Schneider CM, Inc.

Schneider CM, Inc.

Construction Management

Working primarily as an Agency CM, we provide: project management, construction management, program management, program controls, quality assurance, on-site inspection, constructability review, value engineering, cost estimating, scheduling & pull planning services from pre-design, through construction to closeout, acting as the owner's representative.

CMAA Honors 17 Outstanding Construction Management Projects | Construction Management Association of America 22/12/2023

https://www.cmaanet.org/press-releases/cmaa-honors-17-outstanding-construction-management-projects

CMAA Honors 17 Outstanding Construction Management Projects | Construction Management Association of America The Construction Management Association of America (CMAA) is pleased to announce it has recognized 17 projects for outstanding achievements in construction management in 2023. The 2023 CMAA Project Achievement Award winners are: Commercial/Sports/Entertainment/Hospitality: Construction value greater...

Photos from County of San Diego Parks and Recreation's post 22/12/2023

Very proud of Robert and Connor’s CM leadership with Park & Rec on this fantastic project.

Photos from City of Carlsbad's post 01/04/2023

Beautiful πŸ˜€

30/03/2023

What an honor working on our neighborhood Fire Station 2. Great work Robert πŸ™πŸ»

New artwork is being installed at Fire Station 2! πŸ™Œ Artist Mary Carter Taub has designed a series of glass panels for the south-facing tower of the station. It will be the first artwork of its type in the city's public art collection and the first public art installation in south Carlsbad.

The artwork is a β€œmap mashup” of aerial views of Carlsbad and takes color inspiration from the vibrant Flower Fields, Batiquitos Lagoon and sunsets.

The city recently finished renovating the station to better meet the community's public safety needs. Learn more: https://loom.ly/VBhwxdA

Photos from San Diego Unified School District's post 08/02/2023

Nicely done Erik πŸ™πŸ»

09/12/2022

2022 Orchid winner for Signage and Teen Jury Orchid for Architecture
Logan Memorial Educational Campus TK-8

Architect/designer - DLR Group – BakerNowicki
Graphics & signage - Visual Asylum
Owner/developer - San Diego Unified School District

The Logan Memorial Educational Campus replaced the existing campus and adds a new child development center. The building forms are simple, bold and influenced by Mexican modernism, resulting in architecture that fits the neighborhood and builds on the rich cultural history of the area.

Jurors' comments:
"We were really attracted to what the sign can do for a place. When we approached the building several of us turned and looked at this welcome sign. We started wandering closer to it and saw all this detail. It was really artfully crafted, from the engraved detail of each letter to inlaid artwork detail. This is essentially urban art and also serves as way-finding. We were talking about design matters everywhere, like at every scale, because even if you do a great sign, it contributes to the whole building, the whole place. They did a great job of integrating art throughout the campus. We imagine the young students will really enjoy this."

πŸ“Έ Zack Benson

Photos from City of El Centro's post 16/11/2022

Such a rewarding project not only providing such a beautiful and much needed community building, but also in working with such a fantastic team with the City of El Centro, FPBA Architects, and Barnhart-Reese Construction.

18/10/2022

El Centro Library Grand Opening - November 10, 2022

Please join us to celebrate the opening of the new El Centro Library. Ribbon Cutting Ceremony will be at 4:30 pm.

14/10/2022

Join the City of La Mesa for the ground breaking ceremony for the Collier Park Renovation Project on Tuesday, October 25 at 10:30 AM.

The year-long construction project will include new restrooms, tennis/pickleball courts, playground, fitness equipment, a nature trail, picnic pavilion, landscaping, improved ADA access, and parking.
The project, with an approximate cost of $4.5 million, is being completed with funding that has been allocated from park development fees, Federal Community Development Block Grants (CDBG), La Mesa Park and Recreation Foundation, CA Department of Parks and Recreation Local Assistance Specified Grant funds, and CA Proposition 68 Land and Water Bond funds.

As part of the project, a replica of a historic drinking fountain will also be installed in its original location next to the La Mesa Depot Railroad Museum on Spring Street. The playground has already been removed and the restrooms were closed due to inoperability.
For updates and more information, visit https://www.cityoflamesa.us/1652/Collier-Park

Photos from San Diego Unified School District's post 11/10/2022

Fantastic design by the Baker Nowicki team, and a special call out to Buddy Gessel & Young Abulencia for seeing it realized. It was such a pleasure working with them and Balfour Beatty Construction on the beautiful LMEC campus πŸŽ‰πŸŽŠπŸΎ

04/10/2022

Looking forward to working on these wonderful park improvements πŸ‘

Later this fall, Collier Park will be closed for construction of park improvements. Work will include new restrooms, tennis/pickleball courts, playground, fitness equipment, a nature trail, picnic pavilion, landscaping, improved ADA access, and parking. As part of the project, a replica of a historic drinking fountain will be installed in its original location next to the La Mesa Depot Railroad Museum on Spring Street.

The project, with an approximate cost of $4.5 million, is being completed with funding that has been allocated from park development fees, Federal Community Development Block Grants (CDBG), La Mesa Park and Recreation Foundation donations (for the new playground), CA Department of Parks and Recreation Local Assistance Specified Grant funds, and CA Proposition 68 Land and Water Bond funds. For updates, visit the project website at https://www.cityoflamesa.us/1652/Collier-Park.

29/08/2022

This is why we love building schools πŸ˜€. What a fantastic community, facilities team, educational team, architectural and engineering team, and contractor team to work with πŸ‘

Photos from DLR Group's post 19/08/2022

What a fantastic experience working with Buddy & Young and their A&E team on this fantastic project πŸ‘

27/07/2022

A beautiful addition to a beautiful park. Great work Connor πŸ‘

23/04/2022
10/04/2022

Great work Robert and Connor. Such a wonderful addition to Carlsbad’s beautiful parks.

02/04/2022

Shaping up nicely πŸ‘

02/04/2022

Great work Connor and Robert. The park is looking great πŸ‘

New school, Logan Memorial Educational Campus, to be added to SDUSD - 14/01/2022

New school, Logan Memorial Educational Campus, to be added to SDUSD - SAN DIEGO (K**I) – On Good Evening San Diego, K**I’s Ginger Jeffries talked with Melanie Kray, a Middle School Principle, about the new Logan Memorial Educational Campus that will be coming to SDUSD in fall of 2022. This is their mission statement: β€œThe Logan Memorial Educational Campus seeks ...

Photos from DLR Group's post 14/01/2022
11/01/2022

The steel framing is going up! We are making good progress on the reconstruction of Fire Station 2 in La Costa. The new energy-efficient building will accommodate up to five emergency response vehicles, including a 60-foot ladder truck, fire engine and an ambulance. It is on track for completion later this year. https://loom.ly/82bkH1o

Videos (show all)

Modernizing a school campus is sure to uncover a few unforeseen conditions. But this was certainly quite a gem. Thank yo...

Telephone