W O Blackstone & Co, Inc.

W O Blackstone & Co, Inc.

W.O. We help building owners, general contractors, property

Blackstone Mechanical Contractors offers a full range of mechanical contracting services for clients in the commercial office, healthcare, institutional and industrial markets in South Carolina.

Timeline photos 06/07/2022

On May 18, AllSouth Federal Credit Union hosted their annual Soldiers & Vets Charity Golf Tournament. We were unable to play this year, but happy to support this cause by sponsoring a hole. AllSouth raised more than $20,000 to benefit Hidden Wounds! Great work!

Commercial Service Plumber Position Open At WO Blackstone 06/03/2022

W.O. Blackstone & Co. Inc. is seeking a highly motivated Commercial Service Plumber to join our team. Salary based on experience, from $52,000 – $60,000 per year. Founded in 1937, WO Blackstone works hard to uphold our strong tradition of quality work, safety focus and commitment to excellence. https://www.woblackstone.com/employment/commercial-service-plumber

Commercial Service Plumber Position Open At WO Blackstone The Service Plumber is responsible for installing, repairing, and maintaining plumbing systems, fixtures and other plumbing used for water distribution and wastewater disposal in commercial office, healthcare, and industrial buildings.

Timeline photos 05/31/2022

We are hiring! 🗣

Commercial Service Plumber Position Open At WO Blackstone http://ow.ly/Eymj30sl2Jc

Timeline photos 05/24/2022

W.O. Blackstone is a mechanical contractor with a strong resume of healthcare and related projects. We will provide competitive pricing, strategies on how to become more efficient, and an understanding of what it takes to run a facility better so it improves patient care.

It takes an elite crew to install a first class healthcare project. Not only are we price competitive, we are also prepared to execute with a qualified project manager and superintendent with the ability to manage complex systems that the architects and engineers have designed.
https://mcusercontent.com/ed7365188d99c698dc7644049/files/088e9caf-eb3d-4d5b-3ebf-6fcecbecd87e/WOB_Healthcare.pdf

Timeline photos 05/19/2022

📍COLUMBIA, SC

The USC Alumni Center is a 60,000 square foot facility that features flexible event, meeting and administrative space. The Alumni Center is located in the heart of Columbia, near the USC Columbia, SC campus.

The HVAC systems and scope for this project included new roof top units, split systems, terminal boxes, distribution ductwork and complete building environmental controls. We completed this project with quality, integrity and efficiency!

https://www.woblackstone.com/wob-work/pastides-alumni-center

DOE updates water heater rule for first time in two decades 05/17/2022

The Biden administration has unveiled the first new energy efficiency standards in over 20 years for water heaters in commercial buildings, a move it says could slash greenhouse gas emissions and reduce energy costs.

DOE updates water heater rule for first time in two decades. If you need to speak to someone about upgrading, don't hesitate to call us.

https://www.eenews.net/articles/doe-updates-water-heater-rule-for-first-time-in-two-decades/

DOE updates water heater rule for first time in two decades New standards would reduce carbon emissions by 38 million metric tons between 2026 and 2055, the Department of Energy said.

Timeline photos 05/12/2022

As temperatures climb, so does the demand for HVAC maintenance. Our Service and Maintenance Division is intensely focused on providing a seamless customer experience, 24-hours a day, 365 days a year. Clients enjoy working with our Service Division because our people do what they say they are going to do, we quickly answer phone calls, and respond to maintenance issues with professionally trained and experienced technicians.

Learn more about our extensive list of specialized service and how we can be of service to you! https://www.woblackstone.com/service

Photos from W O Blackstone & Co, Inc.'s post 05/12/2022

📍COLUMBIA, SC

AgFirst Farm Credit Bank relocated their corporate headquarters office to Main Street in Columbia, S.C. The upfit project includes 6 floors of the building with scope covering HVAC upgrades. The AgFirst Data Center was an additional phase of this overall project.

