Picam-Apex Construction Limited

We are a construction company whose expertise is to design, build, renovations and quotations

Photos from Picam-Apex Construction Limited's post 12/09/2024

Proposed Four bedroom mansionette in Juja
Total cost 9.25M

CALL OR WHATSAPP @ HTTPS://WA.ME/254790893021

Foundation:920,000
Groundfloor walling:450,000
Suspended slab 1: 710,000
Firstfloor walling 450,000
Suspended slab 2: 720,000
Parapet 1 and walling 3 -600,000
Install steel doors and windows :350,000

Finishes
plaster internal,external:700,000
Tiling 600,000
Skimming/wall master:800,000
Electricals and plumbing-450,000
Wardrobes and kitchen cabinets-550,000
Gypsum-500,000
Terrazo-300,000
Painting internal and external-550,000
Window panes-120,000
Wooden doors,frames -300,000

CALL OR WHATSAPP @ HTTPS://WA.ME/254790893021

Photos from Picam-Apex Construction Limited's post 09/07/2024

5.8m- FOR COMPLETE STRUCTURE
6.7M FOR FINISHING

TOTAL-12.5M

Call or WhatsApp PETER @
HTTPS://WA.ME/254790893021

4 BEDROOM MAISSIONETTE STRUCTURE COMPLETE @ GREENVALLEY ESTATE KAMAKIS
TOTAL COST-12.5M

Call or WhatsApp Peter @
HTTPS://WA.ME/254790893021
For.
1.Design
2.Building
3.Design and build
4.Consultation

Photos from Picam-Apex Construction Limited's post 09/07/2024

BQ FOR 4 BEDROOM COMPLETE STRUCTURE MATERIAL AND LABOUR

Structure -4.5M
Finishing-6.5M

CALL OR WHATSAPP @ HTTPS://WA.ME/254790893021

A.FOUNDATION MATERIAL ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.2,100 feet Foundation stones (4 courses) - 94,500
2.52 Tons Ballast-104,000
3.38 Tons Sand-76,000
4.182 Bags of Cement-145,600
5.5 Hoop Iron -14,000
6.1 Binding wire -3,800
7.5 Rolls A66 B.R.C -27,500
8.15 KG Nails -3,000
9.Props -6,000
10.10 Blades-1,200
11.48 D12 RE-BARS-74,880
12.16 D8 RE-BARS-11,680
13.2 Litre Anti-Termite-5,000
14.Filling Hardcore-107,500
15.6 Rolls Damp Proof Membrane-15,000
16.1 bag Lime-300
TOTAL FOUNDATION MATERIALS-689,960

B.FOUNDATION LABOUR ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.Setting out (Profile and Measuring)-10,000
2.Excavation (Trench & Column Pits)-32,970
3. Fdn Footing & Column Bars-20,000
4. Fdn Trench Concrete & Column Pits-28,000
5.Fdn Walling-155,250
6.Column Formwork-14,600
7.Column Concrete-16,000
8.Hardcore Fill and Compaction-25,000
9.Slab Formwork,DPM,BRC & Anti-Termite-6,000
10.Plumbing Point Pipework-8,000
11.G.F Slab Concrete-28,000
12.Curing-10,000
13.Plant(Vibrator & Roller)-7,000
TOTAL FDN LABOUR-360,820

B.GROUND FLOOR WALLING MATERIAL ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.2,600 pcs Machine Cut Stones-117,000
2.17 Tons Sand -34,000
3.6 Tons Ballast-12,000
4.70 Bags of Cement-56,000
5.35 D12 -54,600
6.24 D8-17,520
7.5 Hoop Iron-14,000
8.15kg Nails-3,000
9.Damp Proof Course-4,000
TOTAL G.F MATERIAL-312,120

B.G.F WALLING LABOUR ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.G.F Walling-131,950
2.Column Formwork-18,200
3.Column Concrete-20,000
4.Curing-10,000
5.Plant (Vibrator)-2,000
TOTAL G.F WALLING-182,150

C.SUSPENDED SLAB MATERIAL ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.30 Tons Sand-60,000
2.38 tons Ballast-76,000
3.145 Bags of Cement-116,000
4.Steel Bars (D16, D12, D8)-302,000
5.100kg Nails-20,000
6.3 Binding Wire-11,400
7.Plumbing-18,000
8.Electrical-20,000
9.4 DPM-10,000
10.10 Blades-1,200
TOTAL SLAB MATERIALS-634,600

SUSPENDED SLAB LABOUR ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.Formwork Timber-90,300
2.Formwork Labour-155,000
3.Steel Fixing-30,000
4.Plumbing Point Pipework-22,000
5.Electrical Point Pipework-35,000
6.Slab Concrete-35,000
7.Curing-10,000
TOTAL SLAB LABOUR-377,300

D.UPPER FLOOR WALLING MATERIAL ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.2,650 pcs Machine Cut Stones-119,250
2.18 Tons Sand -36,000
3.6 Tons Ballast-12,000
4.70 Bags of Cement-56,000
5.35 D12 -54,600
6.24 D8-17,520
7.5 Hoop Iron-14,000
8.15kg Nails-3,000
TOTAL G.F MATERIAL-312,370

