Small and Tall Fix it all

Small and Tall Fix it all

You tell us your need, we design it and show you for fine tuning, after that we make it! We can buil

Photos from Small and Tall Fix it all's post 24/07/2024

Garapa deck 140mm done and dusted.

Photos from Small and Tall Fix it all's post 21/07/2024

Incoming Garapa deck 140mm

12/07/2024

A very heavy Barn door moving smoothly on the rail. Door size is 2.5mx 1.5m x 40mm.

Photos from Small and Tall Fix it all's post 12/07/2024

Some of the projects we have been busy with lately. Installing a Barn door, vanity and replacing a flooded washing area cupboard.

Photos from Small and Tall Fix it all's post 23/04/2024

Small and Tall has been busy lately. KITCHEN MAKEOVER DONE AND DUSTED.

(@smallandtall2022) • Instagram photos and videos 15/12/2023

Please follow us on the following link for the latest updates and work done by Small and Tall Fix it all

(@smallandtall2022) • Instagram photos and videos 48 Followers, 19 Following, 21 Posts - See Instagram photos and videos from ()

Photos from Small and Tall Fix it all's post 16/10/2023

We are nearing the end of this big project. GARAPA DECK IS TAKING SHAPE.

Photos from Small and Tall Fix it all's post 16/10/2023

Client has a idea, we make it.... Oak table for 12.

Photos from Small and Tall Fix it all's post 09/10/2023

Steady progress on the Deck. GARAPA 140MM DECK GETTING A NIGHT 👗

Photos from Small and Tall Fix it all's post 09/10/2023

Progress on the Garapa 140mm deck. We are putting the night dress 👗 on

Photos from Small and Tall Fix it all's post 06/10/2023

We are building a big Deck zalze.
Garapa planks are being put down after 4days work. Boom.

Photos from Small and Tall Fix it all's post 06/10/2023
Photos from Small and Tall Fix it all's post 06/10/2023

Currently we are building a big deck in De Zalze. 4days and we are starting to lay the Garapa 140mm planks today.

Photos from Small and Tall Fix it all's post 06/10/2023

Some of the latest work. Some gungle gyms for the little ones at Pret op die plaas .

Photos from Small and Tall Fix it all's post 16/07/2023

We are very happy with the outcome of the project!

Photos from Small and Tall Fix it all's post 12/07/2023

Taking decking to the next level. . Another project comes to an end. Contact us for more info.

Photos from Small and Tall Fix it all's post 08/07/2023

We have been really busy the last couple of weeks. Here are some projects Small and Tall did and still busy with

Photos from Small and Tall Fix it all's post 14/03/2023

Its been a busy time, but here are some projects thats been done. Thank you for all the amazing support!

Photos from Small and Tall Fix it all's post 15/02/2023

We have been very busy the last couple of months. Here is one of the Kitchens we finished during this time. Contact us for more info

Photos from Small and Tall Fix it all's post 21/12/2022

Its all about the finishes. High end kitchen nearing completion!

14/12/2022
Photos from Small and Tall Fix it all's post 14/12/2022

Some hard work the last couple of days. Fitting a house with some couboards! And a brand new kitchen. Almost there......

Photos from Small and Tall Fix it all's post 06/10/2022

We finished the woodwork today. Happy with the outcome of these projects. The Villa is going to be a hotty when its done.

Photos from Small and Tall Fix it all's post 02/10/2022

Balau deck done and dusted

01/10/2022

The finished product.

Photos from Small and Tall Fix it all's post 30/09/2022

All about the details!!!

Videos (show all)

A very heavy Barn door moving smoothly on the rail. Door size is 2.5mx 1.5m x 40mm.

Website