Radcliffe Engineering
Radcliffe Engineering provides professional civil engineering needs; including commercial site plans
Radcliffe Engineering provides professional civil engineering services meeting a wide range of client needs; including commercial site plans, subdivisions, roads, drainage, water, sewer, site development, water treatment and wastewater treatment facilities.
We invite you to sponsor us in support of the Women’s Pregnancy Center.
Please check out the link below to find out how you can help!
Thanks so much!
Mike & Kathie Radcliffe
https://secure.ministrysync.com/ministrysync/event/website/?m=4673090 #.XZvfArTJFFI.email
Mike & Kathie Radcliffe's Fundraising Page | FundEasy Will you help me raise $1,000 for Women's Pregnancy Center? | Walk-Bike-Move for Life 2019 :: FundEasy :: Online Fundraising Pages
Recently we helped a client address drainage issues using an innovation drainage solution. This Heathbrook commercial site fronting Hwy 200 was designed with an underground water retention system that maximized the amount of commercial space on the site. In the following images you can see the large chambers that were constructed below the final site grade. These chambers hold the stormwater run-off from the site until it is able to seep back into the ground in the same manner that an open Drainage Retention Area would. A portion of this underground drainage system is now covered by the new Bojangles restaurant’s parking lot.
Construction has commenced at 10th Street Villas. This site will have three beautiful triplexes for a total of 9 units. Each unit will also have its own garage. It's still early in the construction phase but be on the look out for more updates from this project. Construction by Cullison Wright Construction Corp.
Pastor Grant Wilkerson lays the cornerstone for the recently started United Holiness Church Multi-use building. This is an additional 5400sf building for the Church located at 1642 NW 3rd Street in Ocala. The new building features 3 classrooms, a large fellowship area and kitchen. Construction is progressing nicely.
Country Meats recently finished building another expansion on the east end of their building. In addition to a new parking lot and drainage retention area. Check out the collection of photos from the last few months to see what the site looked like during construction.
The Canterfield Assisted living facility on Hwy 200 is nearing completion. Take a look at some of our recent progression photos of the site.
A recent aerial photo of the new and improved 15th and 16th hole area of the Rolling Greens golf course.
Beautiful rainbow over Rolling Greens yesterday afternoon.
Ocala Drive-in just finished constructing their new screen and projection room. They will now be able to have more showings with a quicker turnover rate between films. Be sure to visit, and enjoy one of only 7 remaining Drive-in movie theaters in Florida.
Don't forget to visit our friends over at Artman Country Smokehouse this weekend. Its the one place our employee's never get tired of.
Radcliffe Engineering assisted with this project by preparing the Minor Site Plan for Ocala Drive-in and securing City approval.
Here are a few more amazing shots of the Rolling Greens Community Center and Golf Course.
Phase 2 of the Rolling Greens Community Center recently opened, featuring new athletic courts! Tennis, pickle ball, bocce ball, basketball, horse shoes and shuffle board have been professionally installed, to the highest standards of quality.
Another exciting upgrade at Rolling Greens was the redesign of 2 golf holes. The 15th and 16th holes were lengthened with a new green for the 15th hole, as well as a new tee box for the 16th hole. Drainage and utilities were accommodated in the modified design. Check out the great photos.
Here is the latest progress at Blue Ribbon Cleaning. The lime rock base of the parking lot has been thoroughly laid out, and will soon be paved. The building is nearing completion and looks great. There is still some drainage work left to be done, but the finish product is getting closer everyday.
Yesterday the whole office took a lunch trip to the recently opened Artman Country Smokehouse. As expected, the food was incredibly delicious with large enough portions to stuff everyone. We are proud to see another client’s idea become reality, and glad to have been a part of the design process. If you are looking for some awesome barbeque be sure to visit Artman Country Smokehouse at 6900 SE Hwy42 in Summerfield, (352) 307-6240.
Much progress has been made on the Blue Ribbon Cleaning Site. Foundation has been poured, walls are going up, and Drainage areas have been dug. Check out the photos for a closer look.
The Silver Springs Film Festival continues through Sunday. It's another great way to support our community.
