S.J. Hamill's Port Terminal Development Projects for the South Carolina Ports Authority
- Installation of 4,000,000 Tons of Crushed Stone Materials
- 1,000,000 Cubic Yards of Hydraulic Dredging
- 24,000,000 Feet of Vertical Wick Drains for Ground Improvement
- 800,000 Cubic Yards of Onsite Excavation & Backfill
- 600,000 Cubic Yards of Sand Dredging & Reclamation for Terminal Fill
- 160,000 Feet of Horizontal Drains
- 800 Feet of Cradle Supported Outfall Pipes Covered with Rip Rap
- 550 Driven H-Piles 90+ Feet Deep on 4:1 Batters
- 5000 Auger-Cast Pilings 70+ Feet Deep
- 20,000 Square Yards of 15" Thick Concrete Relieving Platform Slab
- 9,800 Linear Feet of Concrete Pile Caps
- 11,000+ Cubic Yards of Concrete
- 4,800 Linear Feet of Sheet Pile Walls
- 100,000 Tons of Concrete Demolition & Processing
S.J. Hamill Construction at HLT Terminal
S.J. Hamill's Port Terminal Development Projects for the South Carolina Ports Authority
- Installation of 4,000,000 Tons of Crushed Stone Materials
- 1,000,000 Cubic Yards of Hydraulic Dredging
- 24,000,000 Feet of Vertical Wick Drains for Ground Improvement
- 800,000 Cubic Yards of Onsite Excavation & Backfill
- 600,000 Cubic Yards of Sand Dredging & Reclamation for Terminal Fill
- 160,000 Feet of Horizontal Drains
- 800 Feet of Cradle Supported Outfall Pipes Covered with Rip Rap
- 550 Driven H-Piles 90+ Feet Deep on 4:1 Batters
- 5000 Auger-Cast Pilings 70+ Feet Deep
- 20,000 Square Yards of 15" Thick Concrete Relieving Platform Slab
- 9,800 Linear Feet of Concrete Pile Caps
- 11,000+ Cubic Yards of Concrete
- 4,800 Linear Feet of Sheet Pile Walls
- 100,000 Tons of Concrete Demolition & Processing