ED Swett Inc

Established in 1936, E.D. Swett is an employee-owned bridge construction company and general contrac

10/30/2023

October 28, 2023 NHDOT Rte 202 Bridge Replacement over Contoocook River Peterborough. Project Superintendent Mike Desroches and ED Swett family members decking the bridge on a perfect fall Saturday. Dedication and team work. Thank you guys.

Photos from ED Swett Inc's post 10/25/2023

October 24, 2023 NHDOT Rte 202 Bridge replacement over Contoocook River Peterborough. Project Superintendent Mike Desroches, Foreman Craig Moses, Pile Foreman Joe Symonds, Foreman Curtis LaBrecque and Junior Engineer Nick LaBrecque leading the E.D. Swett family members in setting the 66Ft long, 15,550 Lb "B" girders manufactured by Casco Bay Steel, on prefect fall day. Excellent team work by all the men in our family. Done smoothly and safely. Nice work.

Photos from ED Swett Inc's post 10/23/2023

October 23, 2023 NHDOT Rte 202 Bridge Replacement over Contoocook River Peterborough. Project Superintendent Mike Desroches, Senior Engineer Jon Coulp-Yu, Junior Engineer Nick LaBrecque, President Chris Robert and E.D. Swett family members setting the "A" girders in place this am. Each of the 4 girders weight 27,000 Lbs +, 115ft + in length, and 3' + deep. Utilizing our Linkbelt 218 110 Ton Crawler Crane and Astro Crane Rentals Grove GMK5135 110 Ton Hydraulic Crane, it was a perfect set. Nicely done by everyone involved in the setting process and Casco Bay Steel for providing/manufacturing a perfect set of matched girders.

10/19/2023

October 19, 2023
NHDOT Rehabilitation of 5 bridges I-93 Northbound, Manchester
Low Bidder: E.D. Swett $ 10,099,519.60

Photos from ED Swett Inc's post 10/19/2023

October 18, 2023 Tully Brook Road Bridge replacement Richmond.
Project Foreman Craig Moses, craftsmen Rick Griffin, Ed Coulstring, Kyle McFetridge, and Joshua Stanford finished up the final touches and opened the temporary bridge and detour road to traffic. Excellent work.

10/17/2023

October 17, 2023 Island Street Bridge Replacement. The Prime Contractor for this project, BUR Construction, has the existing Abutment B excavated and ready for us to start the demo. Nice work

Photos from ED Swett Inc's post 10/17/2023

October 17, 2023 NHDOT Rte 202 Bridge replacement over Contoocook River Peterborough. Project Superintendent Mike Desroches, Foremen Curtis LaBrecque, operator Jim Conway and craftsmen Ethan Faucher attach safety lines on the first 4 "A" girders delivered today by Casco Bay Steel. Each girder is 115' +/- and weights 27,400 Lbs +/-.

10/13/2023

October 13, 2023 Island street bridge replacement Keene. Project Superintendent Mike Desroches, Pile Foreman Jason Bisson, operator Mark Bailey and craftsmen Ed Coulstring driving the sheets for the cofferdam at abutment B. Nice work.

Photos from ED Swett Inc's post 10/13/2023

October 12, 2023 NHDOT Rte 202 Bridge replacement Peterborough. Our sub-contractor, Weaver Brothers construction, backfilling the new bridge abutment A.

Photos from ED Swett Inc's post 10/10/2023

October 10, 2023 Rte 4 Danbury. Another bridge in the books. We are pleased to announce that Project Foreman Lon Collins, craftsmen Derek Boynton and Nate Puluti completed the balance of all ED Swett's work today. All of us here at ED Swett thank Weaver Brothers Construction for selecting us to construct this bridge for them.

10/10/2023

October 10, 2023 NHDOT Rte 202 Bridge Replacement Peterborough. Equipment Superintendent Matt Chambliss, Mechanic Dale Framer and operator Jim Conway erecting our Linkbelt 218 Crawler Crane w/140Ft boom at Abutment B.

Photos from ED Swett Inc's post 10/10/2023

October 9, 2023 Tully Brooke Road Bridge replacement Richmond. Project Foreman Craig Moses, craftsmen Ed Coulstring and Rick Griffin building the access road to the newly built temporary bridge. Great job

Photos from ED Swett Inc's post 10/10/2023

October 9, 2023 NHDOT Rte 202 Bridge Replacement over Contoocook River Peterborough Project Superintendent Mike Desroches, Foreman Curtis LaBrecque, operator Jim Conway, craftsmen Jacob Reznikow, Tony Roy pushing the project forward in anticipation of setting structural steel. Excellent work

Photos from ED Swett Inc's post 10/09/2023

October 9, 2023 Island Street Keene Project Superintendent Mike Desroches, Pile Foreman Jason Bisson, operator Mark Bailey, craftsmen Ethan Fauher, Dzevad Tokovic, and Derek Baldwin placing concrete for the new Abutment A. Excellent work

10/07/2023

October 6, 2023 NHDOT I-89 NB On Ramp bridge @ Exit 19 Lebanon. Project Superintendent Buzz Abbott overseeing our sub-contractor, Nicom Coatings, as they install the deck membrane prior to the paving operation.