U.F WALLING LABOUR ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.G.F Walling-139,200
2.Column Formwork-20,100
3.Column Concrete-22,000
4.Curing-10,000
5.Plant (Vibrator)-2,000
TOTAL G.F WALLING-193,200

E. GUTTER BEAM MATERIAL ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.30 Tons Sand-60,000
2.25 Tons Ballast-50,000
3.105 Bags of Cement-84,000
4.2 Binding Wire-7,600
5.Steel Bars-156,960
6.Plumbing-18,000
TOTAL GUTTER MATERIALS-376,560

GUTTER BEAM LABOUR ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.Formwork-82,100
2.Steel Fixing-30,000
3.Curing-10,000
4.Gutter Plaster-42,300
5.Plant (Vibrator)-4,000
6.Water Proffing-60,800
TOTAL GUTTER BEAM LABOUR-229,200

F.ROOF MATERIAL ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.TIMBER (2X2,3X2,4X2)-240,000
2.VERSATILE MRM IRON SHEETS-377,600
3.Nails-25,000
TOTAL ROOF MATERIALS-642,600

ROOF LABOUR ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.Roofing -130,000
2.Bladering-30,000
TOTAL ROOF LABOUR-160,000

TOTAL MATERIALS & LABOUR ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM-
11M
structure -4.5M
Finishing-6.5M

For *Architectural drawings,
*Structural drawings,
*Building construction,
*Consultation &
*BQ call or WhatsApp
HTTPS://WA.ME/254790893021
Regards: Arch.P.Mwatha of Picam-Apex Construction Limited

Follow our page Picam-Apex Construction Limited
https://www.facebook.com/picamapexconstructionltd

Photos from Picam-Apex Construction Limited's post 20/02/2024

6 BEDROOM MAISSINETE COMPLETE STRUCTURE MATERIAL AND LABOUR @ 5.2m JUJA MASTORE
CALL OR WHATSAPP @ HTTPS://WA.ME/254790893021

Photos from Picam-Apex Construction Limited's post 12/02/2024

BQ FOR 4 BEDROOM COMPLETE STRUCTURE MATERIAL AND LABOUR
CALL OR WHATSAPP @ HTTPS://WA.ME/254790893021

A.FOUNDATION MATERIAL ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.2,100 feet Foundation stones (4 courses) - 94,500
2.52 Tons Ballast-104,000
3.38 Tons Sand-76,000
4.182 Bags of Cement-145,600
5.5 Hoop Iron -14,000
6.1 Binding wire -3,800
7.5 Rolls A66 B.R.C -27,500
8.15 KG Nails -3,000
9.Props -6,000
10.10 Blades-1,200
11.48 D12 RE-BARS-74,880
12.16 D8 RE-BARS-11,680
13.2 Litre Anti-Termite-5,000
14.Filling Hardcore-107,500
15.6 Rolls Damp Proof Membrane-15,000
16.1 bag Lime-300
TOTAL FOUNDATION MATERIALS-689,960

B.FOUNDATION LABOUR ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.Setting out (Profile and Measuring)-10,000
2.Excavation (Trench & Column Pits)-32,970
3. Fdn Footing & Column Bars-20,000
4. Fdn Trench Concrete & Column Pits-28,000
5.Fdn Walling-155,250
6.Column Formwork-14,600
7.Column Concrete-16,000
8.Hardcore Fill and Compaction-25,000
9.Slab Formwork,DPM,BRC & Anti-Termite-6,000
10.Plumbing Point Pipework-8,000
11.G.F Slab Concrete-28,000
12.Curing-10,000
13.Plant(Vibrator & Roller)-7,000
TOTAL FDN LABOUR-360,820

B.GROUND FLOOR WALLING MATERIAL ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.2,600 pcs Machine Cut Stones-117,000
2.17 Tons Sand -34,000
3.6 Tons Ballast-12,000
4.70 Bags of Cement-56,000
5.35 D12 -54,600
6.24 D8-17,520
7.5 Hoop Iron-14,000
8.15kg Nails-3,000
9.Damp Proof Course-4,000
TOTAL G.F MATERIAL-312,120

B.G.F WALLING LABOUR ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.G.F Walling-131,950
2.Column Formwork-18,200
3.Column Concrete-20,000
4.Curing-10,000
5.Plant (Vibrator)-2,000
TOTAL G.F WALLING-182,150

C.SUSPENDED SLAB MATERIAL ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.30 Tons Sand-60,000
2.38 tons Ballast-76,000
3.145 Bags of Cement-116,000
4.Steel Bars (D16, D12, D8)-302,000
5.100kg Nails-20,000
6.3 Binding Wire-11,400
7.Plumbing-18,000
8.Electrical-20,000
9.4 DPM-10,000
10.10 Blades-1,200
TOTAL SLAB MATERIALS-634,600

