Berenguer Properties

I am a retired Carpenter/Superintendent looking to start or finish your construction projects.

Photos from Berenguer Properties's post 05/03/2023

This one took a lot longer than it should have with minnesota weather not cooperating with us. But wow did this turn out awesome! With removing their deck and handrail it really opened up their backyard. Time to enjoy this patio with friends and family. Thank you for the opportunity to do this project for you and I hope you enjoy this!

Photos from Berenguer Properties's post 05/01/2023

Stairs are poured and stamped now ready for the patio.

Photos from Berenguer Properties's post 04/22/2023

Got this deck removed and ready for concrete prep work then Minnesota weather got involved… ready for some nice weather so we can get this patio poured. Watch for the end result this one is going to awesome. Custom designed stamped concrete stairs and stamped concrete patio.

03/23/2023

2 down 37 more to go.

Photos from Berenguer Properties's post 02/17/2023

Deck season is right around the corner. Now is the time to start getting quotes and get on a schedule for spring and summer. Message me for a quote.

02/10/2023

3 season porch is up. Final touches on basement framing will be done Monday.

Windows delayed until March 10th.

Flat roofers started today and will be finishing up tomorrow.

HVAC starting tomorrow to get temp going. Then rolling into scope work.

Plumbers ready to start when heat is rolling.

Xcel connected permanent power.

If your looking for any construction projects for the spring and summer now is the time to start planning. Message me to get a quote.

Photos from Berenguer Properties's post 01/24/2023

Roof is done! Reinstalled the tarp to keep existing hardwood and Sheetrock dry. Time to start punching my way back down to the basement.

Photos from Berenguer Properties's post 01/19/2023

We cut and tore off about 3’ of roof to install this new beam to carry the weight. Demoed the exterior wall on the left of one of the pictures because that wall will move under the beam. Also demoed out the flat roof, spray foamed the exterior and built up the floor to match existing. Now I got a couple more exterior walls then the roof.

If your looking for any construction services send me a message. Booking out for the spring now. deck projects will be pushed more towards the end of spring when frost is out of the ground.

Photos from Berenguer Properties's post 01/17/2023

After some floor truss issues and a big snow storm we have lost some time but getting back at it and it’s all coming together.

Photos from Berenguer Properties's post 12/13/2022

Back from vacation. Demo crew did their thing now it’s time to tie these two buildings together and start framing exteriors on the main floor. After demo we noticed more joist were rotten so ended up replacing more joist than originally expected.

Photos from Berenguer Properties's post 11/27/2022

More materials showed up but then got the flu. Short week but got some work done. Monday the warmboard subfloor comes then I can really start going. This client is my old boss from when I was a superintendent. He has set up an office for me with prints and a computer for digital prints. This will make the project go a lot faster when other subs start showing up. It’s the simple things.

Next week i will be demoing into the existing house to tie in the floor systems.

Photos from Berenguer Properties's post 11/22/2022

Been working around areas while I wait for material. End of the day today I got the lvls and zip sheeting. Tomorrow to build the front side of the garage and set floor joist. Next is waiting for the warm board to arrive.

Photos from Berenguer Properties's post 11/16/2022

Started a new addition today on this awesome snowy/wet day. Looking at just over 2,000 square feet with the garage. This will have 2 roof top decks. One off the master and the other on top of the garage with a hot tub. Also gutting and remodeling the interior of the existing home. Stay tuned for more updates, I’m going to be here for a little while.

Photos from Berenguer Properties's post 11/09/2022

Round 2 of pouring concrete for our basketball hoop. 1st one an adult male decided to dunk on it before concrete was cured…name not to be mentioned. I enrolled my kids to help with operating the dingo and the whole process made it a fun time. This has more rebar in it than my footing for my house. Prepped to last a lifetime plus teaching the kids new things.

Photos from Berenguer Properties's post 11/08/2022

Finishing touches are done. Gutters, a little grading in the back, ramp, solar lights and work bench. This customer didn’t want any rodents in their shed so we installed steel French doors and a steel man door, also installed fiberglass reinforced plastic foundation wrap to keep rodents from getting underneath their shed.

