MGR Construction Company Pvt. Ltd.

MGR Const. offers general contracting svcs. Mission:
To perform the highest level of quality const.

24/04/2020

"RAMADAN MUBARAK"

Ramadan is Observed Worldwide as a month of Fasting, Prayers, Devotion, Spirituality, Faith and Forgiveness.
May the spirit of Ramadan stay in our hearts and illuminate souls from within. Aameen.

Photos from MGR Construction Company Pvt. Ltd.'s post 03/04/2020

NEW DESIGN OF MASONRY PANELS USING MURFOR COMPACT.

"BED REINFORCEMENT ON A Roll"

As construction has become more competitive, the walls have become thinner than they were half a decade ago.
This caused problems for the designer, the contractor and the owner; there is less reserve of force to respond to movement for example. Non-clay walls tend to move due to changes in moisture content and, with certain combinations of shape and size, cracks appear in reinforced walls.
Murfor is the new generation of masonry reinforcement. Supplied in a roll, this reinforcement is extremely user-friendly and guarantees effective and lasting protection for your masonry, incorporated into bed joints, can virtually eliminate the development of unsightly cracks.
Thin walls are more difficult to justify for lateral loading, and Murfor can greatly help their ability to withstand such loading.

Photos from MGR Construction Company Pvt. Ltd.'s post 10/03/2020

BASE ISOLATION SYSTEM:

Base isolation may be a sort of system within which the super-structure is isolated from the bottom structure(foundation) by a suspension.It sounds terribly easy however in sensible it is not. Base isolation system is usually wont to scale back the bottom vibration(caused by earthquake) which will cause harm to the structure. This system really helps to cut back the frequency and magnitude of the bottom vibration(caused by earthquake).

Photos from MGR Construction Company Pvt. Ltd.'s post 28/02/2020

IMPORTANT TYPES OF FORMWORK USED IN CONSTRUCTION SITE:

Formwork is a mold or open box, like a container in which fresh concrete is poured and compacted. When the concrete is set, the formwork is removed and a solid mass is produced in the form of the interior face of the formwork. The top of the formwork is normally left open.
Temporary formwork designed to be struck and reused may be made from any economic and easily worked material, timber, steel and GRC/GRP being the most common.
Formwork materials can be classified as:
1- Timber Formwork
2- Metal Formwork
3- Plastic Formwork
4- Insulating concrete form or insulated concrete form (ICF)

Photos from MGR Construction Company Pvt. Ltd.'s post 24/02/2020

FLAT SLAB BUILDING STRUCTURES POSSESSES:

Flat slab building structures possesses major advantages over traditional slab beam column structures because of the free design of space, shorter construction time, architectural functional and economic aspects. Because of the absence of deep beams and shear walls, flat slab structural system is significantly more flexible for lateral loads then traditional RC frame system and that make the system more vulnerable under seismic events.
The results of the analysis of some types of building systems presented in the article show that the system of flat slabs with certain modifications (design of the beam in the perimeter of the building and / or the walls RC) can reach a factor of rational behavior considering EC8 and can be considered as a system with acceptable seismic risk. Modifications with additional building elements improve the low load bearing capacity of the system and increase strength and rigidity, thus improving the seismic behavior of the flat slab construction system.

24/02/2020

"GREEN CONCRETE" AGAINST GLOBAL WARMING

24/02/2020

"GREEN CONCRETE" AGAINST GLOBAL WARMING:

A German researcher has developed a new type of concrete called "green concrete". This new concrete is mainly based on a new type of cement characterized by many advantages, from the point of view of the environment, compared to traditional cement known to man and on which it relies for decades. The new cement is manufactured in one of the main industrial facilities of the German Institute of Technology KIT in Karlsruhe. The new cement, named by the owner of "cement", is also manufactured in less calcareous quantities. Stimmerman. Since Stimmerman developed the method with the help of three colleagues after 15 years of preliminary research, companies and businessmen came to him from all sides.

22/02/2020

What Is The Difference Between Nominal Mix And Design Mix?

NOMINAL MIX.
1- When concrete is produced using standard arbitrary proportions of concrete ingredients, it is known as nominal mix concrete.
2- The nominal mixture is a mixture taking into account all the ratios in the volume where the strength and cost of concrete and the strength of concrete vary.
3- It is concrete of the prescriptive type.
4- It is used in ordinary concrete involving a quality of concrete not higher than M20.
5- There is no quality control.
6- The water-cement ratio is based on sustainability criteria, experience and practical tests.
7- The water content can be modified by the slump value (field test)
8- No trapped air content is taken into account.
9. The concept of test mixtures is mentioned.

DESIGN MIX.
1-It can be defined as the process of selecting the appropriate ingredients of concrete and determining their relative proportions in order to produce concrete of a certain minimum strength and durability in the most economical way.
2- The design mix is ​​a mix considering that the whole mix ratio is by weight where the strength of the concrete is a constant cost of the concrete which can be reduced.
3- It is concrete based on performance.
4- It is adopted for high quality concrete.
5- It has quality control.