SUSPENDED SLAB LABOUR ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.Formwork Timber-90,300
2.Formwork Labour-155,000
3.Steel Fixing-30,000
4.Plumbing Point Pipework-22,000
5.Electrical Point Pipework-35,000
6.Slab Concrete-35,000
7.Curing-10,000
TOTAL SLAB LABOUR-377,300

D.UPPER FLOOR WALLING MATERIAL ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.2,650 pcs Machine Cut Stones-119,250
2.18 Tons Sand -36,000
3.6 Tons Ballast-12,000
4.70 Bags of Cement-56,000
5.35 D12 -54,600
6.24 D8-17,520
7.5 Hoop Iron-14,000
8.15kg Nails-3,000
TOTAL G.F MATERIAL-312,370

U.F WALLING LABOUR ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.G.F Walling-139,200
2.Column Formwork-20,100
3.Column Concrete-22,000
4.Curing-10,000
5.Plant (Vibrator)-2,000
TOTAL G.F WALLING-193,200

E. GUTTER BEAM MATERIAL ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.30 Tons Sand-60,000
2.25 Tons Ballast-50,000
3.105 Bags of Cement-84,000
4.2 Binding Wire-7,600
5.Steel Bars-156,960
6.Plumbing-18,000
TOTAL GUTTER MATERIALS-376,560

GUTTER BEAM LABOUR ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.Formwork-82,100
2.Steel Fixing-30,000
3.Curing-10,000
4.Gutter Plaster-42,300
5.Plant (Vibrator)-4,000
6.Water Proffing-60,800
TOTAL GUTTER BEAM LABOUR-229,200

F.ROOF MATERIAL ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.TIMBER (2X2,3X2,4X2)-240,000
2.VERSATILE MRM IRON SHEETS-377,600
3.Nails-25,000
TOTAL ROOF MATERIALS-642,600

ROOF LABOUR ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM
1.Roofing -130,000
2.Bladering-30,000
TOTAL ROOF LABOUR-160,000

TOTAL MATERIALS & LABOUR ESTIMATES FOR 4 BEDROOM MAISSIONETE PITCHED ROOF WITH GUTTER BEAM-
4,540,880

For *Architectural drawings,
*Structural drawings,
*Building construction,
*Consultation &
*BQ call or WhatsApp
HTTPS://WA.ME/254790893021
Regards: Arch.P.Mwatha of Picam-Apex Construction Limited
YOUR FUTURE HOME TODAY

Follow our page Picam-Apex Construction Limited
https://www.facebook.com/picamapexconstructionltd

Photos from Picam-Apex Construction Limited's post 30/06/2023

HTTPS://WA.ME/254790893021

BQ FOR 4 BEDROOM MAISSIONATE
HTTPS://WA.ME/254790893021
A.)FOUNDATION
1.) Setting out - 10,000
2.) Site Clearance & excavation - 80,400
3.) Strip fdn reinforced concrete - 132,400
4.) Fdn stone walling - 220,100
5.) Column reinforced concrete - 102,400
6.) Filling and murram - 90,300
7.) BRC - 30,000
8.) DPM - 10,000
9.) Slab concrete & Formwork - 210,340
10.) Curing - 10,000
TOTAL FOUNDATION ESTIMATES - 895,940

B.)GROUND FLOOR
1.) Ground floor stone walling - 280,050
2.) Column reinforced concrete & Formwork - 120,040
3.) Suspended reinforced concrete & Formwork - 765,080
4.) Curing - 10,000
5.) Doors - 155,400
6.) Windows - 125,100
7.) Ceiling- 235,200
8.) Medium end finishes - 1,020,000
TOTAL GROUND FLOOR ESTIMATES - 2,710,870

C.) 1ST FLOOR & ROOF
1.) 1st floor stone walling - 180,620
2.) Ring beam reinforced concrete - 76,700
3.) Gable stone walling - 108,500
4.) Roofing - 650,800
5.) Doors - 145,100
6.) Windows - 135,600
7.) Ceiling - 185,200
8.) Medium end finishes & railings - 930,750
TOTAL 1ST FLOOR & ROOF ESTIMATES - 2,413,270

D.) TOTAL PLUMBING ESTIMATES -250,000

E.) TOTAL ELECTRICAL ESTIMATES - 310,000

Total BQ Estimates - 6,580,080

For *Architectural drawings,
*Structural drawings,
*Building construction,
*Consultation &
*BQ call or WhatsApp
HTTPS://WA.ME/254790893021
Regards: Arch.P.Mwatha of Picam-Apex Construction Limited
YOUR FUTURE HOME TODAY

Follow our page Picam-Apex Construction Limited
https://www.facebook.com/picamapexconstructionltd
For architectural, structural and BQ
4 bedroom maissionate
Sunken lounge
Dining
Kitchen with Pantry
Guests bedroom
Master bedroom with walk in closet and master bath
Study room
Cloakroom
All bedrooms ensuite.
Call us or WhatsApp today.
HTTPS://WA.ME/254790893021
We design & build your future today