Photos from Berenguer Properties's post 11/01/2022

Putting the final touches on this 12’x24’ shed.

Photos from Berenguer Properties's post 10/13/2022

All inspections passed! Ready to open for business.

Photos from Berenguer Properties's post 10/06/2022

It’s time for my least favorite part of build out, FRP. But wow my tile guy did a fantastic job!

Photos from Berenguer Properties's post 10/06/2022

I took this job over after another contractor wasn’t giving the homeowner what they wanted. We ended up tearing out all 30 post and restarting fresh. This fence was all green treated dog ear pickets.

10/01/2022

Installing a fence this week, who knows what tomorrow will bring.

Photos from Berenguer Properties's post 09/27/2022

Countertops in and now ready for Sheetrock tomorrow.

09/27/2022

Counter top day!

Photos from Berenguer Properties's post 09/23/2022

Framing walls and bar done
Plumbing rough in done
Electrical going in today
Now just waiting for some inspections then rock, tile, flooring and some final touches and they will be open for business.

09/23/2022

Pouring in concrete trench. 33 bags got it mixed and poured in 1.5 hours.

Photos from Berenguer Properties's post 08/11/2022

Finished this amazing deck in the morning to rush to the hospital and have a baby. I love the journey of life. Deck is maintenance free with aluminum handrail and trex rocky harbor decking.

Photos from Berenguer Properties's post 07/02/2022

Just finished up this deck today. Changing the layout really opened up their backyard. Trex costal bluff maintenance free decking, black aluminum handrail and veranda white PVC trim boards.

TikTok - Make Your Day 04/25/2022

Started framing a new basement today and having fun with the new camera.

TikTok - Make Your Day TikTok - trends start here. On a device or on the web, viewers can watch and discover millions of personalized short videos. Download the app to get started.

04/23/2022

Today is a good day to turn on your A/C and make sure everything is working the way it should before HVAC companies get busy again.

Photos from Berenguer Properties's post 04/20/2022

Out with the old, in with the new. Cedar coming off this front porch and maintenance free Trex going on. If your looking to resurface or build a deck send us a message.

03/28/2022

Had the opportunity this weekend to install these awesome Acacia countertops. Had a lot of fun and these look incredible!

Want your business to be the top-listed Engineering Company in Chaska?
Click here to claim your Sponsored Listing.

Videos (show all)

Pouring in concrete trench. 33 bags got it mixed and poured in 1.5 hours.

Website

Address


Chaska, MN
55318

Other Construction Companies in Chaska (show all)
The Berg Group The Berg Group
1225 Lakeview Drive
Chaska, 55318

The Berg Group has been a respected leader in the commercial construction industry for over 50 years

Restoration Systems Inc. Restoration Systems Inc.
4355 Peavey Road
Chaska, 55318

Restoration Systems is a specialty restoration company generally focusing on concrete repair, masonry

Ensconced Woods of Chaska Ensconced Woods of Chaska
3625 Big Woods Boulevard
Chaska, 55318

Welcome to Chaska's newest community, Ensconced Woods! Follow along for community updates and more!

Super Crew Contractors Super Crew Contractors
5146 Boulder Lane
Chaska, 55318

DESIGN • REMODEL • BUILD

Pro Siding Services Pro Siding Services
Chaska, 55318

We Have You Covered.Rest Easy Knowing That You Found A Reliable Solution For Your Home Needs.

Q-Masonry & Residential Improvements Q-Masonry & Residential Improvements
118 Peavey Cir
Chaska, 55318

We are building our reputation daily, one project at a time. We have satisfied every homeowner with o

DDK Construction DDK Construction
2970 Chaska Boulevard
Chaska, 55318

Smart Quality construction & Remodeling, LLC Smart Quality construction & Remodeling, LLC
Chaska, 55318

Paint (interior & exterior) drywall, hardwood & laminate floor ,tile,freiming, decks & more!

Structures, Inc. Structures, Inc.
117 Peavey Circle
Chaska, 55318

REDEFINING SITE SOLUTIONS