Got a call to come and fix a failing retaining wall
First 2 pictures are of the wall someone els did.
We had to take the whole thing apart and dig it out prep the base and start laying blocks.
We also installed a drain
It’s coming together
Gave this driveway a big upgrade.
Demoed all the old sidewalk and concrete
Removed all the bushes and trees removed a few stumps.
Prepped and poured new sidewalk and driveway
That was not so fun cutting this hole in the basement wall 4ft opening
Demo this little concrete wall and digging out and cut a bigger hole in the wall for a bigger window
Did some prep and pour for some deck footing pads
Dug up a sewer line to install some clean outs so they can get the pipe jetted out and keep it from backing up
Exploring to find a sewer line so we can install some clean outs on the sewer main
Finished up this retaining wall
Finished up the front entry for this driveway doing block columns and metal fence between and then we did some asphalt
Did some asphalt demo, prep and we will patch back Friday
One of the cool projects we are working on currently giving this driveway entrance some upgrades
Got waterproofing on the foundation walls. Installed the footing drains and gutter drains around foundation with rock and then backfilled and cleaned up the jobsite.
Stripped all the walls and cleaned up to get ready for waterproofing, and we are set to install footing drains and gutter drains and backfill tomorrow
Cleaned up this old logging haul road into a fresh driveway for a future Air B&B coming soon.
Demoed out the old wood retaining wall. Excavated out and installed a new concrete block wall.
Some stump removal this njce Saturday morning
New job site clearing/ stump removal and full site prep for a new house
Installed the last posts spread out some more sand and top soil and grass seed to finish it off now that the barn got moved into this horse pasture area. Install the gate tomorrow. And we are done.
Nice sidewalk and patio pour before the long weekend!
It is coming along. Finish top soil and gravel walk way tomorrow.
Working on a horse paddock, arena area.
Scratched out and graded out the ground and then put down fabric and had 75 yards of sand hauled installed posts for fencing this area off and a gate and then I will spread out the sand to finish it off.
Repaired and installed some new drains to help from this customers basement from flooding. Redoing the drain outlet that ran into the street catch basin. Had to replace a sidewalk panel also
New concrete patio dig out and prep
Foundation is all backfilled and sub graded. Next we will prep and pour the garage floor. And wait for the house to be framed and then come back and do some more work
Built some storage bunkers
We backfilled around the foundation and did some rough grading, got the garage sled prepped and ready to form and pour, prepped the new driveway!
Removed a few stumps and hauled away.
This jobs starting to take shape.
Get in touch with us for your Excavation, concrete work.
Poured some concrete today on one of our new construction projects. Poured stem walls, deck footings and sono tubes. Will strip forms and start working on backfill and footings drains later this week.