Photos from Picam-Apex Construction Limited's post 14/06/2023

BQ FOR 3 BEDROOM MAISSIONATE
HTTPS://WA.ME/254790893021
(A.) FOUNDATION MATERIAL ESTIMATE SCHEDULE
1. FOUNDATION STONES 1,800 @ 45 = 81,000
2. BALLAST (1 TIPPER = 15 TONS) 26 TONS @ 2,000 = 52,000
3. SAND (1 TIPPER =15 TONS) 22 TONS @ 2,000 = 44,000
4. CEMENT 134 @ 650 = 87,100
5. BARBED WIRE 1 ROL L @ 3,800 = 3,800
6. BINDING WIRE 1 ROLL @ 4,000 = 4,000
7. A66 BRC THREE 48M ROOLS @ 6,000 = 18,000
8. NAILS 18KG @ 200 = 3,600
11. STEEL NAILS 3 @ 300 = 900
12. 25 PROPS @ 250 = 6,250
13. 10 BLADES @ 120 = 1,200
14. D12 STEEL RE-BARS @ 1,450 = 4,350
15. D10 STEEL RE-BARS (STRIP FDN) @ 1,050 = 42,000
16. D8 STEEL RE-BARS @ 750 = 1,500
17. 2 liters RENTOKIL ANTI-TERMITE GLADIATOR @ 2,000 = 4,000
18. FILLING HARDCORE @ 70,000
19. 2 DPM @ 2,500 = 5,000
20. LIME @ 300
21. COTTON REMOVAL @ 80,000
TOTAL = 509,000 KES
OTHER ITEMS
1. WHEELBARROW @ 4,500
2. DRUMS 2 @ 1,500 = 3,000
3. SPADES 3 @ 600 =800
4. LEVEL 1 @ 2,000 = 2,000
5. BUCKETS 5 @ 250 = 1,250
6. Site House = 40,000
TOTAL = 52,050 KES
(B.)G.F WALL STRUCTURE MATERIAL ESTIMATE SCHEDULE
1. MACHINE CUT STONES 1,700 @ 48 = 81,600
2. SAND 14 TONS @ 2,000 = 28,000
3. CEMENT 54 @ 650 = 35,100
4. D12 STEEL RE-BARS 3 @ 1,450 = 4,350
5. D8 STEEL RE-BARS 3 @ 750 = 2,250
6. HOOP IRON 4 @ 3,300 = 13,200
7. NAILS 8KG @ 200 = 1,600
TOTAL=166,100 KES
(C.)SUSPENDED SLAB MATERIAL ESTIMATE SCHEDULE
1. SAND 15 TONS @ 2,000 =30,000
2. BALLAST 25 TONS @2,000 = 50,000
3. CEMENT 96 Bags @ 650 = 62,400
4. D16 STEEL RE-BARS 8 @ 2,450 =19,600
5. D12 STEEL RE-BARS 32 @ 1,450 = 46,400
6. D10 STEEL RE-BARS 133 @ 1050 = 139,650
7. D8 STEEL RE-BARS 30 @ 750 = 22,500
8. NAILS 70KG @ 200 = 14,000
9. BINDING 2 @ 4,000 = 8,000
10. PLUMBING = 10,000
11. ELECTRICAL = 15,000
12. DPM 3 @ 2,500 = 7,500
TOTAL = 425,050 KES
(D.) INTERIOR G.F MATERIAL ESTIMATE SCHEDULE
INTERIOR RENDER
1. SAND 22 @ 2,000 = 44,000
2. CEMENT 117 BAGS @ 650 = 76,050
3. LIME 2 @ 300 = 600
4. NAILS 10KG @ 200 = 2,000
5. FLASH DOOR
0.9X2.4 & FRAME 2 @ 7,000 = 14,000
0.8X2.4 & FRAME 2 @ 7,000 = 14,000
SUB-TOTAL = 150,650
6. STEEL DOOR
0.9X2.4 & FRAME 2 @ 14,000 = 28,000
1.2X2.4 & FRAME 1 @ 18,000 = 18,000
SUB-TOTAL = 46,000
7. STEEL WINDOWS
1.5X1.5 2 @ 7,500 = 15,000
1.5X1.5 (BAY) 2 @ 9,000 = 18,000
2X1.5 1 @ 10,000 = 10,000
0.6X1.5 4 @ 3,000 = 12,000
1X1.5 1 @ 4,000 = 4,000
0.6X0.9 1 @ 2,500 = 2,500
STAIR WINDOW 1 @ 10,000 = 10,000
SUB-TOTAL = 71,500
8. PAINT = 80,000
9. KIT FITTINGS = 75,000
10. PLUMBING = 70,000
11. ELECTRICAL = 100,000
12. WINDOW PAINT = 52,100
SUB-TOTAL = 377,100 KES
TOTAL = 645,250 KES
(E.) EXTERIOR FINISH MATERIAL ESTIMATE SCHEDULE
INTERIOR RENDER
1. SAND 15TONS @ 2,000 = 30,000
2. CEMENT 35 BAGS @ 650 = 22,750
3. LIME 2 @ 300 = 600
4. NAILS 10KG @ 200 = 2,000
5. PAINT = 86,000
TOTAL = 141,350 KES
(F.) U.F WALL STRUCTURE MATERIAL ESTIMATE SCHEDULE
1. MACHINE CUT STONES (9’’) 1,670 @ 48 =80,160
2. MACHINE CUT STONES (6’’) 200 @ 45 =9,000
3. SAND 15 TONS 2,000 =30,000
4. CEMENT 49 @ 650 =31,850
5. D12 STEEL RE-BARS 3 @ 1,450 =4,350
6. D8 STEEL RE-BARS 3 @ 750 =2,250
7. HOOP IRON 4 @ 3,300 =13,200
8. NAILS 8 KG 200 =1,600
SUB-TOTAL 172,410
PARAPET WALL
9. MACHINE CUT STONES (9’’) 300 @ 48 =14,400
10. MACHINE CUT STONES (6’’) 850 @ 45 =38,250
11. SAND 7.32 @ 2,000 =14,640
12. CEMENT 29 @ 650 =18,850
13. D12 STEEL RE-BARS 4 @ 1,450 =5,800
14. D10 STEEL RE-BARS 20 @ 1,050 =21,000
15. D8 STEEL RE-BARS 14 @ 750 =10,500
SUB-TOTAL = 123,440 KES
TOTAL = 295,850 KES
INTERIOR U.F MATERIAL FINISH ESTIMATE SCHEDULE
INTERIOR RENDER
1. SAND 17.15TONS @ 2,000 = 34,300
2. CEMENT 110 BAGS @ 650 = 71,500
3. LIME 2 @ 300 = 600
4. NAILS 10KG @ 200 = 2,000
5. FLASH DOOR
0.9X2.4 & FRAME 2 @ 4,500 = 9,000
0.8X2.4 & FRAME 2 @ 4,500 = 9,000
SUB-TOTAL = 18,000
6. STEEL DOOR
0.9X2.4 & FRAME 2 @ 12,000 = 24,000
SUB-TOTAL = 24,000
7. STEEL WINDOWS
1.5X1.5 1 @ 7,000 = 7,000
1.5X1.5 (BAY) 2 @ 9,000 = 18,000
0.6X1.5 4 @ 3,000 = 12,000
0.6X0.9 3 @ 2,500 = 7,500
STAIR WINDOW 1 @ 10,000 = 10,000
SUB-TOTAL = 54,500
8. PAINT = 60,000
9. WARDROBE FITTING = 70,000
10. PLUMBING = 90,000
11. ELECTRICAL = 80,000
12. WINDOW PAINT = 29,964
13. PVC CEALING = 87,500
TOTAL = 622,364
(G.) EXTERIOR U.F FINISH MATERIAL ESTIMATE SCHEDULE
EXTERIOR RENDER
1. SAND 18.8 TONS @ 2,000 = 37,600
2. CEMENT 48 BAGS @ 650 = 31,200
3. LIME 3 @ 300 = 900
4. NAILS 10KG @ 200 = 2,000
5. PAINT = 72,900
6. ROOFING = 125,000
TOTAL = 231,950 KES
TOTAL MATERIAL -3,185,464
The house have
(G.F) - spacious living room, kitchen with pantry, guest bedroom, cloakroom, small study, Entrance porch
(U.F) - master bedroom ensuite with balcony, other bedroom, Family Room, Terrace & Back porch.
For
*Architectural drawings,
*Structural drawings,
*Building construction,
*Consultation &
*BQ call or WhatsApp
HTTPS://WA.ME/254790893021
Regards: Arch.P.Mwatha of Picam-Apex Construction Limited
YOUR FUTURE HOME TODAY
Follow our page Picam-Apex Construction Limited
https://www.facebook.com/picamapexconstructionltd

