Mazzei Construction builds all types of construction projects

Photos from Mazzei construction's post 01/05/2024

Countertop fabrication at its finest. This is the junction between two slabs where I’m pointing to is a seam between the two and the grain perfectly matched thank you to Mario and his guys at Cutting Edge stone you guys are the best.


Finish pictures of Kitchen to follow 

10/01/2024

So glad to have an indoor office on a rainy day 😎

Photos from Mazzei construction's post 18/11/2023

Before and after make all the difference , shout out to the boys at V's demolition , Eric Cogliati tile and Kit from cabinet town .

Photos from Mazzei construction's post 29/08/2023

Finished bathroom number two today and had too much fun with the lighted mirror 

29/08/2023

Floor mounted bath tub with brushed gold tub filler finally installed after a long master bathroom remodel  feels good to get this one off the books 👍🏻

Photos from Mazzei construction's post 26/07/2023

Completion of custom rail, hand built in Canada out of iron by a metal artist. We waited five months for delivery finally got it mounted everything came out great.  the tricky part was the fact that it was built in two pieces and had to perfectly align it between the loft cap and the ceiling.  being made out of iron, made it a bit tricky to get it up the ladder.  the fabricator, built it to my exact specs, so it fit perfectly wall-to-wall and cap to ceiling, which was amazing because metal does move and distort when you weld it very happy with the results. 

Photos from Mazzei construction's post 02/07/2023

Old Walk in bathtub to shower conversion slab on grade retrofit 

Photos from Mazzei construction's post 06/04/2023

Cool shower build

Photos from Mazzei construction's post 08/03/2023

Just going through a few pics and found a good before and after that reminds me of how hard work can be in construction and the dedication we have to the job , each job we do we go into it with a goal of just making the client happy no matter what to takes I think these two pics tell that story , also look and the change in these pics and put them into your life perspective and maybe use it improve your situation in life . stay well all and keep doing your best to make your life the best it can be

Photos from Mazzei construction's post 25/01/2023

Support post replacement , matching hand made notching

Photos from Mazzei construction's post 17/11/2022

I just could not let this go while remodeling a bath for a client she said she had a problem with the drain in her other bathroom so I went to inspect it and this is what I found 😬😬😬 this is just a kind reminder to please hire qualified contractors who take pride in their work I have attached a picture of what it should look like as opposed to what it should not look like

Photos from Mazzei construction's post 13/10/2022

Before and after kitchen remodel closed floor plan to open floor plan great design made up by the owner and really awesome client 👍🏻

13/10/2022

Enable to make a vanity float on a wall with wall-mounted faucets it takes a bit of doing as you can see 👍🏻

Photos from Mazzei construction's post 21/08/2022

Custom built window stools knotty pine stained and lacquered with six coats of satin finish one piece on the long window was the challenge 👍🏻

13/05/2022

a client wanted a set of door pulls made instead of factory made door k***s so I came with these made in my shop , kiln dried fur stained match to the doors 👍🏻

Photos from Mazzei construction's post 13/02/2022

Outdoor work phase at the ADU project going with a Southwest theme brilliant paint colors with terra-cotta stain concrete and a cobble rock swell with Drystack rock walls Great work done by Mike Cambell Painting and Central Coast Landscaping  ….lots more to come stay tuned

Photos from Mazzei construction's post 11/01/2022

Another panel finished Rough to finish just feels good to get to a completion point lots more to do on the project will be posting more pics soon

Photos from Mazzei construction's post 21/12/2021

Taped and pre-floated and smoothed ready for texture we’re getting there happy holidays everybody hug the ones you love ❤️🎄🎄

Photos from Mazzei construction's post 15/12/2021

Made it to Sheetrock stage ,ready for tape and texture , keeping the place at 65 degrees with space heaters so mud will dry 👍🏻

Photos from Mazzei construction's post 06/12/2021

Insulation phase complete R19 batts in walls , closed cell spray foam in ceiling . using closed cell spray foam utilizes the fact that we don’t have to vent the ceiling through the soffits also it’s 6 3/4” thick which equals R38 batt insulation very efficient, porch eves are sprayed with a 2 inch layer so moisture will not build up after we close it in

Photos from Mazzei construction's post 01/12/2021

Major shout out to Brooke at Grizzly powder coating for doing an absolute incredible job on my truck rims she brought them back to life and made them look brand new incredible job
 http://grizzlypowdercoating.com
Remember to support small business when you can

25/11/2021

Had a rough inspection at jobsite today passed on all counts thought I would add a rubber ducky to the inspectors day he definitely appreciated it sometimes you have to keep things on the light side during construction

Photos from Mazzei construction's post 06/11/2021

Pour completed, next phase build parking canopy and landscape in swell between wheel strips but that might become a spring project

Photos from Mazzei construction's post 29/10/2021

Time to pour some concrete wheel strips with a plant and rock living swell in the center

Photos from Mazzei construction's post 24/10/2021

Update to the ADU project , frame up , roof, rough plumbing and electrical , driveway site work . All dried in and ready for the rain

Photos from Mazzei construction's post 24/10/2021

Did some erosion control prevention at the job site today you all stay safe out there it’s going to be a wet one the next two days

Photos from Mazzei construction's post 14/08/2021

New 700sf ADU build phase one , demo old unit , grade lot , dig footings , set forms , set underlay plumbing , set rebar and pour …. Phase two pics will follow of framing stage 👍🏻

Photos from Mazzei construction's post 21/07/2021

Fire suppression re-pipe white schedule 40 above ground is a no-no for sun exposure dug down re-piped underground with white schedule 40 then stubbed up with copper Pressure test all good system back to functional 👍🏻😎

Photos from Mazzei construction's post 23/04/2021

Shower make over , existing color coat stucco smooth walls started to crack and the owner just wanted a standard tiled shower so I came up with this includes a unique corner opening door 👍🏻

Photos from Mazzei construction's post 19/04/2021

Enclose open porch project , featuring new Hardieboard V rustic cement lap siding , Millard windows and Larson storms doors great stuff that will last for ever now its just needs a painters touch which will be provided my the owner ..... finish pics to follow

Videos (show all)

A new and rare at home project , front yard fence top detail copper tube and low voltage lighting prep , ill be posting ...
Had a rough inspection at jobsite today passed on all counts thought I would add a rubber ducky to the inspectors day he...