Four Seasons General Construction

Four Seasons General Construction

All Phases of construction: demo old construction, new build, windows, doors, kitchen, bathroom, drywall, floors, roofs, electrical, plumbing. -Larry&Al

Photos from Four Seasons General Construction's post 09/01/2024

Almost done!

Photos from Four Seasons General Construction's post 07/11/2023

Beach house is coming along. Should be done soon.

Photos from Four Seasons General Construction's post 21/09/2023

It is all coming together.

Photos from Four Seasons General Construction's post 23/04/2023

Busy few weeks in Aptos. The waves destroyed the first floor during our past storms and since we have to remodel the downstairs we are giving most of the house some love. Every house on this street is being repaired due to the storms.

Photos from Four Seasons General Construction's post 06/02/2023

New iron and wood gate.

Photos from Four Seasons General Construction's post 07/01/2023

Helping a customer/friend board up his home and get the sand out of their home. The waves took the front door right off the hinges

Photos from Four Seasons General Construction's post 11/12/2022

Mountain View ADU almost completed. Finishing up tile today and then putting everything back together.

Photos from Four Seasons General Construction's post 20/11/2022

Always great to work with Cagatay

Photos from Four Seasons General Construction's post 05/08/2022

Lots of ideas by and a lot of work to make that vision come alive.

Photos from Four Seasons General Construction's post 11/06/2022

Building a one bedroom, one bathroom ADU

Photos from Four Seasons General Construction's post 11/06/2022

Remodeling a 6 bedroom, 4 bathroom home. They are six time repeat customers.

Photos from Four Seasons General Construction's post 11/06/2022

Added on to the wine cellar that we built a few years back.

04/05/2022

Brick was removed and replaced with a fireplace insert, Sheetrock and granite. Will also be adding a mantel.

Photos from Four Seasons General Construction's post 28/04/2022

Mountain View ADU being built. We poured the cement today and will start framing tomorrow.

Photos from Four Seasons General Construction's post 14/04/2022

Turning a garage into a home office. Adding a sliding door, recessed lighting, more plugs, flooring, baseboard, insulation, sheet rock, texture, paint and a window.

Photos from Four Seasons General Construction's post 13/04/2022

Siding repair, scrape, prime and paint

Photos from Four Seasons General Construction's post 04/04/2022

Have to cut down the bamboo to get to my next project. Three dump loads so far.

Photos from Four Seasons General Construction's post 26/03/2022

Lined a carport, power washed two houses and painted two houses. Next week we hopefully finish a master bathroom if all the material arrives, install power for two new electrical car chargers and we build an ADU.

Photos from Four Seasons General Construction's post 10/03/2022

Power washed, scraped and painted this home in Santa Clara. We are also finishing up a master bath remodel and our double bathroom remodel in Los Gatos is just waiting for a cabinet maker to make them cabinets so we can do our part in their kitchen remodel.

Photos from Four Seasons General Construction's post 18/02/2022

Master bathroom demolished, water lines moves around for walk in shower, new vanity on other side of room and toilet relocated as well. Cabinet went in today and tile is being installed.

Photos from Four Seasons General Construction's post 18/01/2022

Bathroom #2 of the back to back bathroom remodel, next is kitchen and fireplace. This was suppose to be just a quick one bathroom remodel.

Photos from Four Seasons General Construction's post 26/12/2021

Two back to back bathroom remodels. Finished one and tore out the second. Next is a kitchen and living room remodel. Owner still living in home.

Photos from Four Seasons General Construction's post 06/11/2021

Garage and side of house makeover.

Photos from Four Seasons General Construction's post 12/10/2021

Garage remodel, window replacement, stucco removal and replacement, pantry makeover

Photos from Four Seasons General Construction's post 07/09/2021

Atherton project almost completed.

Photos from Four Seasons General Construction's post 30/08/2021

Powder bathroom done, kitchen island done, back yard steps done after tree was removed, still waiting for tile for second powder bath and we will be on to the next assignment in Santa Clara. This assignment was in Atherton.

Photos from Four Seasons General Construction's post 18/07/2021

New fence installed, room painted, floor installed..pantry, plugs and we are done.

Photos from Four Seasons General Construction's post 01/07/2021

Creating a powder bathroom out of a pantry, power wash the exterior, make and paint new island, paint interior, install, sand and stain new hardwood floor

Photos from Four Seasons General Construction's post 28/06/2021

Plumbing, electrical, A/C, heat, sewer, windows, French doors, attic stairs, sub panel, sheet rock, tape and texture. New floors are coming soon.

Photos from Four Seasons General Construction's post 10/06/2021

Interior remodel, exterior touch up and demolish art studio to build an ADU/in-laws quarters.

Videos (show all)

Almost done!

Telephone

Website