If you are interested in discussing a project with us, contact the W.O. Blackstone Team. https://www.woblackstone.com/wob-work/agfirst-farm-credit

Timeline photos 05/06/2022

Improvements brighten surroundings, experiences at Transitions Homeless Center and our very own Daniel Branham got to be a part of it.

http://ow.ly/s0bC50J18Vc

Photos from W O Blackstone & Co, Inc.'s post 05/03/2022

You may have noticed many non-profits in our area promoting today; the annual day of on-line philanthropy here in the Midlands. One organization that's dear to us is Camp Cole. We were honored to be selected to complete the HVAC work for their "unique, fully accessible camp and retreat facility for all people, but with a particular heart to help people who might be dealing with serious illness or a disability."

Camp Cole has a medical facility and conference center. The HVAC is driven by a VRF (variable refrigerant flow) system which is a two-pipe heat recovery system that simultaneously heats and cools different zones within the building. The system provides an energy efficient approach and a small footprint along with quiet operating levels. To learn more about the work we did, visit our website. https://www.woblackstone.com/wob-work/camp-cole

Timeline photos 04/28/2022

We are proud to have been selected as the HVAC subcontractor on this exciting project with the State Credit Union's headquarters, in the heart of downtown Columbia. The renovated and new space will total nearly 74,000 square feet and is expected to be completed by next summer.

https://columbiabusinessreport.com/news/construction/81881/

Supply Chain Shortages In the HVAC Industry and How We're Responding. 04/27/2022

With prices for essential construction and HVAC parts rising, deliveries taking twice as long and material prices reaching a 35-year high, our industry is experiencing a crisis with little short-term relief in sight.

In response to these issues, W.O. Blackstone, Inc., is taking proactive steps to help our customers. Read more to learn how. https://www.woblackstone.com/post/supply-chain-shortages-in-the-hvac-industry-and-how-were-responding

Supply Chain Shortages In the HVAC Industry and How We're Responding. With prices for essential construction and HVAC parts rising, deliveries taking twice as long and material prices reaching a 35-year high, our industry is experiencing a crisis with little short-term relief in sight.

Timeline photos 04/22/2022

East Cooper Medical Center: MOB
📍MOUNT PLEASANT • SOUTH CAROLINA

New 42,000 SF concrete tilt-panel and steel framed medical office building for East Cooper Medical Center. The medical practices in the facility include physician practices with a focus on women’s services and orthopedic services, as well as outpatient physical therapy and laboratory services. Mechanical scope included 2 roof top package units, associated ductwork throughout, VAV boxes and wireless controls. https://www.woblackstone.com/wob-work/east-cooper-medical-center-mob

Timeline photos 04/19/2022

‍Keeping up with your HVAC's basic maintenance can help prolong the life of your equipment. Staying proactive and up to date on the preventative maintenance (PM) schedule is critical.

In response to on-going supply chain issues, W.O. Blackstone is taking proactive steps to minimize disruption by providing HVAC inspections to plan for potential disruptions, and identifying repairs that might require a part with a long lead item and notifying customers in advance so we can place orders proactively.

Timeline photos 04/15/2022

From the W.O. Blackstone family to yours, wishing you all a beautiful Easter weekend!

Timeline photos 04/12/2022

Absolutely.
Without A Doubt.

Our late President and co-Owner Steve Caswell, coined this phrase to describe our “do what it takes” focus on helping our customers. This attitude captures the spirit and culture of W.O. Blackstone & Co., Inc. The Leadership team is focused on providing best in class service for our clients. by keeping our core values in the forefront of all they do. Is there something we can help you with? Give us a call. We'll do whatever it takes.

https://www.woblackstone.com/about-us

Timeline photos 04/07/2022

Bryan Hospital : Morris Village

📍COLUMBIA • SOUTH CAROLINA

On this project, we replaced existing chilled water system with two 1200 ton packaged semi-hermetic centrifugal water-cooled chillers, along with two 200 hp variable flow primary pumps using new 12” chilled water and condenser water piping.

Associated electrical service was upgraded to include a 1500 KVA transformer, switchboards, and new lighting fixtures throughout. General construction was comprised of steel er****on, concrete work, overhead roll up doors, galvanized fence, and epoxy floor painting. Direct digital controls were utilized on the new HVAC system, complete with refrigerant monitors and emergency centrifugal exhaust fan. Plumbing upgrades included make up water metering and an emergency eyewash station.

Learn more about this project and others by visiting our website. https://www.woblackstone.com/wob-work/bryan-hospital-morris-village

Timeline photos 04/05/2022

W.O. Blackstone & Co., Inc. is looking for a highly motivated, organized individuals who want to be part of a successful team. See the current career opportunities, employee benefits and information about us by clicking the link below.