Photos from Picam-Apex Construction Limited's post 17/03/2022

2 BEDROOM FLAT ROOF BUNGALOW
Minimum plot size-30x60
Its also has
Spacious living room
Dining
Kitchen
One bedroom ensuite
Common toilet
Spacious parking for 3 cars

WhatsApp HTTPS://WA.ME/254790893021 for more information

You can Also join our company WhatsApp group @
https://chat.whatsapp.com/Gqw3Ol3HSpzFSytvQ0X4pj

Regards:PICAM-APEX CONSTRUCTION LTD
Arch.P.Mwatha

Photos from Picam-Apex Construction Limited's post 17/03/2022

2 BEDROOM BUNGALOW
Minimum plot size
30x60
WhatsApp HTTPS://WA.ME/254790893021
For more information
Also you can join our company group on WhatsApp
https://chat.whatsapp.com/Gqw3Ol3HSpzFSytvQ0X4pj

24/12/2021

*🎄🎄🎆Merry Christmas to all our supporters, followers, colleagues, friends and Clients.
*Thank you for your support.
*Let's continue to build this country while at the same time
preserving our environment.
PICAM-APEX CONSTRUCTION LIMITED LOVES YOU ALL.
*Any question concerning design, construction or BQ feel
Free to contact us @
HTTPS://WA.ME/254790893021
*HAPPY HOLIDAYS 🎉🎉🎈🧨

