Pakal Dul HE Project Kishtwar

Pakal Dul HE Project Kishtwar

The Pakal Dul H E Project of 1000 MW installed capacity is proposed on river Marusadar, a tributary The annual generation will be 3387 MU.

The Pakal Dul H E Project of 1000 MW installed capacity is proposed on river Marusadar, a tributary of Chenab in district Kishtwar of J&K State. The project envisages construction of a 167 mtr high Dam, 2 nos. of HRT of 7.20 mtr dia with 10 km length, an underground Power House with 4 units of 250 MW each.