Last month we worked on clearing this acreage there was a house, barn, silo, multiple building pads, bins, numerous junk piles throughout the trees other then dealing with more rain days just on this project then we have had in the last 3 years it turned out great and was done in time to get planted.
If you have land that needs to be cleaned up give us a call 605 999 3354
Earlier this week we cleaned up a smaller shelter belt by clearing away the debris the owner now eliminated an eye sore and can fully utilize this area of his bin site
If you have a similar project and need a quote you can contact Wade Stahl at 605 999 3354
Finally got decent before and after photos on a project.
Did this earlier this spring just in time for the customer to be able to plant beans. Took about 4 acres of old farm building foundations junk and trees and turned it into farmable acres and a pile of clay. If you have a similar project and would like a quote give me a call 605 999 3354
Made a pile of sticks this last week
Changed it up this week doing some septic work... they were having issues with their drain field being saturated so we added a couple runs
Made a couple bin burritos this morning
Taking advantage of the warmer weather to get a early start to the year just getting moved to a tree removal project today.
If you have a clean up project in a field you want to get done before planting let me know 605 999 3354
Now able to provide scraper work guided by trimble if you need help maintaining your ditches or any other type of project call 605 999 3354 for a quote
Raised and added a culvert to this dam to keep it from washing out again
Was able to clean out a stock dam for a customer today his cattle were getting stuck in the mud was able to remove plenty of slop and reshape the edges... did have a splatter or two throughout the day
Finished up the dam last week was able to cover the clay cut back with black dirt seed it and be good as new for next year
Been working on fixing a dam that blew out a couple years ago able to use clay from a side hill in the pasture to cut from and fill the hole with using a pan
Finished up burying the barn and cleaning up the shelter belt
Project I have been working on this week. Tore a hog barn down buried the foundation and going to clean up a shelterbelt