Gold Shield 2 Construction

Gold Shield 2 Construction

New Construction, Remodeling, Roofing, Siding, Kitchens, and Bathrooms

Photos from Gold Shield 2 Construction's post 17/10/2021

From the ground up took us four days to complete from start to finish. Just in time for winter, let us know what project you need completed before the snow flys!

Photos from Gold Shield 2 Construction's post 27/06/2021

Rainy day project done on June 22th with all new railings out on Deering Lake. No job to big or too small, don’t hesitate to call for your next project!

Photos from Gold Shield 2 Construction's post 27/06/2021

Started a 29X32 garage on June 21st and finished within 4 days. Day one the walls were completely up, day 2 the trusses went up, day three the roof was done and partially sided, day four finished up siding, doors, and windows.

Photos from Gold Shield 2 Construction's post 19/06/2021

Out with the old in with the new. Took a open floor plan camp and turned it into a three bedroom camp. Complete gut turned into something more efficient with three bedrooms a full bath and a complete wash room.

Photos from Gold Shield 2 Construction's post 08/05/2021

Stripped siding, replaced windows and doors, fixed rot, removed side deck and rebuilt with roof. Complete new face lift!

Photos from Gold Shield 2 Construction's post 23/10/2020

Completed new construction! Exterior is tied up with new vinyl siding, roof, windows, and garage door.

Photos from Gold Shield 2 Construction's post 01/10/2020

Quick weekend project out at the lake!

Photos from Gold Shield 2 Construction's post 01/10/2020

Brand new construction done for this family. More to come as we finish this up before winter!

Photos from Gold Shield 2 Construction's post 10/09/2020

Installed trusses, plywood, and roofed this garage in Hodgdon.

Photos from Gold Shield 2 Construction's post 27/08/2020

New addition from start to finish. Structure up with cathedral ceilings, new siding, new metal roof. Completed within two weeks!

Photos from Gold Shield 2 Construction's post 23/07/2020

Finished product! Added addition, new roof, new siding! From start to finish!

Turned it into a new dining room with Sheetrock, trim and new flooring.

Photos from Gold Shield 2 Construction's post 19/07/2020

Progress.. almost complete!

Photos from Gold Shield 2 Construction's post 22/06/2020

Siding will be finished up this week along with the inside of the addition, just were waiting on the door and window for final product

Photos from Gold Shield 2 Construction's post 22/06/2020

800 sq ft added deck on Amish camp

30/05/2020
Photos from Gold Shield 2 Construction's post 21/05/2020

Another project. Added addition to front entrance and stripped and re roofed the whole house. Siding next!

Photos from Gold Shield 2 Construction's post 19/05/2020

Roof is off and opened up to a second story loft

Photos from Gold Shield 2 Construction's post 19/05/2020

Demo lake house project

19/05/2020

Here for all your construction needs ranging from new construction, basic remodels, roofs, siding, bathrooms and kitchens.

Will be posting some of my latest projects.

Telephone

Website