Kahler Construction
Residential construction
Some before, progress, and after images of a local church residing job we finished up today.
Performed some temporary repairs on a church steeple today.
Made a nice cap for it to keep it dry for a while until actually repair work can be done on the entire steeple.
Overhead doors finally arrive so we finished up this garage build.
26x30 2 car garage, attached to an existing breezeway on the house.
Ready for siding to start being installed.
Started working on a local church last week. Doing new siding. Found some rot that needed to be addressed before moving forward.
Framed up a 30 X 26 garage this week for a customer.
Finished up this addition we have been working on the last month and a half today.
Homeowner will be doing the flooring and finishing the electrical work up.
Finished up this bathroom remodel last week.
Customer is just waiting for the mirror to arrive.
Past 2 weeks this has been our current project.
Removal of a deck to make room for an addition with a nice view of the Hoosic river.
Stay tuned for further updates and the finished product.
The latest project, a laundry room remodel.
Customer wanted to stack their washer dryer units and remove a closet to open up this mud room.
Custom built cabinets to match others in the house along with a slide out folding station.
No shower…no problem.
New shower was installed for an “In-Law” area of the house.
Staircase update. Carpet was removed and railings were able to be refinished.
New treads finshed to match flooring
This customer wanted to add more storage space to their kitchen that was out of way of everything. Some research found that there is really nothing on the market that was capable of doing what they were looking for. But that didn’t stop us from coming up with a plan to give them exactly what they wanted.
Before and after pictures of the latest project. Bathroom remodel. Removed the older “coverup” tub and surround, and brought this bathroom into the modern age with matte black fixtures and clean white everywhere else, with a pop of color on the vanity and custom radiator cover.
Everything was replaced minus the old trim that was reused and the floor left in place since it was done not too long ago.
New Laminate floor install for a bedroom.
Before, after and some progress pictures of a master bathroom remodel.
Just waiting for shower door and a couple other items ro arrive to finish.
Progress pictures of a screen room transformed into a “3 season” room.
Complete with new sliding windows, self storage screen doors, and added insulation in walls and ceiling.
(Interior painting to be completed at a later time)