N.W Property Maintenance
NW Property Maintenance
All Trades Covered ~ No Job Is Too Small Or Too Big ~ Give Us A Call Or Drop Us An E-mail Now For A Free Quote On Any Work
Extention and house re fit :-
Full re wire
Fully plastered
Full plumbing
Brick and block work
Flat rubber roof
Fascias and soffits
Bathrooms
Kitchen
Internal and external doors
Skirting and architraves
Painting
Flooring
And I big thank you for a helping hand to :-
KM Conservatories
Walker Electrical Services WES
Another week another kitchen !
From start to finish
Rip out
Electrics
Plumbing
Plastering
Joinery
Flooring
Painting
Feature wall
Heating
Start to finish kitchen project
Bespoke utility
Additional down stairs toilet.
Plumbing
Electrics
Joinery
Plastering
New French doors
Tiling
Quartz worktops
New radiators installed
I am super proud to sponsor Ossett Town Rubies !!!! Keep up the good work girls !!!
En-suite full replacement.
Electrics
Plumbing
Tiling
Plastering
Full house window swap.
Front door swap.
New windows with run through horns.
New front door with number in glass.
Conservatory roof replacement:-
All works undertaken.
Plastering
Electrical works
Roof tiling
Lead work
Gutters and fascia
Insulation
Joinery
Kitchen install:-
Electrical works
Flooring
Plastering
Kitchen units
Joinery
Plumbing
Quartz work tops
Porcelain tiles installation.
Bathroom install:-
Tiling
Plumbing
Heating
Electrical
Flooring
House renovation :-
Thank you for all trades and companies that helped me along the way with this job. Massive shout out to KM Conservatories for the help from start to finish.
Plenty of work undertaken with this being the first stage of the job, there still loads to be on within the near future on this property.
Garden renovation:-
New latt fencing
Eletrical works
New stone wall
New latt gate
Porcelain paving tiles.
New soil in planting areas
New soil awaiting new turf (pictures later)
Full bathroom swap.
Tiling
Lighting
Flooring
Plumbing
Horbury:- front renovation.
Full new entrance way performed.
All works carried out:-
Windows
Door
Joinery work
Brick and block work
New roof with velux
Rendering
Alarm and camera system
New steps in and out
Kardeen flooring
Bespoke cupboards
Oak cladding
Fasia and gutters
Plastering
Insulation work
Electrical work
Painting
Also special thank you to KM Conservatories who helped out along the way.
Conservatory roof replacement. 20m2
Redesigned shape
Fully insulated
Tiles
Gutters
Soffit and fascia
Plaster board and plastered
Spot lights
Rendering to follow in a few week
Conservatory roof
Full conservatory roof replacement.
Tapco tiles
New fasias
Insulation
Timber work
Lead work
Lighting box
Electrics
Plastering
Gutters
Velux windows
Insulation and ply lining Summer house. Ready to be painted and flooring.
Stanley extension
full works was undertaken from start to finish.
Decking
Fencing
Brick work
Roofing
Artificial grass
Plastering
Joinery
Electrics
New Composite door change
Matching garage door change
Conservatory roof swap
Fully insulated
Light weight roof tiles
Electrics
Plastering
New plastics
Stanley
New Fascia soffits and guttering work
New block paving drive way
New steps
Decorative slate
Drop kerb 
Northfield lane horbury
Full house of new internal doors fitted.
Northfield lane horbury
Kitchen from start to finish
Structural work
Electrics
Plastering 
Plumbing
Heating
Joinery
Tiling
Flooring
Quarts worktops
Bathroom handover day !!!!!
From start to finish
Done it all
Stoneshome
Doncaster.
Starting to take shape now.
Cladding with trims complete.
Composite decking to match.
White ceiling overhang cladded.
First fix electrics
Plaster boarded and ready to start tomorrow with the plastering.
Stoneshome
Doncaster update:-
Wooden cladding complete to back and side where it not over seen.
Rubber roof complete with all trims
Insulation in and done
Electric 1st fix complete for projector, ceiling speakers , bar area, darts light, pin ball, air hockey and much more.
Composite cladding started and ready to go on tomorrow.
Alongside Stoneshome
So that’s walls wrapped and prepared for the cladding. All noggins in walls and ceiling/ roof ready for insulation. Next step rubber roof next week.
Stoneshome
DAY 4 :- Doncaster
The bar is on it’s way.
Stoneshome
DAY :- 1
Doncaster
Garden room
Hoping to keep you updated on this one as it going to be a monster of a Bar.