Cameron Civil LTD is a West Auckland based civil construction company building residential and commercial sub divisions, bulk earthworks, kerbing, and roading.

Photos from Cameron Civil LTD's post 10/12/2021

Puketutu Island progressing well, the new Volvo Ec480 and A30G , A30F and Komatsu D65px dozer are hard out, the newly designed Volvo L180G compactor is also doing a great job spread and compacting the fill.
Good on the Team Tony, Mike, Joy, Leo and Dave for all your efforts.šŸ˜ŠšŸ‘

Photos from Registered Master Landscapers New Zealand's post 12/11/2021

Cameron Civil are proud of our Team and Georgeā€™s management and construction of this technical project, it all paid off as the quality has won an Award for HEB.

Photos from Cameron Civil LTD's post 12/11/2021

VOLVO L120H COMPACTOR, The compactor kit and L120H have been delivered to the engineering workshop to start fitting for the new conversion. This compactor will be completed before Christmas ready for work and demonstration. The photo of the model will be the finished product. We have ordered a new Volvo L150H loader and will be delivered by 19th of December, this build will begin right after the L120H conversion. Will keep everyone posted with progress.
The new compactor wheels are being welded up and the dozer blade is have the final mounting positioned, we will miss our Xmas target ā˜¹ļø but mid January looking good ! šŸ‘šŸ‘

09/11/2021

Puketutu job gaining momentum, the new Volvo gear performing well, the operators are very happy and comfortable. Another 6 months to go!

Photos from Cameron Civil LTD's post 06/11/2021

SELO, progressing well, decontamination now complete, well underway with the environmental controls to allow the start of the bulk earthworks, the main stormwater 1050mm line is being installed mid November. To reduce our trucking impact on the local roads we have been able to backload construction aggregates. Manukau Quarry has been really helpful in enabling this.
Progressing well, surplus topsoil all but gone, main trunk stormwater and sewer underway, excavation of the unsuitable of main gully started, some nasty stuff in there!šŸ˜”. But we will sort it out.

Photos from Cameron Civil LTD's post 19/10/2021

Some of our new Volvo equipment starting to arrive at our sites. Today the new Volvo A30G dumper showed up at SELO to help strip the topsoil.

In search of the perfect surface 17/10/2021

In search of the perfect surface Cameron Civil recently acquired the Komatsu D61PXi-23 dozer fitted with a fully factory integrate...

17/10/2021

SELO Fly over supplied by client.

Photos from Cameron Civil LTD's post 17/10/2021

Rowan Block Stage 3b is all but finished , George and his team have done a great job, now progressing onto the roading on stage 3bi, Civil Kerb have laid down plenty of kerbs.

17/10/2021

SELO progressing well, clearing and demolition completed, recycled crushed concrete ready for reuse, 9 ton of scrap steel recycled, we are now undertaking the environmental controls ready to start the bulk earthworks. Pipes and manholes are ordered. Now with this great weather we can get stuck in!

26/09/2021

BULK EARTHWORKS PROJECT
Starting mid October, a 8 month project shifting lots of earth, working with the CLC and FH team, another awesome project to be involved in, will need operators to swap out with operators on Volvo EC480 excavator, Volvo A30 dumpers and Komatsu D65px-17 dozer. Long days but the machines have great aircon and radios. šŸ˜Š

Photos from Cameron Civil LTD's post 26/09/2021

CIVIL KERB READY TO POUR ROWAN BLOCK STAGE 3Bi KERBS
Hugo and his team are all set to go, and should knock out this 350m job in a couple of days!
They have some free days over the next few weeks if you need some Kerbing.

Photos from Cameron Civil LTD's post 25/09/2021

SELO RESIDENTIAL SUBDIVISION GLEN EDEN.
We have been awarded this 248 unit housing development and are responsible for undertaking the earthworks, drainage, roading, services, concrete works, Kerbing etc etc, this is a 12 month project. Want to help? Get in touch.

Photos from Cameron Civil LTD's post 25/09/2021

JOB VACANCIES MACHINE OPERATORS, ETC
Cameron Civil have large projects in Glen Eden, Mangere and Flat bush and are looking to Hire machine operators and others for these projects, Full drivers licence a must, WTR preferable, be drug free, as we and our clients require a drug free environment.
Want to learn and develop new skills and become proficient at operating a variety of equipment.
We have late model machines with most fitted with GPS machine control. We pay well above the going rates and pay bonuses. Hours are consistent.
Send through your details now.
Projects already started, new machines ready to be delivered.

17/07/2021

Cameron Civil and me personally support this Protest, the power of the people! If like minded people continue to pressure this current Government, then ultimately common sense will prevail!

17/07/2021

CARBON ZERO.
We have been monitoring and collecting information and inputting this onto the Governments Carbon Emission spreadsheet, over the past two years we have banked 2880 tons of carbon credit, we are Carbon Zero! With the total of 44 diesel machines and 12 utes which are all diesel powered, we can operate a business successfully and be environmentally neutral.

07/07/2021

We are just starting a new housing development in Gleneden, starting the clearing and demolition this week, with plans for environmental works and earthworks starting in September, we will be looking for operators for this and other projects this up coming season.

