Kerr Carpentry and building
Carpentry, Bespoke Joinery, Kitchens, Building, Painting and Decorating and lots more.
๏ฟฝ No obli
Our latest project over in Holt, after a few hiccups along the way, none of which were out of our control, we have now completed this job with very happy customers. New twin en suite bathroom extension, finished to a very high standard. Have a look for yourself.
Please feel free to get in contact with us regarding any building/Carpentry work.
Extension commencing in Holt.
Keep your eyes peeled.
Feel free to contact us with any building work.
From new to old.
Full cladding.
Sofits and fascias all around.
New drainage around the front of the house.
Re rendered fronts.
Blocked up gable end and re rendered.
New step and slabbed.
80sqm of patio taken up and relayed.
All ready for the painter.
Correct way to lay a patio.
Primed, full bed cement.
Incorrect laying of patio.
Meaning we're having to pull it all up, Around 90sqm. Dig out and then re lay the entire patio.
We have been so busy but here is the latest project started in Frome.
Keep your eyes peeled for some updates.
Last few jobs after Christmas.
Insulated plasterboard.
Plasterboard.
Insulation in floors and ceiling.
New door in old stud wall.
New loft hatch.
Fully painted.
We still have availability this year, and space in the next few weeks.
Please don't hesitate to get in contact with us.
All of us here at Kerr Carpentry and building would like to wish all of our customers, past and present, a very merry Christmas and a happy new year. Thank you to everybody for all of your support throughout 2023. Its been a great year and we are very much looking forward to 2024 ๐ ๐
Little job over in Coleford. Returning customer!!
Plastering of old wall.
New lvt flooring in kitchen.
New lvt flooring throughout hallway.
New skirting.
Please don't hesitate to get in touch with any Carpentry and Building projects.
Our previous job in Totterdown Bs3.
Fully finished for our retuning client.
Knock through with structural steel for bifold doors.
Re rendered to match in.
Lath and plaster ceilings removed.
Insulated.
Floor joists repaired.
Tanking on outer walls.
Self levelling of kitchen floor.
Re fitted kitchen with appliances.
New Cork flooring in kitchen.
New spot lights.
Bespoke made cabinets to hide appliances
Bespoke made larder unit.
New plasterboard all round.
Plastered.
New skirting and architrave.
Fully decorated
Please don't hesitate to get in touch with any Carpentry/Building projects.
๐ ๐
It's all comming together on our job in Totterdown BS3.
Doors all tyrolean rendered.
Built in units, one to hide all the fridge washing machine and boiler. One as a larder unit.
New skirting and architrave all around.
Kitchen re fitted.
New Cork flooring.
Fully re plastered.
Tiles and paint left to do.
Please don't hesitate to get in contact with us regarding any building/Carpentry projects big or small.
Final touches in our Totterdown BS3 job.
Please don't hesitate to get in touch with us regarding any Carpentry/building projects.
Well that's our new job well underway in totterdown bs3.
Structural knock through with new supporting steel.
Re render outside.
New brick pillar to hold steel.
Re built brickwork above steel.
Old Ceilings down in lounge and kitchen.
New boarding throughout.
Full re plaster throughout.
New spotlights for the kitchen and utility room.
Level out kitchen and add new flooring.
New built in cupboards for utility room.
All signed off by building control.
Please don't hesitate to get in touch with us for any Carpentry and Building projects.
Trowbridge all finished and passed over to the customer.
That's our Trowbridge job completed and we will let you see for yourself.
Conservatory to extension with added lean too.
Feel free to get in touch with us with any upcomming projects.
#
It's all coming together on the Trowbridge extension.
All plastered out.
All Insulated.
Self level floor.
Media wall including fire.
2nd fix electrics.
Shelves around the house with rostered in LED strips.
Patio added.
Few small bits to finish up including a Lean too, flooring and skirting.
Please don't hesitate to get in touch.
๐ Trowbridge update ๐
Velux window installation x 3.
All roof tiles finished.
Dry Ridge installed.
Sofits and facias in matt Black.
Stine work fully completed.
Leadwork flashing fitted.
Drainage with 3 x New outlet pots.
Patio going back down.
Media wall being framed out.
Insulated roof space.
Please don't hesitate to get in touch with any building work.
๐ Trowbridge extension update ๐
Block work up to wall plate.
Outer skin of faced stone 90% complete.
Box steels added above old opening.
