Four Seasons General Construction
All Phases of construction: demo old construction, new build, windows, doors, kitchen, bathroom, drywall, floors, roofs, electrical, plumbing. -Larry&Al
Almost done!
Beach house is coming along. Should be done soon.
It is all coming together.
Busy few weeks in Aptos. The waves destroyed the first floor during our past storms and since we have to remodel the downstairs we are giving most of the house some love. Every house on this street is being repaired due to the storms.
New iron and wood gate.
Helping a customer/friend board up his home and get the sand out of their home. The waves took the front door right off the hinges
Mountain View ADU almost completed. Finishing up tile today and then putting everything back together.
Always great to work with Cagatay
Lots of ideas by and a lot of work to make that vision come alive.
Building a one bedroom, one bathroom ADU
Remodeling a 6 bedroom, 4 bathroom home. They are six time repeat customers.
Added on to the wine cellar that we built a few years back.
Brick was removed and replaced with a fireplace insert, Sheetrock and granite. Will also be adding a mantel.
Mountain View ADU being built. We poured the cement today and will start framing tomorrow.
Turning a garage into a home office. Adding a sliding door, recessed lighting, more plugs, flooring, baseboard, insulation, sheet rock, texture, paint and a window.
Siding repair, scrape, prime and paint
Have to cut down the bamboo to get to my next project. Three dump loads so far.
Lined a carport, power washed two houses and painted two houses. Next week we hopefully finish a master bathroom if all the material arrives, install power for two new electrical car chargers and we build an ADU.
Power washed, scraped and painted this home in Santa Clara. We are also finishing up a master bath remodel and our double bathroom remodel in Los Gatos is just waiting for a cabinet maker to make them cabinets so we can do our part in their kitchen remodel.
Master bathroom demolished, water lines moves around for walk in shower, new vanity on other side of room and toilet relocated as well. Cabinet went in today and tile is being installed.
Bathroom #2 of the back to back bathroom remodel, next is kitchen and fireplace. This was suppose to be just a quick one bathroom remodel.
Two back to back bathroom remodels. Finished one and tore out the second. Next is a kitchen and living room remodel. Owner still living in home.
Garage and side of house makeover.
Garage remodel, window replacement, stucco removal and replacement, pantry makeover
Atherton project almost completed.
Powder bathroom done, kitchen island done, back yard steps done after tree was removed, still waiting for tile for second powder bath and we will be on to the next assignment in Santa Clara. This assignment was in Atherton.
New fence installed, room painted, floor installed..pantry, plugs and we are done.
Creating a powder bathroom out of a pantry, power wash the exterior, make and paint new island, paint interior, install, sand and stain new hardwood floor
Plumbing, electrical, A/C, heat, sewer, windows, French doors, attic stairs, sub panel, sheet rock, tape and texture. New floors are coming soon.
Interior remodel, exterior touch up and demolish art studio to build an ADU/in-laws quarters.