➕ Employment Benefits ➕

~Excellent compensation and benefits package including bonus eligibility.
~Health Plans for medical, dental and vision.
~Short term disability and long term disability.
~Life insurance
~Paid holidays and time off.
~401k Retirement Plan + Employer Match
~We believe in continuous learning, training and growth opportunities.

To apply, complete the application and email to the HR Department.

☎️More information803.252.8222 x145

https://www.woblackstone.com/careers

Timeline photos 03/31/2022

Student Health Center, on the University of South Carolina
📍 Columbia, SC

The 68,000 square foot steel framed building is a mix of exterior cladding including brick and glass. W.O. Blackstone’s scope included distribution ductwork, a VAV Zone system, general building exhaust, controls, fan coil units and mini –splits. The project included an underground vault & piping to connect to the University’s central energy system to included chilled water, hot water & steam piping system. The building is conditioned by means of two hydronic 31,050 CFM air handling units set at the penthouse.

For more photos of this project, or to get the WOB Project Profile Sheet click here. https://www.woblackstone.com/wob-work/university-health-services

WOB Provides Storm Preparation Services For Your Business 03/30/2022

💨 🌀🌧️ Believe it or not, now is the time to start thinking about hurricane season preparedness. We are just a little over 60 days out. Don't wait until it's too late! Let us help you and your business be ready in the face of a natural disaster. https://www.woblackstone.com/post/are-you-prepared-in-case-disaster-strikes

WOB Provides Storm Preparation Services For Your Business With hurricane season in full swing, it’s a good reminder that we need to be prepared in case of a natural disaster, a power outage or mechanical failure. At W.O. Blackstone, we can help you develop a contingency plan for your properties, making sure you’ve properly assessed any risks and have y...

Timeline photos 03/25/2022

Take a look at the renovation project we completed for the 128,000 square foot Seibels Bruce Building. The original building was constructed in 1949 with an addition in 1977. The renovation project was undertaken as the building was occupied and the project was phased with coordination between the owner, the architect and project team.

HVAC scope included chilled water plant consisting of (2) air cooled chillers, pumping system, and air control system. Heating water plant consisting of (2) natural gas boilers, pumping system, and air control system. Air delivery system consists of AHUs with chilled and heating water coils, VAV boxes, MP ductwork, LP ductwork including air distribution, and return ductwork. Exhaust system consisting of multiple exhaust fans and ductwork including air distribution. Full DDC control system. You can check out the project spec sheet, here. https://www.woblackstone.com/wob-work/seibels-bruce-group

Timeline photos 03/22/2022

Supply Chain Shortages Affecting the HVAC Industry and Our Response
https://mailchi.mp/8375e873da3e/wo-blackstone-co-inc-indoor-air-quality-6173733?e=60a5c6ecb5

Timeline photos 03/17/2022

We're feeling pretty lucky to know all of you, and we are so grateful for your business!

Timeline photos 03/15/2022

Take a look at the work we did for Terminix Services!

📍COLUMBIA • SOUTH CAROLINA

The Terminix project was a new 52,000 SF, 2-story corporate office building on a tight construction site. The building has a large training area, private offices and open work stations, multiple conference rooms, break rooms and a mail room. The HVAC scope is a VRF system which is a multi-split type air conditioner for commercial buildings that uses a variable refrigerant flow to provide comfort control. Condensing units are roof mounted with associated piping and control wiring to each ducted air handling unit. Air distributed by medium and low pressure ductwork. Outside air provided to the building by dedicated, roof mounted units. Two data rooms are conditioned by separate ductless split system units.

For more details on this project, and to see many more, visit our website! https://www.woblackstone.com/our-work

5 Ways to Fix Office Air and Get Workers Back 03/13/2022

5 Ways to Fix Office Air and Get Workers Back

Some 82% of office workers report being concerned about indoor air quality, according to a recent study by Honeywell, and 62% of respondents would quit if their employer did not take necessary measures to create a healthier indoor environment that promotes well-being, according to a study conducted this winter.

https://time.com/charter/6149163/fix-office-air/

5 Ways to Fix Office Air and Get Workers Back Since moving to its new office a year ago, Windsor Federal Savings, a Connecticut-based bank, hasn’t had a single instance of Covid transmission through the...

