HwT Constructs
Fully insured. Carpentry frame-Finish, roofing& seamless gutters. Concrete slabs.
Some coil stock and soffit repair. From storm damage we fixed today. Glad to help.
90’ of 5” musket brown K Gutters we hung for a customer.
Finished up this trim job a week ago, 20 windows trimmed out.
Another quick job finished up. Some blocking and trim for the garage door. Also cut in two roof boots for a roof we did awhile ago.
I was told I only have to do it again in 20 years😂🤷♂️.
The start of this job, I’ve always hated 12 pitch roofs😂🤷♂️. Can’t be scared of heights up here.
Another roof job for the books. Thank you to all involved for the help.
The start of trimming out 20 windows. Removing the old trim, cutting back the siding, insulating, resealing and install new trim. Along with some painting.
Rebuilt this door jam, and trim. To wrap up this barn. Till spring. If your doors fine but the. Jamb&casing is rotten. Let us know.
26 square roof we finished this past weekend. Glad to apart of this project.
Hardie board replacement, for a good customer. Brand new install or repair work. We can do it!
Carpenter ants& rot made the bottom sill non exist. Little ingenuity goes a long way. The black trim along the bottom. Ready makes this barn pop
Been slacking on the updates. Due to improper framing this barn roof. Was sagging and way out of wack. Wasn’t easy getting it all straightened out. With the beam In place it’ll eliminate the sheer factor. With the way it was originally framed.
Rebuilt some barn doors. And installed some new trim around this barn. What a difference.
Barn we patched up today. Like it never happened🔥
Frost is no joke. It got to this barn. But we got it all squeezed back together and we’ll put some new footings in. Stay tuned.
Small emergency job for a lady, the roof had been stripped and dried in. Her roofer bailed. So before 2 inches of rain. We got the job done. Not a big fan of 3 tab shingles. It works tho.
Replaced 20’ of rotten fascia & old gutter. In Rockland today. Looks 100 times better.
Other than being short a bundle of cap. This job is 99% wrapped up. Roughly 24 square.
Coil stock & soffit repair. Along with 70’ of new gutters.
130’ of new 5” K gutters we installed this summer.