AJE carpentry

N E W B U I L D S | D E C K S | R E N O V A T I O N S | E X T E N S I O N S

Photos from AJE carpentry's post 13/04/2023

Facade repair and new window awning 👌

Photos from AJE carpentry's post 13/04/2023

Wall removal and reframing for new kitchen install

Photos from AJE carpentry's post 13/04/2023

Structural steel install to make way for a massive 7 metre wide sliding door

Photos from AJE carpentry's post 13/04/2023

Reframing and sheeting on a couple of water damaged decks

Photos from AJE carpentry's post 13/04/2023

Quick post replacement for this front porch

Photos from AJE carpentry's post 13/04/2023

Slide out bar top and fit out on a horse float for a mobile bar 🍺🍺

Photos from AJE carpentry's post 13/04/2023

Toilet renovation with new tiling and custom made blackbutt vanity

Photos from AJE carpentry's post 13/04/2023

Wall removal, reframing and some new window openings for a old farm house

Photos from AJE carpentry's post 24/08/2021

Massive swim spa sunk into the ground and wrapped with a new tech deck and alfresco area is coming along nicely👌

Photos from AJE carpentry's post 23/08/2021

Free standing merbau arbor

Photos from AJE carpentry's post 23/08/2021

Exposed aggregate and merbau used for a wrap around deck tied back into existing house to make a awesome entertainment area 👌

Photos from AJE carpentry's post 23/08/2021

Double story entertainment area with the old deck framed in with windows and cladding to match existing house

Photos from AJE carpentry's post 23/08/2021

Merbau deck to start off this clients backyard renovations

Photos from AJE carpentry's post 23/08/2021

Precast pool install with spotted gum deck and entertainment area

Photos from AJE carpentry's post 23/08/2021

Some structural changes on the back of this house to allow bifold doors to join kitchen and entertainment area

Photos from AJE carpentry's post 23/08/2021

Master bedroom renovation topped off with a double cavity slider👌

Photos from AJE carpentry's post 23/08/2021

Living and kitchen extension tied back into existing house, with a Blackbutt deck entertainment area

Photos from AJE carpentry's post 21/12/2019

New build at teralba has come along way and ready just in time for Christmas, can’t wait to get back in 2020 and add the final touches

Photos from AJE carpentry's post 21/12/2019

Old doorway removed,new kitchen and window installed with a fresh coat of paint and some new floor coverings for this unit

Timeline photos 21/12/2019

Merbau privacy screen

Photos from AJE carpentry's post 21/12/2019

Nice face lift with the new windows and cladding just in time for Christmas

Photos from AJE carpentry's post 21/12/2019

Nice bit of soffit lining to a concrete deck

Photos from AJE carpentry's post 21/12/2019

Double garage converted into bedrooms and a laundry with some new windows and entry doors

Photos from AJE carpentry's post 21/12/2019

New boundary fence

Photos from AJE carpentry's post 21/12/2019

Bit of a tallowwood treat for this run down front entry

Photos from AJE carpentry's post 21/12/2019

A few little slabs done throughout the year

Photos from AJE carpentry's post 21/12/2019

Framing and cladding repair to garage wall

Want your business to be the top-listed Contractor in Newcastle?
Click here to claim your Sponsored Listing.

Category

Website

Address


Newcastle, NSW

Opening Hours

Monday 7am - 6pm
Tuesday 7am - 6pm
Wednesday 7am - 6pm
Thursday 7am - 6pm
Friday 7am - 6pm
Saturday 7am - 4pm