Kleins Welding

Kleins Welding

We have two fully loaded service trucks specializing in heavy equipment repair and welding also on s

09/10/2023

More 940 fun!

30/08/2023

Another backfiller will buit for an excavator to speed up backfilling tile trenches

28/07/2023

Some more segment build up

Photos from Kleins Welding's post 07/07/2023

More of the stairs we put up today with fehring iron works something different and fun

23/06/2023

Put together some 24" and welded a pull head on to go under the road for some field tile today

01/05/2023

Installed a thumb on Komatsu hoe this morning onto the next

01/04/2023

Little pipe welding for a field tile job!

12/03/2023

Equiped for all your field needs!!

Photos from Kleins Welding's post 12/03/2023

Been super busy with these 940s and 50s get with us before or after spring to get that tounge fixed!!

Photos from Kleins Welding's post 28/01/2023

Another one air arced and fitted up ready to weld out many more to go if you have a 940 or 950 get a hold of us

13/01/2023

We are now accepting applications for our 2023 season! 🍦

Requirements:
•Must be at least 16 years old.
•Able to work at least 6-15 hours per week - this will vary.
•Must be able to lift 20 pounds.

•You CAN be out of high school•

There will be a hiring process you will have to go through this year if your application is approved.

Your application can be turned into Morgan Haycraft or sent to email —> [email protected].

We will start reaching out to applicants by the 16th of January.

13/01/2023

Another one done! These are the best thing you can do to a 940 tool bar

19/12/2022

Swapped out an auger in a 10 ton fertilizer blender today

13/12/2022

Thanks for the awesome video Charlie a little footage of the last 940 we replaced the hitch mounts on! Make sure to follow him on tik tok

Photos from Kleins Welding's post 03/12/2022

Finished product ready for the field

01/12/2022

Update all tacked and fitted ready to weld out best thing you can do to a 940 or 950 alot beefier mounts on bar side and added support on tongue side like to add the tongue support bushings go all the way trough factory to new bar side mounts on tongue

01/12/2022

Another set of hitch mounts on a 940

Photos from Kleins Welding's post 01/12/2022

Little bucket repair today

Photos from Kleins Welding's post 30/08/2022

Boot for 30 inch dual wall we just finished up!

Photos from Kleins Welding's post 30/06/2022

Not our normal work but we had some time so we did some commercial fence for a customer turned out great 4x4 metal post and 2x3 metal runners he will be covering it with wood slats

18/06/2022

Been super busy but repaired a cracked frame on a tender truck today

27/05/2022

Building up segments on this wheel machine to get it ready for another year

15/05/2022

Sunday funday repairing a walking tandem on a soil finisher

13/05/2022
12/05/2022

Track adjuster and link removal on this beautiful day!

30/03/2022

Bad rear idler and some other things on this d6 now if the rain would just stop

Photos from Kleins Welding's post 24/01/2022

Been super busy haven't had time to post but here's a job we just finished a hitch to pull this plow and a weight bracket on the side to put a 2000lb Weight on to help traction while turning on to the next!

04/01/2022

Little bit of hard facing on an older tile plow today!

24/12/2021

Been super busy but here's a small job I did this morning 2 new idlers on a 323

Photos from Kleins Welding's post 05/12/2021

Big project last two days on a 940 24 knife anhydrous bar I don't think it will break again!

Photos from Kleins Welding's post 02/12/2021

I know it's been a while since posting we have just been super busy
, another d6 from system 1 to heavy duty standard tracks sprokets rollers and idlers in under 18 hours

Photos from Kleins Welding's post 06/11/2021

All done with the welding, just put the tracks back on and we will good to go

Photos from Kleins Welding's post 04/11/2021

After a long morning of air arc we are ready to put it all back together tomorrow

Photos from Kleins Welding's post 03/11/2021

Continued work pn tile plow today pulled roller frame to find a broken mount tomorrow we will be cutting mount off and welding on new

03/11/2021

Replaced some broken shifter linkage and got rid of a sticky decel pedal today on a d5 also machining some pins to remove a link out of tracks to get rid of some excess wear

26/10/2021

Working on a cutter crimper that was catching the tile as it went trough on this fine day

22/09/2021

Finished the wheel today after putting new guides on after we finished building up sprocket segments

20/09/2021

Been welding on this hydramax wheel machine for two days building all of the teeth back up ready for another season now also removed old guides and welded new all the way around the wheel

31/08/2021

Getting set up and ready to build up all the teeth for another season on this hydramax wheel machine

Videos (show all)

Fun project today with our buddies at fehring iroin works today putting up this beautiful set of stairs
Thanks for the awesome video Charlie a little footage of the last 940 we replaced the hitch mounts on! Make sure to foll...
Update all tacked and fitted ready to weld out best thing you can do to a 940 or 950 alot beefier mounts on bar side and...

Website