Glulam 10 layer ridge beam installed.
Catnic over opening for bifold doors.
Wall plates installed
One side of the roof cut in.
Keep your eyes peeled for more updates, feel free to get in touch.
๐Trowbridge update ๐
Test hole dug for inspection of footings for building control. All signed off.
Complete rip down of old conservation.
Floor taken up back to slab.
All taken back to brick work.
Few walls rebuilt.
Inner skin of blocks 90% up ready for IG beam.
Insulated bottom half of cavity.
First fix electrics going in.
We are ready to begin working our magic on this house in Trowbridge. Unfortunately due to a house fire, this conservatory suffered lots of damage
Planning has been accepted to rebuild as an extension with a solid roof.
Keep your eyes peeled for more updates.
We have been super busy lately, here are a few pictures of what we have been up to.
New built-in wardrobes with rattan doors.
Newly plastered ceilings and walls.
Full paint throughout.
Repoint with lime section of wall.
Please do feel free to get in touch for all your Carpentry/building needs.
Walk around video of the BS5 extension
That's a wrap on the BS5 extension.
All finished to a very high standard and I'm sure you will agree its a stunning open space ready for the family to enjoy.
This one was start to finsh.
Full groundwork.
New drainage.
Brickwork.
Roof with new rooflites.
All ground floor walls removed.
Steels installed.
New floor throughout.
New plasterboard.
Plastering throughout.
Opening up fire place.
New stair case with oak handrail and spindles.
New skirting and architrave.
New herringbone floor.
New kitchen.
Built on cupboards.
Under stairs storage.
Patio.
New electrics
New plumbing
Been a labour of love this one but absolutely delighted how its come out.
Feel free to give us a message about any future projects.
Bs5 extension update:
Kitchen fitted.
Skirting and architrave.
Understairs storage.
Feel free to get in contact
We have been super busy so here is a update of the extension in bs5.
Fully bricked up.
Box gutter installed.
Rooflites installed.
Tiled and lead.
Sofits and facias.
Drainage for rain water.
New insulated floor.
New doors and windows.
New stud walls.
New plasterboard all around.
Fire board steels
Plaster.
Under floor hearing installed.
New herringbone flooring.
New stair case.
All work has been signed off by building control.
Ready for kitchen, skirting, architrave, understairs storage, radiators, 2nd fix electrics and patio.
Feel free to get in touch about any future projects.
Extension update the weather has been on our side and we have been very busy.
All walls demolished, pillars all toothed in to building and pads built for steels to sit on, steels installed. Infilled all above steels. Props taken down for building to sit on the steels. All signed off by building control tickโ
๏ธ.
First fix electrics going in. Roof on and sheeted ready for tiles. Brick work all going up for the extension.
Please feel free to get in touch with and Building/Carpentry projects.
We have been mega busy with our new project.
Here is a little update on progress.
All ground and drainage works completed and signed off by building control. New soil stack in new position. New retaining wall and pad for patio to follow. Up to damp proof on the extension. Insulated Concrete slab in. All inside walls have been removed. Pillars built inside for steels to sit on. Ready for the removal of outer walls and steels to arrive.
We have space in our calendar for 2023 so please do get in touch for all your Carpentry/ building work
Click here to claim your Sponsored Listing.
Videos (show all)
Category
Contact the business
Website
Address
Frome
BA111
Frome
We are a team of enthusiastic general builders that specialise in all areas of interior and exterior
Frome
Frome, BA11
Dunbar Building Services trades in all aspects of building; from steelworks extensions, steelworks and roofing to fine touches of carpentry including kitchen and bathroom refurbis...
Frome, BA111
* Extensions * Renovations/Alterations * Patios and Driveways * Groundworks * Fencing
Marsh Farm, Blatchbridge
Frome, BA115EL
West Country Tiling Company are specialist roofing contractors from Somerset, South West England
Frome, BA112BT
Frome - Somerset & Surrounding areas Driveways Patios Drop kerbs Groundworks City & Guilds qualified ยฃ10,000,000 Insurance Street works accredited
Plot 14b, Forest Of Dean Business Estate, Stepbridge Road
Frome, GL168PJ
C&R Groundworks are a Gloucestershire Based Groundworks company with over 15 years Experience.
Frome
Frome, BA111
Fully qualified bricklayer with 11 years experience in the buidling trade Brickwork Stonework Patios