Timeline photos 03/08/2022

Take a look at the work we completed for North Energy Plant Expansion.

📍COLUMBIA • SOUTH CAROLINA

🧊Chilled Water Loop Extension

‍Construction of a new two story steel framed building which is an addition to the North Energy Plant for the installation of one 3,000 ton chiller, cooling tower, pumps and the installation of chilled water distribution piping. An extensive underground piping installation, as part of USC’s expansion of the chilled water distribution loop, was included in this project. The underground piping included a large, horizontal, directional bore under Assembly Street in downtown Columbia.

Learn more https://www.woblackstone.com/wob-work/north-energy-plant-expansion

Council Post: Property Owners: HVAC Preventative Maintenance Is More Important Than Ever 03/04/2022

HVAC Preventative Maintenance Is More Important Than Ever | Similar to maintaining a car with regular oil changes and tire rotations to ensure it runs well, HVAC preventative maintenance mitigates the chance of failure on a heating and cooling system, especially when it is needed most.

http://ow.ly/J2k150I8InT

Council Post: Property Owners: HVAC Preventative Maintenance Is More Important Than Ever There are many valid reasons to avoid the “if it ain’t broke, don’t fix it” mentality when it comes to the maintenance of an HVAC system.

Timeline photos 03/03/2022

"Absolutely. Without A Doubt."

Our late President and co-Owner Steve Caswell, coined this phrase to describe our “do what it takes” focus on helping our customers. This attitude captures the spirit and culture of W.O. Blackstone & Co., Inc.

Our core values are as follows:

QUALITY: We deliver excellence.
INTEGRITY: We do what we say we are going to do.
EFFICIENCY: We produce results.

To learn more about who we are and all that we can do for you, visit our website today. https://www.woblackstone.com/about-us

Photos from W O Blackstone & Co, Inc.'s post 02/25/2022

⛪ The Riverland Hills Church project is a new 1,200-seat, modern worship center featuring a large stage with tiered seating, new lobby & gathering space and associated classroom space.

We replaced two air-cooled chillers and associated piping. New piping was added in the main mechanical room along with updated controls and new chilled water pumps. We added three new air handlers in the mechanical room at the mezzanine of the worship center along with associated piping and ductwork. VAV’s were added off of one of these air handlers that serves the classrooms and other smaller spaces that required individual temperature control.

https://www.woblackstone.com/wob-work/riverland-hills-baptist-church

Timeline photos 02/23/2022

Our sheet metal fabrication team produces custom ductwork that meets the highest quality standards for every project requirement. Having an integrated fabrication shop allows us to respond in real time to any field challenges encountered. Our products are made from galvanized steel, stainless steel or aluminum using a welded or interlocking seal to fit every custom application. https://www.woblackstone.com/construction

Timeline photos 02/17/2022

🏥East Cooper Medical Center: MOB

📍MOUNT PLEASANT • SOUTH CAROLINA

New 42,000 SF concrete tilt-panel and steel framed medical office building for East Cooper Medical Center. The medical practices in the facility include physician practices with a focus on women’s services and orthopedic services, as well as outpatient physical therapy and laboratory services. Mechanical scope included 2 roof top package units, associated ductwork throughout, VAV boxes and wireless controls.

How can W.O.Blackstone help you on your next commercial HVAC project?

https://www.woblackstone.com/wob-work/east-cooper-medical-center-mob

Timeline photos 02/14/2022

With most every project, we can do our best and most impactful work during the Pre-Construction phase of the project. Pre-Construction services include GMP pricing, estimating, systems evaluation, scheduling, design assistance and ordering long lead items and major equipment.

Our comprehensive suite of Pre-Construction services can make us a key part of any design/build, construction management or negotiated construction team. We take a value based approach to Pre-Construction services, always with the overall success of the project in mind.

🛠️ If you're in the pre-construction stage of your next project, give us a call now so we can provide the most help possible. 🛠️

https://www.woblackstone.com/construction

Timeline photos 02/08/2022

Some jobs are more than just a job. The Camp Cole project is a unique, fully accessible camp and retreat facility for all people, but with a particular heart to help people who might be dealing with serious illness or a disability. Camp Cole has a medical facility and conference center.