Photos from Picam-Apex Construction Limited's post 24/12/2021

BQ FOR 3 BEDROOM FLAT-ROOF MAISSIONATE
HTTPS://WA.ME/254790893021
A.)FOUNDATION
1.) Setting out - 10,000
2.) Site Clearance & excavation - 80,400
3.) Strip fdn reinforced concrete - 135,800
4.) Fdn stone walling - 180,600
5.) Column reinforced concrete - 132,400
6.) Filling and murram - 89,300
7.) BRC - 60,000
8.) DPM - 6,600
9.) Slab concrete & Formwork - 230,890
10.) Curing - 10,000
TOTAL FOUNDATION ESTIMATES - 935,990 Kes

B.)GROUND FLOOR
1.) Ground floor stone work - 222,340
2.) Column reinforced concrete & Formwork - 128,040
3.) Suspended reinforced concrete & Formwork - 720,050
4.) Curing - 10,000
5.) Doors - 133,800
6.) Windows - 195,200
7.) Medium end finishes - 590,000
TOTAL GROUND FLOOR ESTIMATES - 1,999,430 Kes

C.) 1ST FLOOR & ROOF SLAB
1.) 1st floor stone walling - 252,500
2.) Suspended reinforced concrete & Formwork - 698,230
3.) Doors - 142,250
4.) Windows - 180,600
5.) Medium end finishes & railings - 697,130
TOTAL 1ST FLOOR & ROOF SLAB ESTIMATES - 1,970,710 Kes

D.) Parapet Walling And Stairs Roofing -250,000 Kes

E.) Parapet Walling And Stairs Roofing Finishes-150,000 Kes

F.) TOTAL PLUMBING ESTIMATES -210,000 Kes

G.) TOTAL ELECTRICAL ESTIMATES - 300,000 Kes

Total BQ Estimates - 5,816,130 Kes
Call/WhatsApp HTTPS://WA.ME/254790893021
The house has:
GROUND FLOOR
-spacious living room
-kitchen with pantry
-Dining room
-guest bedroom ensuite
-cloakroom.
-Laundry
‐Entrance porch & Back porch
UPPER FLOOR
-master bedroom ensuite with balcony
-other bedroom ensuite with balcony-Open terrace
It can also be converted to 4 bedroom maissionate for the extra bedroom to take the space for open terrace on the upper floor
For *Architectural drawings,
*Structural drawings,
*Building construction,
*Consultation &
*BQ
call or WhatsApp
HTTPS://WA.ME/254790893021
Regards: -Picam-Apex Construction Limited
-Arch.P.Mwatha
YOUR FUTURE HOME TODAY.

Photos from Picam-Apex Construction Limited's post 18/12/2021

BQ FOR 3 BEDROOM MAISSIONATE
HTTPS://WA.ME/254790893021
A.)FOUNDATION
1.) Setting out - 10,000
2.) Site Clearance & excavation - 80,400
3.) Strip fdn reinforced concrete - 92,300
4.) Fdn stone walling - 120,300
5.) Column reinforced concrete - 86,400
6.) Filling and murram - 72,300
7.) BRC - 60,000
8.) DPM - 6,600
9.) Slab concrete & Formwork - 180,340
10.) Curing - 10,000
TOTAL FOUNDATION ESTIMATES - 718,640

B.)GROUND FLOOR
1.) Ground floor stone walking - 259,050
2.) Column reinforced concrete & Formwork - 98,040
3.) Suspended reinforced concrete & Formwork - 509,050
4.) Curing - 10,000
5.) Doors - 157,430
6.) Windows - 225,900
7.) Medium end finishes - 517,000
TOTAL GROUND FLOOR ESTIMATES - 1,776,470

C.) 1ST FLOOR & ROOF
1.) 1st floor stone walling - 187,620
2.) Ring beam reinforced concrete - 68,700
3.) Gable stone walling - 43,500
4.) Roofing - 587,800
5.) Doors - 118,120
6.) Windows - 150,600
7.) Medium end finishes & railings - 513,750
TOTAL 1ST FLOOR & ROOF ESTIMATES - 1,670,090

D.) TOTAL PLUMBING ESTIMATES -165,000

E.) TOTAL ELECTRICAL ESTIMATES - 280,000

Total BQ Estimates - 4,610,200
The house have spacious living room, kitchen with pantry, guest bedroom ensuite, cloakroom, small study, master bedroom ensuite with balcony, other bedroom ensuite with balcony,Entrance porch & Back porch.