Photos from Cameron Civil LTD's post 13/06/2021

Cameron Civil were pleased to supply some our Volvo machines for Transdieselā€™s Volvo day at Stevensons quarry, it was certainly a great day to look over and operate the Volvo equipment.

Photos from Cameron Civil LTD's post 04/03/2021

We started the second stage of the development of the Volvo earth compactor, this week our new Volvo L120H arrived, we have the compactor wheels ready and the design of the blade and cleaner bar system is complete, we are planning to have the compactor/loader complete by end of May 2021 with testing and trials in the new earthworks season in October.
We are bringing the comfort, fuel efficient Volvo product into a different application.
A loader that can transform into a earth compactor for the summer and then converted back to a wheel loader for the winter, ensuring full utilisation of the Volvo.
Watch out for more progress posts.

Photos from Cameron Civil LTD's post 03/02/2021

Finished the final benches and batters for Manukau Quarry high wall, Angus and Thomas did a great job completing the 24000m3 job on there own with a wide variety of Volvo machines to choose from, Another extremely happy customer, George and the team are off to Flat Bush to build another subdivision , Thatā€™s a Top Job by a Top Team.

Photos from Cameron Civil LTD's post 09/01/2021

Civil Kerb Ltd a machine Kerbing business is looking for a experienced concrete worker to join the team, a class 2 (preferably class 4) licence important, working mainly around West Auckland ,
Great team of guys, modern well maintained equipment and plenty of forward work.
Get in contact if you are interested, excellent pay and benefits.
Call Tony 021923182

Photos from Cameron Civil LTD's post 07/01/2021

Cameron Civil have some surplus machines for sale or hire, these units have been parked up for awhile as the projects we are working on donā€™t suit these machines.
caterpillar 627G motorscraper, 13000hrs, factory auger in bowl, excellent condition, auto grease, Topcon GPS machine control, and all the factory options. $300k plus GST
Caterpillar D7H dozer fitted with Topcon GPS machine control, 12000hrs, new engine ($50k) just installed very good condition. Hydraulics for scoop, $120k plus GST

07/01/2021

Hero International site, another view. Always good to watch top operators on top gear!

07/01/2021

We are progressing well on a new Industrial development in Westgate for Hero International, challenging envoromental controls around council park and watercourse, stripping topsoil for screening and reuse on other projects and 22000m3 of cut to fill to design levels, we expect to be finished by mid February

Photos from Cameron Civil LTD's post 20/06/2020

a sample of photos of late model GPS fitted machines available for hire or contract works,

plant list decription k hire.pdf 20/06/2020

We have spare equipment available for hire with or without operators or on contract rates if you prefer, get in touch if you need assistance.

plant list decription k hire.pdf Shared with Dropbox

Photos from Cameron Civil LTD's post 20/06/2020

returning to work on Covid Alert level 3 we were able to cut and fill 8500m3 of clay from the new Northside Drive Business Park site to the Cox property to enable main drainage lines to be installed, had it all completed before the rain! Plus the added benefit of removing the preload off the new building platforms.
canā€™t beat Volvo and Komatsu machines with GPS to get the job done. Plus great operators.

Photos from Cameron Civil LTD's post 20/06/2020

installing Precast HQ Civil Raingardens at a precast concrete site, great that Kerbing could be installed onto raingardens, very easy system to install.

04/04/2020

cat 627g cutting and filling with our new Volvo compactor, this scraper is unusual with its 1m diameter auger which draws up the clay into the bowl, plus breaking up the clay. Cuts out need for push loading or in combination with another scraper push/pulling.
Handy tool working on its own.

03/04/2020

VOLVO L180 Compactor trialling with our 627g scraper, did a little 8000m3 earthworks job on Northside Drive for Bradley Dibble, the Volvo kept up nicely with a scraper load every 2 1/2 minutes, the testing was at the top of dial, overall the new compactor is a success.

27/03/2020

Concrete crushing complete ! Four days, four great operators and the right machines. Finished, 5000tons , shifting to Downers to continue recycling concrete and hotmix millings for reuse.

Photos from Cato Bolam's post 27/03/2020

POND 4 project we constructed during the winter months, was certainly a challenge but completed on time.

25/03/2020

Recycling! Crushing a demo floor and outside hard stand area, reusing crushed 40 into council park project and a new yard development.

Photos from Cameron Civil LTD's post 25/03/2020

Helensville Wastewater Treatment Ponds. We are assisting Fulton Hogan modify one of the ponds , today we poured a 150m section of the ring beam around the pond, it has been challenging as there isnā€™t much room and we have weight restrictions on the access roads.
We appreciate Rick & Reneeā€™s teams assistance in getting this done. Unfortunately we have to stop and wait for this flu to pass.
It is for the best of our country and people. Be patient.

25/03/2020

Collindale Park 4WD Race Track, we are currently shifting 23000m3 of earth to build a race track, we have our Topcon fitted Cat 627g scraper, Komatsu D65 dozer, Volvo Ec235 excavator and Westcityā€™s D8 and scoop all flat out! We are well down the track to completing on time, you canā€™t beat top machines, top operators and GPS, I would like to thank Karl Sorenson for reaching out to us to assist in this Project. Bring on the next one !