Keyser Contracting
Luray, Virginia. FREE local estimates. More than 20 years of experience providing quality work in the Luray and Page County, Virginia area. Competitive rates.
(540) 860-9484 Excavating; hauling, gravel, fill dirt, top soil, sand and decorative landscape stone; digging basements for new house construction, driveway builds & repair and more. 20+ years of experience. Fully insured and bonded. Virginia Class A Contractor license #ER 2705113805. Services include: Excavating; hauling, gravel, fill dirt, top soil, sand and decorative landscape stone; digging
Photo dump various projects pool pad, pad,footings, construction entrance. Etc
Tailgating stone season is here again
Day of footings
Cut in driveway base rock, 4” 21a to cap
Another lot ready
Photo dump final grade., yard/driveway
acre and a half for building lot, leaving a few hardwoods selected by customer.
(Photo dump) various projects, new drives/parking w/ 5” base stone capped w/ 4” crusherun, grading. etc
Working for Mathew Rowles Construction, electric service, Swail for drainage, waterline and graded yard.
Photo Dump various projects,  sewer line w/
Town hook up, construction road/entrance. Parking etc.
Phot dump various projects.,
building pads, underground electrical service, drain tile, river access point, grading., etc.
shaped w/ crown/drainage, base rock, capped w/ 21A
Photo dump various winter projects
French drain, under piping for a artesian well, ground work for electrical service, tail gating stone for a subdivision., etc
Some stone spreading before the weather (yesterday)
Get orders in before a deep freeze
Photo dump of various projects this fall, clearing projects, rework roads for drainage, drain tile., etc 
I’m thankful for all my customers who have kept me in business for 17+ years
enjoy family and
be safe! God bless you all ❤️
Photo dump various projects
Last few weeks
Old rotted pipe replaced w/ larger 4’ pipe
24’ pad for pool level to 3/4”
Sand base next
future gazebo/garden site w/ wrap around sidewalk, couple wanted lower maintenance + home insurance.
Subdivision in rileyville I spread stone for
Cleared a little lot and graded construction entrance
Another road project keep the crown high and ditches open
Hold up a good while!
Subdivision budget 5 loads 21a, and about a mile of road to be covered, tailgating stone at 15 mph not my favorite thing. But its done and all got a thin cover.
Mountain Road very steep Customer had to walk to get to his weekend property. (One of the steepest roads I’ve seen)
Told him I could help it but not expect the moon.
Moved road down hill 10’ then got 5’ in the ground. Still steep but it’s accessible w/ vehicles now. 
Winter project