Biddulph plastering
services:
Dry linning (Dot & Dab) (Screw fix). Rendering (Internal/External). New skims and reskims Plastering services:
* Skims and re-skims: Walls. Stop beads.
Ceilings.
* Dry-linning: Dot & dab internal walls. Screw & fix on to stud partitions.
* Rendering: Internal. External.
* Beading: Angle beads. Internal/External. Arches.
* Painting: Walls and Ceilings (Internal only). Floor protection is put down on every job I do and all rubbish is removed from site. I also do a full clean up, and will not leave until the customer is 100% happy with my work and t
Customer has wait 4 years to get this bathroom finnished. Been a pleasure doing this one.
Rosiecocopops is settled for the night. She's had a very hard day, chewing toys, eating food and playing with her ball. Lol
Couple off jobs done this week. This is one off them.
4 days to smash this one out. Another happy customer.
Got this one done last week. Stripped to bare brick last April. And put it back together this year. Built a new ensuite walls, and all coving and wood work done by myself.
All ready for Mr. Neil garlick.
Stripped thos room back last year on April. Now finally putting it back together. Ceiling reboarded, external walls, using 27mm P.I.R Boards and built the on-suite bathroom. Will be back in two weeks to skim it out.
Hi all
My current phone has now died completely. So I'm using my old phone. I'm struggling to update it and have lost contacts. I'm not ignoring folk, it's just my old, lod phone is like 6 years old and can't deal with current technologie. Apologies in advance.
Never covered up Pebble dash (Rough cast) before. Took around 3 coats + the top coat to get it looking flatter. Still need to do the porch (top coat), tomorrow then job doen.
My little girl. She does like her picture taken lol.
Small Job for a family member. Let my weekend begin.
Job completed today, over the past 4 days. Didn't take before pictures, as I forgot. Hurting to say the least. Small job to do tomorrow, then I'm off for the weekend.
Started this job at the beginning of this week and Finnished today. Not done a round window for years and it turned out better than I expected. The only thing I didn't do, was the media wall, just skimmed the back parts of the walls inside the media wall.
Small job completed today. Used render mesh to reinforce this wall, Thistle Bonded and skimmed. A small job, but time consuming.
Smashing jobs out at the minute. Customer extremely happy with how this wall turned out. I do like to have happy customer's 😊
Render & Set done in a bathroom this weekend.not done this type of work for a while, but I'm happy with how it turned out.
Job completed today in Biddulph. Need a rest after this weekend, been non-stop.
Now taking bookings for March. There is only 2 weeks left, so be sure to book soon. 😃😃😃
Another job completed today. Boarded this out last week and Finnished off today after the plumber had been and done his bits. Another happy customer.
Been a busy few days getting this done. Absolutely dead on my feet. But, a happy customer. Plasterboarded and skimmed
Can't believe this wall was this far out of level.
This job ran over a day. But, I needed to get it right, to look decent. Although I didn't see the customers before I left, they seemed very happy with the work.
February is nearly fully booked. Only a few spaces available, then I will be booking for March.
My new email address:
[email protected]
Biddulph Chatter
Free for someone in desperate need of puppy food. 10 x Pedigree pouches and around 2.3kg of kibble food (Tails.com). No longer needed as my puppy is on a raw diet.
Free for someone in desperate need of puppy food. 10 x Pedigree pouches and around 2.3kg of kibble food (Tails.com). No longer needed as my puppy is on a raw diet.
Back at it. It's been a long time off, due to Covid and other issues. But I'm back, and ready to go. Happy 2024 to everyone.
Happy new year to everyone that I know. Friends, family and customers. Its been such an amazing year with ups and downs. The next 2 years will be though due to interest rates. Hopefully we will get through it and survive, but that will only happen with the continued support with you guys. I wish you all the best in 2024. Love to you all xx
A new business email address coming soon. This keeps things easier for me. I'll keep you updated.
Merry Christmas to everyone and a happy new year. Just wanted to say a massive thank you to all my customers old and new for using my services. I hope that 2024 will be as gd as this year. Thanks again.
Click here to claim your Sponsored Listing.
Videos (show all)
Category
Contact the business
Website
Address
Biddulph
32 Highfield Road West
Biddulph, ST86HB
we are an Building company, Based in the Staffordshire Moorlands
Biddulph, ST8
Groundwork’s and Excavation Contractors, covering all aspects of groundwork’s and excavations
Biddulph, ST8
Here at G.C.L we provide a high standard of workmanship throughout the construction and landscaping industry!
Kingsfield Road
Biddulph, ST8 6DR
Specialising in residential work including refurbishments, re-models, Kitchens & Bathrooms, Barn Conversions, and Extensions.