Ardreagh Formwork

Ardreagh Formwork

Ardreagh Formwork are Melbourne based formwork specialists, delivering high quality projects with ma

Help get lost loved ones back home., organized by Gerard Murphy 13/10/2023

Hi, I'd really appreciate it if you could share or donate to this GoFundMe campaign.*Help get lost loved ones back home.*

The Kevin Bell Repatriation Trust aim to alleviate the financial hardship of bereaved families repatriating the body (bodies) of loved one(s) who ha…

Read more here https://gofund.me/3f317843

Forward this message to your contacts to help this campaign reach its target!

Help get lost loved ones back home., organized by Gerard Murphy The Kevin Bell Repatriation Trust aim to alleviate the financial hardship of bereav… Gerard Murphy needs your support for Help get lost loved ones back home.

Photos from Ardreagh Formwork's post 28/05/2023

Lots done and more to do!

Our team on the WGTP Southern Portal Inbound have been busy underground in the cut & cover. Structural works were completed in preparation for the breakthrough of the largest TBM in the southern hemisphere (15.6m diameter). This involved completion of the detailed structural base slab, concrete plinths, retaining walls and the glass fibre reinforced sill beam.
Following the TBM breakthrough, work has now recommenced on the build out of the Southern Portal cut & cover works. This scope involves FRP (Form, Reo, Pour) construction of base slabs (5,000m3 of concrete and 1,250 tonnes of reinforcement), in-situ walls (over 5,600m2 of formwork and 1,600t of reinforcement), in-situ concrete overhead struts, corbels, overhead smoke duct slabs, drainage install and construction of the OHVR (Overhead Vehicle Ramp).

Photos from Ardreagh Formwork's post 28/04/2023

A major component of the new Metro Tunnel project involves the build out of the CBD South Precinct. Our team at Flinders St. has been busy constructing the structure of Shaft A and B, which extends from 40 meters below ground level up to the surface. Due to the site constraints in Melbourne CBD, a significant amount of detailed engineering & planning was necessary to manage logistics and meet the project program.

Our team in Laverton North has been prefabricating engineered formwork systems, which are delivered to the CBD site precisely when needed. They are lifted directly from the semi deliveries and lowered into the shaft where they are placed straight into the set-out position. This approach is something we have been implementing on all sites. It enhances safety (reduced working at heights), enables an accelerated program, and saves crucial space onsite.

The area of shaft A & B extends over 2,500m2 and extends over 5 levels. The works consist of base slabs, 9m high columns & walls, 10m high suspended structural slabs, arches and plunge column infills. Work is progressing nicely ahead of program with shaft B almost complete and work ongoing in shaft A - level B2 suspended.

Photos from Ardreagh Formwork's post 19/04/2023

Following the successful completion of early works on the North East Link Project, we have recently been awarded a contract on the main works package of the North East Link Tunnels.
We are currently completing the capping beam and retaining walls for the box that will launch the massive TBM next year on the Watsonia site.
Our works scope consists of pile breaking, steel fixing, form and pour, for approximately 900m of retaining wall ranging from 1.2m to 5m in height.

07/04/2023
19/08/2022

In support of our dear colleague and friend, Tony “Lips” Lythgo, who was recently diagnosed with Stage 4 Lung Cancer, we have set up a Go Fund Me page. We would like to support Tony and his family during this difficult time to help relieve the financial stress and would really appreciate if you could help us do the same.

https://gofund.me/0473915d

Photos from Ardreagh Formwork's post 13/05/2022

Following the completion of a number of successful contracts on Melbourne’s Metro Tunnel, we have recently been awarded a major package on Melbourne’s West Gate Tunnel. This package involves construction of the tunnels Sothern Portal (Inbound) where vehicles will transition from above ground to below ground and enter the tunnel heading towards the city.

The scope of this project will consist of FRP (Form, Reo, Pour) construction of base slabs (5,000m3 of concrete and 1,250 tonnes of reinforcement), in-situ walls (over 5,600m2 of formwork and 1,600 tonnes of reinforcement), in-situ concrete overhead struts, overhead smoke duct slabs, drainage install and construction of the OHVR (Overhead Vehicle Ramp).

HR Truck Driver / Yardman Job in Melbourne 11/05/2022

HR Truck Driver / Yardman Job in Melbourne Ardreagh Formwork is a successful owner run business specialising in formwork, steel-fixing and concrete works for both residential and commercial builds.

Photos from Ardreagh Formwork's post 04/05/2022

After successful completion of packages on the Metro Tunnel Project’s Arden and Anzac stations, we have been awarded multiple packages within the Town Hall Station precinct. The packages include form and concrete works to passenger and egress adits, and link sections beneath Federation Square, Flinders and Collins Streets.

Contract Administrator / Post-Contract Quantity Surveyor Job in Melbourne 29/04/2022

We are currently looking to hire a Star Contract Administrator to join our close-knit team working on the Metro Tunnel Project.
View the role on SEEK and get in touch if the role suits you!

Contract Administrator / Post-Contract Quantity Surveyor Job in Melbourne Ardreagh Formwork require to fill the position of Contract Administrator / Post-Contract Quantity Surveyor, to manage their sub-contract on the Melbourne Metro Tunnel project in Melbourne CBD. Join a close-knit team in delivering a unique and complex contract, working closely with Foreman, Site Mana...

Telephone