The next phase at Heath Brook just started construction. Phase 2 of the Meadows will feature 84 home sites, with curb and gutter, water, sewer and underground electric. Home sites should be available in November 2016. Take a look at these videos to see the site progression so far.
https://youtu.be/-wAJpytxjsg
https://youtu.be/UW8dVs6aOPs
Blue Ribbon Cleaning Company, Inc. recently held its ground breaking ceremony, located on South Pine between Ocala and Belleview, just south of the NOW Church.
Radcliffe Engineering designed the parking and drainage and obtained site plan approval from both Marion County and FDOT. The general contractor for the new building is Ethridge Construction.
There has been great progress on the Canterfield Assisted Living Facility. Here are some recent photos from the site.
We are pleased to co-sponsor one of the sculptures at “A Sculptured Affair,” Ocala’s new art exhibit at Tucscawilla Park, along with Curington Construction LLC and H.W. Barrineau & Associates, Inc.
“Diversity,” by artist Cecilia Lueza of Miami, Florida is now on display at the park along with 9 other unique sculptures. They will all be on display for the next 18 months, so be sure to check them out.
Artist Statement:
My work is a personal expression of my lifelong fascination with the visual effects of color. I create sculptures that rest between reality and myth with a focus on color and shape. The pieces are mostly figurative with an element of simplification or slight abstraction. I am interested in a dynamic interaction with the viewer, allowing a personal exploration of the work on a physical level. My sculptures convey universal meanings and embrace the dichotomy between content and form, as well as between two and three dimensionality.
Each piece is a blend of different materials that range from aluminum to high-tech polyurethane plastics, including concrete and steel. I see my sculptures as freestanding paintings that exploit the illusionistic effects of a third dimension.
Here are a few photos from Blue Ribbon Cleaning. A recently permitted cleaning supply ware house on Hwy 441. Land clearing is underway.
Ocala Utility is offering double rebates on qualifying Energy Star appliances during the month of January. If you have upgraded any of your appliances you may be eligible for some savings. Call 629-2489 or check out the link for more information.
http://www.ocalafl.org/COO3.aspx?id=18134
City of Ocala Whether you are looking for a place to spend a lifetime or an afternoon, we invite you to consider Ocala/Marion County. You'll be glad you did!
Take a look at a few more updates from Artman’s Country Smokehouse. The parking lot and various concrete slabs have been completed. The well and water system is also finished. Thanks to Earl’s Well Drilling for the well and MIKE SCOTT PLUMBING for the great work on the Lift Station. The site is beginning to come together quickly. You won’t believe how delicious their barbeque is…
Hope the New Year’s break was great for everyone!
Here are some great photos of progress that has been made at the Artman’s Country Smokehouse site. Since the last update the roofing and outside wall texturing has been completed. Parking for the site, as well as the sidewalks and landings for the entryways have been prepared for concrete. The lift station and grease trap have also been installed.
Here is some recent imagery of ongoing development at the Pepper Tree Plaza site, located just north of Wildwood on U.S. 301.
Click here to claim your Sponsored Listing.
Videos (show all)
Category
Contact the business
Telephone
Address
2611 SE Lake Weir Avenue
Ocala, FL
34471
Opening Hours
Monday | 8am - 5pm |
Tuesday | 8am - 5pm |
Wednesday | 8am - 5pm |
Thursday | 8am - 5pm |
Friday | 8am - 5pm |
1720 SE 16th Avenue, Bldg 100
Ocala, 34471
We are a multi-disciplinary firm providing Civil & Environmental Engineering, Land Planning, Geograp
851 NW 24th Court, Unit 102
Ocala, 34475
Gradeworks, LLC is a commercial survey company founded by father-son team, Chuck and Benjamin Counts. We offer commercial construction surveying, GPS file building, commercial proj...
5817 NW 44th Avenue
Ocala, 34482
Scorpion Racing Products is your high performance manufacturing powerhouse for the absolute best American-made products!
305 SE 1st Avenue
Ocala, 34471
Moorhead Engineering Company is a progressive Civil Engineering and Land Surveying firm located in Ocala, Florida, established in 1884.
1016 SE 3rd Avenue
Ocala, 34471
- Geotechnical Engineering - Materials Testing - Sinkhole Testing - Soil Sampling - Preliminary Site Evaluations
1084 SE 58th Avenue
Ocala, 34480
Dimension Works is a full-service 3D Printing Firm. Our portfolio of services includes CAD & Design