For *Architectural drawings,
*Structural drawings,
*Building construction,
*Consultation &
*BQ call or WhatsApp
HTTPS://WA.ME/254790893021
Regards: Arch.P.Mwatha of Picam-Apex Construction Limited
YOUR FUTURE HOME TODAY

Photos from Picam-Apex Construction Limited's post 16/12/2021

*4 BEDROOM BUNGALOW 155m3
*Spacious lounge
*Dining
*Kitchen
*Laundry

For architectural, structural,BQ & building needs
Call or WhatsApp HTTPS://WA.ME/254790893021

-Fdn stones 1620 @ 30=48,600
-Ballast 50 tons @2,000=100,000
-Sand 120 tons @2,060 =247,200
-Cement 400 bags @ 550 =220,000
-DPM 3 Rolls @ 2,200 = 6,600
-BRC 4 Rolls 15,000= 60,000
-Marrum 15 tons @ 1,500 =22,500
-D12 40 pcs @ 1,020 = 40,800
-D8 25 PCs @ 520 = 13,000
-Binding wire 25kgs @ 150 = 3,750
-Anti-termite gladiator 4 litres @ 1,500= 6,000
-Machine cut stones 2,800 @ 25 = 70,000
-Timber (6×1) 1000 fts @ 30 = 30,000
-Timber (2×2) 4000 fts @ 25 = 100,000
-Timber (4×2) 2500 fts @ 45 = 112,500
-Nails 180 kg @ 150 = 27,000
-Hip iron 4 rolls @ 3,000 = 12,000
-Iron Sheets 350 m @ 800 = 280,000
-Ridges 65 pcs @ 550 = 35,750
-Doors -wooden 8 @ 4,500 = 36,000
-Steel doors 2 @ 10,000 =20,000
-Main steel door 1 @ 15,000 =15,000
-Windows all =130,000
-Gutters & accessories = 45,000
-Fascia Board (8×1) 450 fts @ 70 = 31,500
-Tiles 123 pcts @ 1,000 = 123,000
-Paint 55 litres @ 2,000 = 110,000
-Wood preservative 20 litres @ 700 = 14,000
-Plumbing = 60,000
-Electrical = 110,000

Total Materials - 2,130,200
Labour - Inbox

For architectural, structural,BQ & building needs
Call or WhatsApp HTTPS://WA.ME/254790893021

16/12/2021

4 bedroom maissionate
(Gf)
*Guests bedroom
*Sucken Lounge
*Dining
*Kitchen with Pantry
*Laundry
(Uf)
*Master ensuite and walk in closet and balcony
*2 other bedrooms all ensuite and each having a balcony
*Open terrace
(Basement)
*Family entertainment
*Tv room
*Office
For architectural structural and BQ call or WhatsApp
HTTPS://WA.ME/254790893021

Photos from Picam-Apex Construction Limited's post 16/12/2021

*4 BEDROOM BUNGALOW 155m3
*Spacious lounge
*Dining
*Kitchen
*Laundry
Call or WhatsApp @ HTTPS://WA.ME/254790893021

-Fdn stones 1620 @ 30=48,600
-Ballast 50 tons @2,000=100,000
-Sand 120 tons @2,060 =247,200
-Cement 400 bags @ 550 =220,000
-DPM 3 Rolls @ 2,200 = 6,600
-BRC 4 Rolls 15,000= 60,000
-Marrum 15 tons @ 1,500 =22,500
-D12 40 pcs @ 1,020 = 40,800
-D8 25 PCs @ 520 = 13,000
-Binding wire 25kgs @ 150 = 3,750
-Anti-termite gladiator 4 litres @ 1,500= 6,000
-Machine cut stones 2,800 @ 25 = 70,000
-Timber (6×1) 1000 fts @ 30 = 30,000
-Timber (2×2) 4000 fts @ 25 = 100,000
-Timber (4×2) 2500 fts @ 45 = 112,500
-Nails 180 kg @ 150 = 27,000
-Hip iron 4 rolls @ 3,000 = 12,000
-Iron Sheets 350 m @ 800 = 280,000
-Ridges 65 pcs @ 550 = 35,750
-Doors -wooden 8 @ 4,500 = 36,000
-Steel doors 2 @ 10,000 =20,000
-Main steel door 1 @ 15,000 =15,000
-Windows all =130,000
-Gutters & accessories = 45,000
-Fascia Board (8×1) 450 fts @ 70 = 31,500
-Tiles 123 pcts @ 1,000 = 123,000
-Paint 55 litres @ 2,000 = 110,000
-Wood preservative 20 litres @ 700 = 14,000
-Plumbing = 60,000
-Electrical = 110,000

Total Materials - 2,130,200
Labour - Inbox

HTTPS://WA.ME/254790893021

Photos from Picam-Apex Construction Limited's post 01/12/2021

Ongoing project will be see it complete
For architectural, structural and building needs call or WhatsApp
HTTPS://WA.ME/254790893021

28/10/2021

Bungalow 3 bedroom
Lounge, Dining, Kitchen, Pantry and cloak room
Soil – Red, loam ,marram
Foundation- not more than 2m dip
Substructure
1.) Site Clearance – 7,200
2.) Excavation & Earth works-80,200
3.) Water Disposal- 5,000
4.) Levels- 5,200
5,) Strip Concreting-72,000
6.) Foundation Walling-150,000
7.) Filing-72,000
8.) Anti-Termite-11,300
9.) B.R.C-26,000
10.) D.P.M-9,000
11.) Slab Concrete-136,000