The HVAC is driven by a VRF (variable refrigerant flow) system which is a two-pipe heat recovery system that simultaneously heats and cools different zones within the building. The system provides an energy efficient approach and a small footprint along with quiet operating levels. We are so proud of the work we did here, and honored to play a small part in what Camp Cole aims to do in our community.

If you are interested in discussing a project with us, contact the W.O. Blackstone Team.

https://www.woblackstone.com/wob-work/camp-cole

Timeline photos 02/04/2022

W.O. Blackstone & Co., Inc. offers experienced, trained and certified supervisors and craftsman. Our welding and pipefitting team can tackle complex commercial and industrial projects with a constant focus on safe work practices and the quality of the welding process.

W.O. Blackstone & Co., Inc. is a full service mechanical contractor delivering projects across a wide spectrum of markets including health care, office, industrial and institutional. Our capabilities include pre-construction services, sheet metal duct fabrication, pipefitting and general construction. Call or visit our website today to learn more. https://www.woblackstone.com/construction

Timeline photos 02/02/2022

The USC Alumni Center is a 60,000 SF facility that features flexible event, meeting and administrative space. The Alumni Center is located in the heart of Columbia near the USC Columbia SC Campus. The HVAC systems and scope that we provided included new roof top units, split systems, terminal boxes, distribution ductwork and complete building environmental controls.

The W.O. Blackstone team can help provide the right solution for your building with optimal indoor air quality and backed by our exceptional 24/7, 365 days service and maintenance program.

Timeline photos 01/27/2022

We Do What We Say.

🕰️ 24-Hours A Day, 365 Days A Year.

👷Professionally Trained & Experienced Technicians.

👨‍🔧Service All Brands Of Equipment And Related Mechanical Systems

✔️Emphasis On Preventative Maintenance For Long-Term Operation And Efficiency

If you're looking for the most reliable experts in the field, look no further. Visit our website or give us a call to learn more. https://www.woblackstone.com/service

Timeline photos 01/25/2022

We are very proud of the project we completed for Hammond School. New 30,000 SF facility houses the science and technology learning environment along with classroom space. Scope included two roof top units, VAV airflow system, sheet metal ductwork distribution custom made by WOB, ductless split systems, fans, heaters and other aspects of air distribution. Click here to view the full project sheet!
http://ow.ly/Zxp050HAOUs

Timeline photos 01/20/2022

❄️ More "Winter Weather" in the forecast...who can you count on?❄️

Our Service and Maintenance Division is intensely focused on providing a seamless customer experience, 24-hours a day, 365 days a year. Clients enjoy working with our Service Division because our people do what they say they are going to do, we quickly answer phone calls, and respond to maintenance issues with professionally trained and experienced technicians.

We service all brands of HVAC equipment, chillers, air handlers, pumps, boilers and related mechanical systems. Our experience in mechanical systems and emphasis on preventative maintenance ensures the long-term operation and efficiency of your systems.

Our Services cover a vast range of mechanical equipment, from chillers to through-wall units, DDC controls to cooling towers and everything in between.

https://www.woblackstone.com/service

Timeline photos 01/17/2022

Today we celebrate the life of civil rights leader, Dr. Martin Luther King, Jr.

Timeline photos 01/13/2022

Take a look at this project we completed in Columbia, SC.

📍Bryan Hospital : Morris Village

✔️Replaced existing chilled water system with two 1200 ton packaged semi-hermetic centrifugal water-cooled chillers, along with two 200 hp variable flow primary pumps using new 12” chilled water and condenser water piping.

✔️Associated electrical service was upgraded to include a 1500 KVA transformer, switchboards, and new lighting fixtures throughout.

✔️General construction was comprised of steel er****on, concrete work, overhead roll up doors, galvanized fence, and epoxy floor painting.

✔️Direct digital controls were utilized on the new HVAC system, complete with refrigerant monitors and emergency centrifugal exhaust fan.

✔️Plumbing upgrades included make up water metering and an emergency eyewash station.

☎️Let us know how we can help you or your organization build or upgrade your current system.

Want your business to be the top-listed Contractor in Columbia?
Click here to claim your Sponsored Listing.

Address


1841 Shop Road
Columbia, SC
29201