Budds Fabrication
Welder/fabricator
Service, repair, and custom fabrication. Fully insured. Specializing in marine fabrication, heavy equipment, and mobile repair.
Equipment service and hydraulic repairs also available
Dual pivot point gang way bracket retro fitted to a “rehomed” gangway, nylon rollers on the bottom and all marine aluminum construction
Had some help banging out John Deere 710 back hoe lower ear on the bucket for Salem Beverly Water Board. Also sewed up a cracked bucket hammer it to fit paint it to match
.inc sharp plate on John Deere skid bucket, fixing crack on another skid bucket and scuttle door repair on truck axle and a Rotzler winch reseal and brake shaft rebuild
Aluminum ladder added for more roof support and hinged tuna tower
Aluminum Dump gate repair and new roller stand and fish tray on the legacy
Tailgate ✅
Old worm gear steering conversion to new dual ram system supported welded and hydros hooked up. The boys outbound for the first trip after shipyard
Full day in Chelmsford today for new customer Environmental pools. Edge shrouds and sharq plating on their ledge bucket and some work on their main skid steer bucket
Turning a cardboard template to a coupler plate to attach to mower for land clearing. Off to Environmental Pools tomorrow am to start on maintaining all their machines buckets to gear up for the spring.
Flatbed built few years ago, one of my first projects and my favorites. Message for a quote on a steel or aluminum bed and give ur truck a new life.
Some shark plate, torn buckets and sander rewire last week
Welded some shanks, added wear plates to Craig digging bucket and some stainless tig for a anchor shoot and rotzler winch rehab and outfitted with all stainless steel hydro fittings last week
Big thanks to stevo and for getting the utility on the new ride welder and torches going in it this week
Gouged and replaced shank on this 3 foot bucket today ran some flux core out of my spool gun and got to try out my new air co torch
Emergency repair yesterday, davit went thru the rail of the boat. Tig welded a new mounting fl**ge for the rail and revamped the hinges from the roof to the davit.
Handrails at apartment building threw me for a loop but they are finally in
Added a few more teeth and gussets to thumb on his Case mini excavator today. On to some hand railings and turning some wrenches for the rest of the week
Mechanical thumb being welded on this pc120 today
Last weeks project, few hiccups along the way of cutting the stern out of this lobster boat and building the aluminum extension to fit the boat. ready for the sheddars now, happy with how it came out