Photos from MGR Construction Company Pvt. Ltd.'s post 21/02/2020

PILE FOUNDATION:
Pile foundation support the structure, transfer the loads from the structure to the ground. However, the layer to which the foundation transfers the load must have an adequate bearing capacity and appropriate settlement characteristics.

TYPES OF PILE FOUNDATION:
1- Based on material Used
2- Based on Mode of transfer of Load
3- Based on the method of installation
4- Based on Uses
5- Based on the displacement of soil
6- Under-reamed Pile

CAUSES OF FAILURE OF PILE FOUNDATION:
1- Inaccurate determination of the bearing capacity of the pile.
2- When the pile load is greater than the design load.
3- Poor and defective workmanship while casting the pile.
4- Corrosion of the timber pile because of assault by insects.
5- Defective techniques used while driving the pile.
6- Bearing pile laying on delicate strata.
7- Buckling of the piles because of insufficient lateral support.
8- Faulty soil investigation.
9- Selecting the wrong type of pile.
10- Inappropriate characterization of soil.
11- Inadequate reinforcement in the pile.
12- A decay of piles. (like an attack of insects, corrosion etc.)

Mars City State Design Competition Announced - The Mars Society 21/02/2020

https://www.marssociety.org/news/2020/02/11/mars-city-state-design-competition-announced/

Mars City State Design Competition Announced - The Mars Society The Mars Society is pleased to announce the holding of an international contest for the best design plan of a Mars city state of 1,000,000 people. There will be a prize of $10,000 for first place, $5,000 for second, $2,500 for third, $1,000 for fourth and $500 for fifth. In addition, the top 20 pape...

21/02/2020

Power of Structural Engineer..

20/02/2020
MGR Construction Company (PVT) LTD 19/02/2020

Now you can Find/Follow us on Google:
Our Registered Office.
MGR Construction Company (PVT) LTD
Islamia Rd, Peshawar Cantonment, Peshawar, Khyber Pakhtunkhwa, Pakistan
+92 318 7656636

MGR Construction Company (PVT) LTD ★★★★★ · Construction company · Islamia Rd

31/12/2019

Happy New Year 2020

May the twenties be your best decade ever and your vision be 2020, prosperity soar, health be impeccable and love divinely led.

The MGR Construction Wishes you all the very best!

05/11/2019

MGR Construction Company Pvt. Ltd.

05/11/2019

MGR Construction Company Pvt. Ltd.'s cover photo

Want your business to be the top-listed Engineering Company in Peshawar?
Click here to claim your Sponsored Listing.

Telephone

Website

Address


Office No. FF-339, Dean's Trade Center, Peshawar Cantt
Peshawar
25000

Opening Hours

Monday 08:00 - 17:00
Tuesday 08:00 - 17:00
Wednesday 08:00 - 17:00
Thursday 08:00 - 17:00
Friday 08:00 - 12:00
Saturday 08:00 - 17:00

Other Construction Companies in Peshawar (show all)
Asfandis Builders Asfandis Builders
Peshawar

ASFANDI’S BUILDERS was founded in 1985 by its founder and CEO Mr Asfandiyar who has unparalleled p

Mushtaq Concrete Mushtaq Concrete
Umar Abad
Peshawar, 25000

Ready roof concrete blocks and construction material available

APEX architects and Builders APEX architects and Builders
Office# B6, First Floor. Khyber Tower, Kabootar Chowk. Ring Road
Peshawar, 25000

Architects, Planners, Designers and Builders

MHC Construction Company MHC Construction Company
Warsak Road
Peshawar, 25000

We provide a Best services related construction works and Gernal order suppliers, MHC, 🏠🛣️🏗️🏛️

Al-Syed Real Estate & Builders Al-Syed Real Estate & Builders
Dalazak Road Peshawar
Peshawar, 25000

Al-Syed is a Construction,Renovation, Planning,Designing,Landscape, Interior,Consulting and Management Company

Paragon Builder's & Consultant Paragon Builder's & Consultant
Peshawar, 25000

We are the construction contractors of Peshawar KPK. We deals in all kinds of quality construction/r

Crossroadx Engineering Services Crossroadx Engineering Services
Office 2b, 2nd Floor, Arbab Plaza, Adjacent To Shell Filling Station, Opposite To Deans Complex, Khyber Pakhtunkhwa
Peshawar, 25120

crafting your curiosity

SECOM Consultants SECOM Consultants
Peshawar

We provide services in the areas of Structural Engineering, Construction, Operation, and Management.

Paradise Tower Paradise Tower
Opposite Gul Haji Plaza , Main University Road
Peshawar, 25000

These amazing facilities have been included: -Ideal location -Electricity Backup -Car Parking -CCTV

Brother and Brothers Construction Brother and Brothers Construction
Peshawar, 25000

Builders and General Order Suppliers

Noor Allied Company Noor Allied Company
Mattani
Peshawar

Building construction

Platinum Corporation - Pvt Ltd. Platinum Corporation - Pvt Ltd.
Plot#186, Industrial Estate, Jamrud Road, Khyber Pakhtunkhwa, Pakistan
Peshawar, 25000

Platinum Corporation was founded in 2017 by CEO Zakori Group, Mr. Ayub Khan Zakori. Aimed at providing trustworthy and quality construction services, the construction company is eq...