Photos from ED Swett Inc's post 10/07/2023

October 6,2023 Island Street Bridge Replacement Keene. Project Superintendent Mike Desroches, Pile Foremen Jason Bisson, operator Mark Bailey, craftsmen Dzevad Tokovic, Ethan Faucher, and Ed Coulstring preparing for a concrete placement on Monday for the new Abutment A. Nice work.

10/02/2023

October 1, 2023. NHDOT I-89 Northbound Exit 19 Lebanon. Our Linkbelt 218 110T Crawler Crane on a perfect fall Sunday

09/29/2023

September 29, 2023 Tully Brook Road Richmond. Project Foreman craig Moses, Pile foreman Jason Bisson, operator Mark Bailey and craftsmen ed Coulstring and Derek Baldwin erecting the temp bridge. Excellent work by these gentlemen this week. The middle row of barrier is stockpiled on the bridge and to be used on the roadway shoulders

Photos from ED Swett Inc's post 09/28/2023

September 28, 2023 NHDOT Rte 202 Bridge Replacement over Contoocook River Peterborough . Project Superintendent Mike Desroches, Foreman Curtis LaBrecque, operator Jim Conway, craftsmen Ethan Faucher, Dzevad Tokovic, Jacob Reznikow and Tony Roy placing the first of two placements at the Abutment A wing. Excellent work.

09/28/2023

September 27, 2023 Island Street Bridge Replacement Keene. Project Superintendent Mike Desroches, Pile Foreman Jason Bisson, operator Mark Bailey, craftsmen Ed Coulstring prep Abutment A ready for concrete formwork. Nice.

Photos from ED Swett Inc's post 09/28/2023

September 27, 2023 Tully Brook Road Richmond. Project Foreman Craig Moses, Pile Foreman Jason Bisson, operator Mark Bailey, craftsmen Ed Coulstring, Derek Baldwin and Engineer Nick LaBrecque installing the 63 Ft temporary bridge and detour road. Excellent work

09/26/2023

September 26, 2023 NHDOT Rte 4 Bridge Replacement Danbury. What a difference a day makes.

Photos from ED Swett Inc's post 09/25/2023

September 25, 2023 NHDOT Rte 4 Danbury. Pile Foreman Joe Symonds, craftsmen Ed Coulstring and Vic Davis demo existing bridge. The existing steel structure was so badly deteriorated we did not feel safe to hoe ram the concrete deck off prior to demolition, so with the assistance of Weaver Brothers excavators and calculations by our senior engineer Jon Coulp-Yu PE, we pulled the bridge down. Wow. Excellent work by everyone.

Photos from ED Swett Inc's post 09/23/2023

September 23, 2023 NHDOT Rte 4 Bridge Replacement Danbury. Pile Foreman Joe Symonds, Yard Foreman Jim Lacasse and craftsmen Vic Davis preparing the existing bridge for demolition.
Nice work.

Photos from ED Swett Inc's post 09/22/2023

September 20, 2023 Island Street Bridge replacement Keene. Project Superintendent Mike Desroches, Pile Foreman Jason Bisson, operator Mark Bailey and craftsman Ed Coulstring, driving 50 ft long PZ18 stay-in-place steel sheeting at Abutment B. Overhead power lines, river and structures make this a tough task. Excellent work by these gentlemen.

Photos from ED Swett Inc's post 09/21/2023

September 21, 2023 NHDOT Rte 202 Bridge Replacement over Contoocook River Peterborough. Project Superintendent Mike Desroches, Foreman Curtis LaBrecque, operator Jim Conway, craftsmen Ethan Faucher, Jacob Reznikow, and Tony Roy standing up concrete forms for the Abutment A wing. Excellent work by these gentlemen

Photos from ED Swett Inc's post 09/21/2023

September 20, 2023 Tully Brook Road Bridge Replacement Richmond. Project Foreman Craig Moses and operator Derek Baldwin completed the clearing and grubbing, set the temporary bridge base foundations on each side of the brook and created the pad to allow us to move our 138 Linkbelt Crawler crane into position to set the temporary bridge beams. Nice work.

Photos from ED Swett Inc's post 09/21/2023

September 21, 2023 NHDOT I-89 Exit 19 Lebanon Northbound on ramp Bridge Replacement: Project Superintendent Buzz Abbott and 12 other ED Swett family members placing the first of two deck placements. Today was 82 CY. Excellent work.

Photos from ED Swett Inc's post 09/18/2023

September 18, 2023 Island Street Bridge Replacement Keene. Project Superintendent Mike Desroches, Pile Foreman Jason Bisson, Pile Foreman Joe Symonds, craftsmen Ed Coulstring and operator Mark Bailey driving the 95Ft long 12x84 H-pile to bedrock utilizing our ICE D19 Diesel Impact Hammer.

