Five Quarter Construction
Five Quarter Construction specializes in remodeling homes with a focus on high-level craftsmanship,
Extremely pleased with the pass through we added at the Dempsey Rd project.
A clean and classic shower with twist at our Dempsey rd project
I really love the way this solid cherry vanity turned out for our Dempsey Rd project.
It was nice to be working outside today before it's too cold up here.
Our Steinies Road project is looking good with plumbing fixtures installed.
I'm loving the way the finishes are coming out on or Steinies Road project. The Symetro Hex tile was great to work with.
The tile is starting to go up on our Steinies Rd project.
We are working on a small deck job today when the the homeowner comes over to me and asks if we want to use his dump truck. I absolutely love this thing!
The vanity is looking good in our Schluter Road project
I always love when we get to work with millwork. It looks great after the first coat
Next step grout
The tile is coming together nicely on our Schluter Road project
The shower wall is coming together nicely on our Schluter Road Project
Taking that wall down really opens up the space and let's you enjoy the view. Next week we'll get the walls painted and the tile replaced then the tub can go in.
Getting those little finishing touches up really brings the project together.
This flooring job turned out very nice. You'd never know that floor in the kitchen was installed a few years after the rest.
We got half of the tile and backer board removed. It was a bit of slog but we are getting through it. The backer board was screwed and glued to the subfloor!
Site prep is incredibly important
Goodbye to the not so trusty old Tundra and hello to Transit. Let the custom shelving begin.
All the wood work is done and I think it turned out great! Now we just need to stain everything. @ Monroe, Wisconsin
I really love the way these railings turned out. They do a great job drawing your eye down the deck and out to the full length stairs @ Monroe, Wisconsin
Deck boards are going down
Concrete is poured and new railing posts are installed with DTT2Z. Don't skimp on hardware you only get one chance to get it right @ Monroe, Wisconsin
The old post had a bit too much wobble for my liking. So cleared the dirt away from them to find they were rotten and rusted. So we replaced the 4x4's with 6x6's with half laps and DTTs holding up the beam. The second picture is of the old hardware. They both started the same. Don't skimp on your hardware @ Monroe, Wisconsin
Digging some new footings for the new stairs
All stripped down. This all started because the stairs in the third picture were sinking into the ground. They ended up only being held on by 2 screws and a lot of luck. Now its time to reinforce the frame and it connection to the building
Excited for this deck remodel.