Ground Floor
1.) Walling-259,050
2.) Doors & Windows-170,000
3.) Plaster Finish-259,950
4.) Roofing-287,800
5.) Ceiling-150,000
6.) Cabinets and Wardrobe-80,000
7.) Electricals-150,000
8.) Plumbing-100,000

HTTPS://WA.ME/254790893021

Photos from Picam-Apex Construction Limited's post 25/10/2021

HTTPS://WA.ME/254790893021
4 bedroom maissionate.
G.f
Guest bedroom
Kitchen /Pantry
Lounge
Laundry
Dining and
Garage

(U.f)
Master bedroom
Master bath
Walk in closet
Terrace
2 bedrooms (each ensuite with walk in closet)

(Basement)
Family entertainment room
Office

14/10/2021

HTTPS://WA.ME/254790893021
Visit Us and design your future home ,commercial or a public complex. We are located at Ruiru Kimbo where we can talk face to face.

Photos from Picam-Apex Construction Limited's post 26/09/2021

HTTPS://WA.ME/254790893021
For architectural, structural and BQ
4 bedroom maissionate
Sunken lounge
Dining
Kitchen with Pantry
Guests bedroom
Master bedroom with walk in closet and master bath
Study room
Cloakroom
All bedrooms ensuite.
Call us or WhatsApp today.
We build your future today

07/09/2021

For architectural and building We Picam-apex Construction Ltd are ready for your mjengo.feel free to call us through our contact details provided.
HTTPS://WA.ME/254754893021

29/08/2021

For architectural drawings,This is a 5 bedroom maissionate, lounge,kitchen with pantry, cloakroom and family room upstairs. This design can be realised on a 40x80 minimum plot of land.Feel free to call for more information.
HTTPS://WA.ME/254790893021

29/08/2021

For Architectural drawings,This is a 3 bedroom Attic Maissionate,spacious Lounge, kitchen with pantry,cloakroom and a small study.Its good design which can fit on a 40x60 minimum plot of land.
HTTPS://WA.ME/254790893021

29/08/2021

For architectural drawing, this is a 4 bedroom flat roof maissionate, spacious lounge, kitchen with pantry, dining, laundry and a cloakroom. All bedrooms are ensuite while master bedroom has an additional closet.
HTTPS://WA.ME/254790893021

Photos from Picam-Apex Construction Limited's post 25/08/2021

This is an on going 3 bedroom maissionate at Juja.Picam-Apex brings the best from design to bringing up the building. Build with the best. Available
HTTPS://WA.ME/254790893021

Want your business to be the top-listed Engineering Company in Ruiru?
Click here to claim your Sponsored Listing.

Videos (show all)

Shout out to my newest followers! Excited to have you onboard! Rachael Ndangili, Douglas Makuba, Felix Mutua, Charles Mu...

Address


Ruiru, Kimbo
Ruiru
3563

Other Construction Companies in Ruiru (show all)
Kuick Engineering Services and  General Supplies LTD. Kuick Engineering Services and General Supplies LTD.
RUIRU
Ruiru, 254

We are Experts in Architectural and Structural Designs, Bill of Quantites{BQs} and General Construct

Naya Properties Ltd Naya Properties Ltd
Bypass
Ruiru

We are a firm in Kenya providing high quality Real Estate Consultancy through Alminium fabrications.

Mwasaka Construction  & Architectural consultants Mwasaka Construction & Architectural consultants
1485
Ruiru, 00232

Building plans, Structural drawings, Building construction, Building materials,Cost estimation, Renovation & Decoration.

Nesak construction Solutions Ltd Nesak construction Solutions Ltd
Ruiru
Ruiru, 155-00515NAIROBI

We deal in waterproofing, epoxy flooring, all types of industrial floors, decorative plaster and general constructions.

Emaculex Interior designers and contractors Ltd Emaculex Interior designers and contractors Ltd
Ruiru By-pass
Ruiru

We are interior design contractors passionate about making your space the way you envisioned.

Resinton Plus Kenya Resinton Plus Kenya
Eastern Bypass
Ruiru, 00200

Resinton Plus Kenya supplies the best quality building materials sourced from the best Manufacturers

Rightzone General services Rightzone General services
Ruiru
Ruiru, 342-00216

deals with general building construction/architectural,structural and bill of quantities

MAMBA General contractors MAMBA General contractors
Danielbaraka882@gmail. Com
Ruiru

Dealers in all building materials

ORAD GROUP ORAD GROUP
Spur Mall
Ruiru, 00232

ORAD GROUP is an award-­winning Kenya-based real estate firm renowned for excellence in design and construction.

Biolite Solutions Biolite Solutions
Ruiru, Kiambu
Ruiru, 00900

Biolite Solutions provides expert solutions for the treatment of waste water and industrial effluents

Dwelmak construction company Dwelmak construction company
Ruiru
Ruiru, 2059

Spero Glass Contractors Spero Glass Contractors
Ruiru

Supplier of all types of building glasses, mirrors, putty & related fittings. We also do installatio