Ritzert Retaining Wall and Concrete

Ritzert Retaining Wall and Concrete

Ritzert Retaining Wall and Concrete specializes in all types of concrete work as well as retaining w

Photos from Ritzert Retaining Wall and Concrete's post 11/06/2024

New porch & patio, new brick piers

02/06/2024

Small floor

25/05/2024

Pavilion @ the pond

Photos from Ritzert Retaining Wall and Concrete's post 18/05/2024

ICF garage now was a block one . And the start of the pavilion at the pond for next week

Photos from Ritzert Retaining Wall and Concrete's post 14/05/2024

Heated pad and steps

Photos from Ritzert Retaining Wall and Concrete's post 02/04/2024

Cut a deep pit in a basement floor for a golf simulator

02/04/2024

ICF frost wall with a slab on grade.

02/04/2024

Porch and sidewalk

Photos from Ritzert Retaining Wall and Concrete's post 17/02/2024

Slab house poured and framed .

Photos from Ritzert Retaining Wall and Concrete's post 11/02/2024

Nice winter day to put concrete down . Are winter work is moving along. Siding & windows soon.

Photos from Ritzert Retaining Wall and Concrete's post 08/02/2024

Porch on a frost wall Keep the sun coming !

08/02/2024

‼️HIRING‼️

Ritzert Retaining Wall and Concrete is hiring concrete laborers/finishers.

Requirements:
-Basic concrete/construction knowledge preferred
-Active driver’s license
-Reliable transportation (jobs start daily in Chicora)
-Show up daily on time

💲Pay based on skill set and availability to work 40+ hours/week

Call or text Ryan at 724-679-4574

Photos from Ritzert Retaining Wall and Concrete's post 18/11/2023

One more for the year

15/11/2023

Steps with the powder coated railing installed

Photos from Ritzert Retaining Wall and Concrete's post 12/11/2023

50’x72’ garage floor. Lots of water drips from the steel roof

Photos from Ritzert Retaining Wall and Concrete's post 08/11/2023

Slate stamp sidewalk.

Photos from Ritzert Retaining Wall and Concrete's post 07/11/2023

Some black exposed .

27/10/2023

Our future employee headed off to school in his “career day” gear!

Photos from Ritzert Retaining Wall and Concrete's post 11/10/2023

Stamped sidewalk and steps . Just a old gray sidewalk to go with it

Photos from Ritzert Retaining Wall and Concrete's post 06/10/2023

Driveway and sidewalk arounded back

Photos from Ritzert Retaining Wall and Concrete's post 30/09/2023

Garage floor with in floor heat

Photos from Ritzert Retaining Wall and Concrete's post 23/09/2023

Garage floor & front & back porch to finish the ICF job

Photos from Ritzert Retaining Wall and Concrete's post 19/09/2023

ICF for a garage

Photos from Ritzert Retaining Wall and Concrete's post 19/09/2023

Garage floor with in floor heat

Photos from Ritzert Retaining Wall and Concrete's post 31/08/2023

Sidewalk and apron with new drain in the garage

Photos from Ritzert Retaining Wall and Concrete's post 27/08/2023

Large basement floor in the ICF we installed.

Photos from Ritzert Retaining Wall and Concrete's post 24/08/2023

Front basement wall repair with a new sidewalk. A retaining wall too.

Videos (show all)

Slate stamp  sidewalk.

Telephone

Website