VN Engineers, Inc

VN Engineers is committed to exceeding your needs as a DBE subconsultant. We understand our role in

Virginia Moves Forward on New River Valley Rail Plan - Railway Age 07/05/2022

VN Engineers has acted as both a subcontractor and prime contractor in the reconstruction of major projects in Railroad Bridge Design, Rail Yard Facility Improvements, Construction Inspection, Transportation and Civil Engineering. The VN Team provides a comprehensive array of Rail Engineering Design Services. We have assembled an excellent team of rail engineers to meet your needs. We can offer you a turnkey-solution for all your rail projects requirements and ensure delivery of a project that will exceed your expectations.

Virginia Moves Forward on New River Valley Rail Plan - Railway Age The Virginia Passenger Rail Authority (VPRA) and Norfolk Southern (NS) on June 30 announced the financial closing of a deal that will expand commonwealth-supported Amtrak service from Washington, D.C., to Roanoke and to the New River Valley.

City of New Haven celebrates new Orange Street intersection 06/29/2022

City of New Haven Celebrates new Orange Street Intersection.

VN Engineers is proud to be part of this City of New Haven infrastructure project that rebuilds the former Route 34 expressway into a system of urban boulevards with a lower speed limit (25 MPH), streetscape improvements, bike lanes and traffic calming measures.

For Phases 1 and 2, VN Engineers developed construction documents including design plans, specifications, and cost estimates for illumination design and two traffic signals and support during construction services.

Currently, VN is providing project management and public outreach services for Phase 3 and 4 including serving as the City of New Haven’s reviewer for the proposed plans through final design and construction for civil/site, traffic, drainage, structures, utilities and lighting. In addition, VN Engineers is performing shop drawing reviews, RFI reviews, and non-conformance reviews. The structural reviews for the Phase 3 bridge package included independent assemsent of the design calculations and geometric layout. Public Involvement services included the development and management of a dynamic website that includes daily/weekly updates as well as coming up with new innovative methods such as creating drone videos for effective connection with the public.

https://www.wfsb.com/2022/06/27/city-new-haven-celebrates-new-orange-street-intersection/

City of New Haven celebrates new Orange Street intersection The city of New Haven officially celebrated its new Orange Street intersection Monday.

Why does transit infrastructure cost so much in the U.S.? 06/22/2022

Why does transit infrastructure cost so much in the U.S.? There isn’t one particular reason why exactly infrastructure and transit investments cost more in the States; rather, it’s a myriad of reasons.
https://bit.ly/3HLI9HO

Why does transit infrastructure cost so much in the U.S.? New York City’s subway system is a prime, pricey example.

Photos from VN Engineers, Inc's post 06/17/2022

VN Engineers attended the STEM night in CT. Inspiring curious young future engineers!

Amtrak Increasing Acela Speeds in New Jersey - Railway Age 06/16/2022

Amtrak passengers can now travel even faster on Acela...speeds of up to 150 mph.

Amtrak Increasing Acela Speeds in New Jersey - Railway Age Amtrak passengers can now travel even faster on Acela as recent infrastructure improvements along a 16-mile segment of the Northeast Corridor in New Jersey between South Brunswick (Monmouth Junction) and Trenton known as the Raceway can accommodate speeds of up to 150 mph.

Glastonbury Route 17 exit project promises reduced traffic delays 06/15/2022

VN Engineers is proud to improve the drivability and reduce wait times at Glastonbury intersections while maintaining safety. Find out more: https://bit.ly/3QqxS7s

Glastonbury Route 17 exit project promises reduced traffic delays GLASTONBURY — The plan to change the exits from Route 17 southbound to New London Turnpike is expected to significantly reduce the times motorists will have to wait at the

New LIRR terminal for East Side Access project to be called Grand Central Madison 06/02/2022

New LIRR terminal for East Side Access project to be called Grand Central Madison The terminal beneath Grand Central Terminal is the largest passenger rail terminal to be built in the U.S. since the 1950s and is on schedule to be completed in December 2022.

Timeline photos 04/27/2022

VN Engineers is glad to join the HNTB’s 2nd Annual Salvation Army Engineering Challenge. We are thrilled to join this year’s event benefiting The Salvation Army’s Greater Hartford Feeding Program.
Thank you HNTB and all the partner firms for taking the time to support our local communities.

Timeline photos 02/22/2022

Happy Presidents Day from all of us at VN Engineers!

CTDOT Releases Updated Five-Year Capital Plan with Renewed Sustainability Commitment 02/18/2022

CTDOT released an interim five-year Capital Plan, covering fiscal years 2022 – 2026 with a focus on reducing greenhouse gas emission, protecting natural and community resources, and improving the health and safety of residents. your DBE/WBE solution!

CTDOT Releases Updated Five-Year Capital Plan with Renewed Sustainability Commitment The Connecticut Department of Transportation released an interim five-year Capital Plan, covering fiscal years 2022 – 2026 with a focus on reducing greenhouse gas emission, protecting natural and community resources, and improving the health and safety of residents. The interim five-year Plan incl...

Photos from VN Engineers, Inc's post 02/09/2022

Your DBE/WBE Solution For Design Build Projects.
VN Engineers offers over ten years of experience providing design services and program management for design-build projects along the east coast spanning from Rhode Island to Florida. The VN Engineers design-build (DB) team begins by fully understanding the base technical concepts, works closely with both designers and contractors to identify value added ATC’s and has the staff dedicated to the accelerated schedule submissions. See more projects: https://bit.ly/VNDesign-Build

12/22/2021
11/24/2021

Happy Thanksgiving from all of us at VN Engineers. We wish everyone a joyous and plentiful Thanksgiving.

Want your business to be the top-listed Engineering Company in North Haven?
Click here to claim your Sponsored Listing.

Videos (show all)

Happy Thanksgiving from all of us at VN Engineers. We wish everyone a joyous and plentiful Thanksgiving.

Address


116 Washington Avenue
North Haven, CT
06473

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Other Engineering Services in North Haven (show all)
DVS Security Consultants DVS Security Consultants
250 State St
North Haven, 06473

Professional Engineering and Security Consulting Firm

General Drafting & Design, Inc General Drafting & Design, Inc
140 Washington Avenue
North Haven, 06473

General Drafting & Design is a Mechanical and Electrical Consulting Engineering firm serving clients