Surefire building multi-trade

Surefire building multi-trade

Multi tradesman. Tiling, plumbing, joinery, plastering, paint & redecs, maintenance & renovations.

08/09/2024

Little job this weekend.

Small kitchen splashback tiled in Sankey.

29/08/2024

Always great to get positive feedback from clients.

👌👍

Photos from Surefire building multi-trade's post 28/08/2024

Flooring completed yesterday in Manchester.

Pattern tiles from tile giant. Grey grout and white sealant.

Sub floor built with cement boards, durabase matting.

Aslo front porch area tiled with mitred epoxy resin step.

28/08/2024

All done here in Manchester for an early dart 👍.

Photos from Surefire building multi-trade's post 28/08/2024

Kitchen splash back completed today in Manchester.

12/08/2024

Before and afters

Photos from Surefire building multi-trade's post 12/08/2024

2 bathrooms in 2 weeks by myself.

With a wall needed to be rebuild by some dodgy plasters

Metro white marble gloss & 600 x 600 slate style porcelain.

Black grout throughout.

Photos from Surefire building multi-trade's post 25/07/2024

Bathroom completed.

Prep tile and majority of the 2nd fix completed.

1st fix completed external of Surefirebuilding Ltd.

25/07/2024

Bathroom completed.

Fully tiled. Fluted tiles, epoxy resin mitred edge window reveals.

2nd fix completed bar bath panel.
1st fix for bathroom completed external to Surefire building Ltd

Photos from Surefire building multi-trade's post 25/07/2024

Small job.

Base built for new shower tray.

Walled primed and ready for tiling.

Photos from Surefire building multi-trade's post 25/07/2024

Sub floor built and laid before installing these marble gloss porcelain.

Grout and sealed in readiness for free standing bath to be fitted.

26/06/2024

Fireboarding a loft today.

Hotter than a sauna 🔥

22/06/2024

Recent client feedback 👍

Photos from Surefire building multi-trade's post 18/06/2024

Base coat render over pepple dash.

Installation of red brick slips. Finished with great mortar.

Photos from Surefire building multi-trade's post 18/06/2024

Render base coat over pepple dash.

Red brick slips installed with grey mortar finish.

07/06/2024

All these years I've been getting pi**ed off with prices of tiling materials.

MKM rescue. Ain't going back to the likes of Topps and CTD now who've been taking the p**s now for a while.

02/06/2024

Kitchen splashback completed.

Black tile, black grout, black sealant.

Photos from Surefire building multi-trade's post 02/06/2024

Kitchen completed In Altrincham thos week.

Photos from Surefire building multi-trade's post 24/05/2024

Newt fancy this week.

Floor over boarded and new lino, new towel rail rad, new glass screen, new wooden bath panel & plinth, new shower riser kit, re grout and re seal.

18/05/2024

Kitchen tiles and new sink finished
In Sale Manchester.

Photos from Surefire building multi-trade's post 17/05/2024

Start to finish.

Kitchen tiling, new sink and taps complete today.

Photos from Surefire building multi-trade's post 16/05/2024

So far doing this Kitchen splash back in Sale.

Few bits to finish off before the grout and seal.

Changing the sink and taps also, pictures to follow.

Photos from Surefire building multi-trade's post 16/05/2024

Two flats fully redecorated in Leeds last weekend.

Fully professionally cleaned by Carlisle Sellidon and his company CGS cleaning.

Photos from Surefire building multi-trade's post 03/05/2024

Front step here finished in Stockton Heath.

Milton style with matt black border.

Black and graphite grout to finish.

02/05/2024

Tiling this step today 💪

30/04/2024

New sink installed.

Endless fun to be had with this sink.

Photos from Surefire building multi-trade's post 29/04/2024

Before and after of internal redecs of this house I completed in Congleton. House 100 year old apparently.

Freshly plastered from a water leak.

Mist coat in Leyland, top coat Tikkurila anti reflex and Dulux Teal Matt. Woodwork in satinwood.

23/04/2024

Another good un 👌

Cheers

21/04/2024

Full wrap around bathroom start to finish complete.

Prep, plumbed in fully, Tiled to a sealed finish.

Photos from Surefire building multi-trade's post 21/04/2024

1st full bathroom. Over the road from the Etihad stadium.

1st & 2nd plumbing completed, Tiled, sealed, extractor and door hung.

Customer wanted to paint box behind toilet.

Onto the next.

Videos (show all)

Little job this weekend. Small kitchen splashback tiled in Sankey.
All done here in Manchester for an early dart 👍.
Bathroom completed. Fully tiled. Fluted tiles, epoxy resin mitred edge window reveals. 2nd fix completed bar bath panel....
Kitchen splashback completed. Black tile, black grout, black sealant.
Kitchen tiles and new sink finishedIn Sale Manchester.
New sink installed. Endless fun to be had with this sink.
Full wrap around bathroom start to finish complete. Prep, plumbed in fully, Tiled to a sealed finish.
Testing out the wet room drain. 💪👍

Telephone

Website