thank you to our 5,000 laborers for continuing to Live Injury Free Every Day.
Amy Molloy
Community & Citizenship Program Senior Specialist
Years with Turner: 12
, B.S., Marketing
| , The Science Building
The 365,000 sq. ft. 18-story Science Building features two amenity floors; two specialized vivarium floors, and thirteen office, laboratory and support floors. While still in the design phase Hurricane Sandy deluged the eastside campus with 15 million gallons of water. As a result, NYU mandated the team harden the building. The team met this challenge and delivered an award-winning project.
The exterior of the building was fortified with flood walls and automated barriers at street level entryways. For additional resiliency, MEP systems were raised above the DFE and utilities from the campus’ cogeneration facility were fed across the roofs of adjacent buildings. To minimize disruption to the active campus the team prefabricated key MEP components that allowed them to successfully complete the infrastructure tie-ins without impeding NYU’s operations.
Happy Friday, New York!
Shout out to our as they finish the week strong! If you recognize someone you know, tag and thank them too!
Golf Outings c. 1940's
Abby Davidson
Engineer
Years with Turner: 6
, B.S., Civil Engineering
Calling all High School Students!
Interested in robotics and AI? Then let’s talk! On April 6, 2022 - Join our webinar to learn how we're using the latest technology to change the game in construction.
Register today at the link in our bio.
The most effective way to do is to do it.
All smiles for Friday!
Have a great weekend New York, and celebrate each day with a simple act of kindness.
Throwing it 🔙 to 1915
Located at 60 Broadway in the Williamsburg section of Brooklyn, Turner New York built the Gretsch Musical Instrument Factory in 1916 for The Gretsch Company, a producer of percussion instruments and guitars.
The 7-story reinforced concrete structure was erected on a 72’ by 125’ size lot and was designed by architect Benjamin Finkensieper. In 2003, the building was converted into a luxury condominium, aptly known as “The Gretsch”.
Katie Stackpole
MEP Engineer
Years with Turner: 8
, B.E., Mechanical Engineering
Tomorrow is the day!
Register today for the Turner Panel Series, where our industry leaders will share their insight on the current state of the industry.
Visit the link in our bio to register.
Leaders are ordinary persons with extraordinary determination.
Smile - it's Friday!
Thank you to all of the essential workers on our jobsites that are continuing to build NYC. Have a safe weekend!
, c. 1966 | United Nations Plaza
Designed by Harrison, Abramovitz & Harris, 860/870 UN Plaza (also known as The UN Plaza) was completed by Turner Construction Company in collaboration with H.R.H Construction in 1966.
The buildings, each totaling 32-stories were constructed atop a shared 300,000 sq. ft. 6-story podium officially known as 866 United Nations Plaza. The commercial podium is home to the highest concentration (more than 30) of foreign consulates and permanent UN Missions.
The residential towers offer expansive 360 degree views of Manhattan and boast tenant amenities such as a sundecks, a fitness center, parking garage and storage facilities.
Click here to claim your Sponsored Listing.
Videos (show all)
Category
Contact the business
Telephone
Address
New York, NY
10014
Opening Hours
Monday | 9am - 5pm |
Tuesday | 9am - 5pm |
Wednesday | 9am - 5pm |
Thursday | 9am - 5pm |
Friday | 9am - 5pm |
2 W 19th Street
New York, 10011
Call for free estimate - 917-674-6336. Family own construction company with over 20 years of experience. Our portfolio contain hundreds of finished projects - apartments, bathrooms...
New York, 11104
EZ Renovation is licensed and fully insured company with an experienced, creative and ambitious crew
132-16 Cross Bay Boulevard
New York, 11417
Visit our website: www.kpcontractingnyc.comb
479 Van Brunt Street # 9C
New York, 11231
Serving Manhattan and the Tri-State area since 1985! Now serving the Tampa - Orlando areas Licens
10-05 35th Avenue
New York, 11106
The Original Core Drilling & Saw Cutting Specialists since 1967.
2534 36th Street
New York, 11103
We specialize in custom small scale home improvement work. We are located in Astoria, Queens.
New York
we do all type of Buildings works. ( Civil & Interiors ) a, New Constructions b, old Building & offi
2790 Sexton Place # 2
New York, 10469
Best sidewalk repair contractor offers one stop for commercial and residential concrete repair and r