Photos from ED Swett Inc's post 09/15/2023

September 15, 2023 Island Street Bridge Replacement Keene. Project Superintendent Mike Desroches, Pile Foreman Jason Bisson, operator Mark Bailey and craftsmen Ed Coulstring driving and splicing 95 ft long 12x84 H-Pile for the new abutment A.

Photos from ED Swett Inc's post 09/14/2023

September 11, 2023 South Main Street Brookline. Our sub-contractor, RWC Enterprises, constructing the new sidewalks and drainage along South Mian Street.

Photos from ED Swett Inc's post 09/14/2023

September 13, 2023 NHDOT Rte 202 Bridge replacement over Contoocook River Peterborough. Project Superintendent Mike Desroches, Foreman Curtis LaBrecque, Yard Foreman Jim Lacasse, operator Jim Conway, craftsmen Vic Davis, Ethan Faucher, Kyle McFetridge, Joshua Stanford, Jacob Reznikow, and Tony Roy placing 95 CY of concrete for the new Abutment A. Excellent work during a rainy day.

Photos from ED Swett Inc's post 09/14/2023

September 13, 2023 Tully Brook Road Bridge Replacement Richmond. Project Foreman Craig Moses and craftsmen Derek Baldwin getting the project underway. First: clear and grub temporary diversion road and construct the temporary bridge, moving traffic off of the existing culvert, so we can begin constructing the new bridge.

09/13/2023

September 12, 2023 NHDOT I-89 Northbound Bridge Rehabilitation at Exit 19 Lebanon over Rte 4. Wow, what a difference a 9 hour day makes. These guys are cranking out the work.

09/12/2023

September 12, 2023 NHDOT Bridge Rehabilitation I-89 Northbound Exit 19 Lebanon. Project Superintendent Buzz Abbott, operator Randy Gibson, Foreman Lon Collins, craftsmen Derek Boynton, Nate Puluti, Dave Clark, Dzevad Tokovic, Jon Gibson, Carl Olsen, and Scot Frechette forming the deck and begin placing rebar. Excellent work by these men.

Photos from ED Swett Inc's post 09/12/2023

September 8, 2023 NHDOT I-89 Northbound Exit 19 Lebanon. Because accidents do happen .....As you travel throughout our great state of NH, please do not get frustrated, angry, and vocal because contractors working in the roadways may have lane shifts, detours, and one-lane traffic patterns...all to keep the traveling public safe and our employees/family members and engineers out of harms way...because accidents do happen. Patience Please for it is all done for the good.

Photos from ED Swett Inc's post 09/07/2023

September 7, 2023 NHDOT Rte 202 Bridge Replacement over Contoocook River Peterborough. Project Superintendent Mike Desroches, Foreman Curtis LaBrecque, operator Jim Conway, craftsmen Ethan Faucher, Kyle McFetridge and Joshua Stanford completed the new pier construction and onto the Abutment A. Excellent work.

Want your business to be the top-listed Engineering Company in Concord?
Click here to claim your Sponsored Listing.

Telephone

Website

Address

8 Industrial Park Drive
Concord, NH
03301

Opening Hours

Monday 8:30am - 4:30pm
Tuesday 8:30am - 4:30pm
Wednesday 8:30am - 4:30pm
Thursday 8:30am - 4:30pm
Friday 8:30am - 4:30pm

Other Construction Companies in Concord (show all)
B&M Weldon B&M Weldon
10 FERRY Street, STE 333 #176
Concord, 03301

Residential excavation, hardscaping, and painting. Contact Brooke to chat about your next project.

Cut To Fit Co. Cut To Fit Co.
16 Judith Drive
Concord, 03301

*Granite Curb *Precast Concrete Curb *Hardscaping *Excavation

Jordan Property Services Jordan Property Services
Concord, 03303

Amplified Construction Amplified Construction
Concord, 03303

Tile and Stone,Inc Tile and Stone,Inc
9 Via Tranquilla Street
Concord, 03301

Tile and Stone

Phoenix Precast Products Phoenix Precast Products
77 Regional Drive
Concord, 03301

Phoenix Precast Products manufactures all manner of precast concrete products.We have many standard stock items and the capability to produce custom items.

North Branch Construction North Branch Construction
76 Old Turnpike Road
Concord, 03301

North Branch Construction: Commercial and Residential Construction Excellence Since 1958.

Currid Builders Currid Builders
11 South Main Street, Unit 200
Concord, 03301

🏡 🔨 DESIGNED ▪ BUILT ▪ LOVED 🔨 🏡 Kitchen & Bath | Major Renovations | Additions

E.D. Swett E.D. Swett
8 Industrial Park Drive
Concord, 03301

Since 1936, we’ve led the way in bridge building for the New Hampshire, Massachusetts, and Vermont regions.

HHR Enterprises HHR Enterprises
Concord, 03301

Residential and Commericial Remodeling

Associated Builders and Contractors New Hampshire/Vermont Associated Builders and Contractors New Hampshire/Vermont
58 Chenell Drive Ste 11
Concord, 03301

Freedom Fighters (www.abcnhvt.org). Serving the Government Relations, Business Development and Human