Butier Engineering, Inc. (Butier) is a construction management firm that has been servicing public a
Behind every drop of your water is a network of dedicated professionals and critical infrastructure 💧. This week, Butier Engineering salutes the water professionals who work tirelessly to ensure clean, safe water for all. Thank you for all you do 🙌!
South Coast Water District selected Butier Engineering, Inc. to provide construction management, observation, and inspection services for the Dana Point Harbor Revitalization Phase 2 Project, which includes the new water and sewage line. After completion of this phase, construction will begin on the Harbor’s new restaurants, retail shops, parkscapes, public spaces, and a state-of-the-art parking structure.
Butier is pleased to partner with South Coast Water District, Snyder Langston (General Contractor), Tait & Associates (Designer of Record), and Alta Contracting. The Butier team includes Project Director Mark Butier, Principal-In-Charge Joseph Blum, Field Inspector Joe Hawes, and Field Engineer Ryan Weir. To learn more about Butier, please visit our website at www.butier.com.
PROJECT PROGRESS: Butier Engineering, Inc., in collaboration with Orange County Water District (OCWD) and the City of Tustin, is providing construction management and field QA/QC services for the City of Tustin PFAS Treatment System and Influent Conveyance Project. Aerial images, courtesy of Caliagua, Inc. (General Contractor), show significant construction progress at the existing Main Street Water Treatment Plant. Upon completion, the new treatment system will eliminate per- and polyfluoroalkyl substances (PFAS) affecting portions of Tustin’s groundwater and restore the impacted drinking water supplies to the Tustin customers. The project involves installing four new ion exchange vessels to treat the water from four offsite wells and installing nearly three miles of conveyance pipeline from the extraction wells to the new treatment system. For additional project information, please visit our website at https://butier.com/news/.
We are proud to be partnering with Caliagua, Inc. and Jacobs Engineering (Designer). Butier’s construction management team includes Joe Blum, James Ling, Gary Schulz, Robert Burford, Ryan Weir, Bryan Wilson, and Ninyo & Moore (Geotechnical and Materials Testing).
PROJECT MILESTONE đź“˝
Butier Engineering, Inc. is providing construction management services for the $182-million Standalone Intake Modifications Project, the final phase of intake modifications for the Claude “Bud” Lewis Carlsbad Desalination Plant. Please watch the highlight reel 👇 showcasing the installation of 11 seawater screens supported on a new concrete access bridge. The new system better protects marine life by decreasing intake water velocity and reducing the size of the mesh opening.
Butier is collaborating with contractor Kiewit-J.F. Shea Construction, Inc. (Kiewit-Shea II) on this essential project. Our construction management team includes Matt Harvie, Kenneth Stiles, Bruce Phillips, Casey Harris, and Bryan Wilson.
To learn more about this project, please visit our website at www.butier.com.
PROJECT MILESTONE đź“˝
Butier Engineering, Inc. is providing construction management services for the $182-million Standalone Intake Modifications Project, the final phase of intake modifications for the Claude “Bud” Lewis Carlsbad Desalination Plant. Please watch the highlight reel 👇 showcasing the installation of 11 seawater screens supported on a new concrete access bridge. The new system better protects marine life by decreasing intake water velocity and reducing the size of the mesh opening.
Butier is collaborating with contractor Kiewit-J.F. Shea Construction, Inc. (Kiewit-Shea II) on this essential project. Our construction management team includes Matt Harvie, Kenneth Stiles, Bruce Phillips, Casey Harris, and Bryan Wilson.
To learn more about this project, please visit our website at www.butier.com.
https://www.youtube.com/watch?v=rTyAS_kQqZI
Project Milestone: Claude "Bud" Lewis Carlsbad Desalination Plant Standalone Intake Modifications Butier Engineering, Inc. is providing construction management services for the $182-million Standalone Intake Modifications Project. The Project is the final...
Please meet Butier’s Field Engineer/Inspector Dustin Morton, CCM, CWI. Dustin joined the Butier family over 10 years ago, and he continues to develop his professional skills with the support of Butier and guidance from his mentor Joe Blum. His recent water/wastewater project experience includes Moulton Niguel Water District's Reservoir Management Systems Replacement Phase IV, Mesa Water's SCADA Control Room and Wet Lab Upgrade, and various projects for East Orange County Water District. Dustin provides our clients with invaluable field engineering and inspection services and embodies Butier’s spirit of “Experience, Integrity, and Excellence.” To see more of our Faces of Butier series, please visit our website at www.butier.com.
Butier would like to thank our partners for providing the clean water that we drink and the safe roads that we travel on. Our construction management teams are proud to assist these hardworking professionals who provide essential services that lead to healthier, happier, and more vibrant communities.
,
CONSTRUCTION PROGRESS UPDATE đź“Ł
The City of Whittier's Murphy Reservoir Replacement Project has reached a significant milestone. Please take a moment to watch the highlight reel to see how the concrete walls were formed for the new reservoir. To meet the water storage deficiency within the existing limited space, the aging twin 0.5 MG concrete reservoirs were demolished and are being replaced with a single 2.31 MG reservoir. The larger reservoir will meet the City’s operational, fire, and emergency storage requirements.
Butier Engineering is partnering with the City of Whittier, Gateway Pacific Contractors, Inc., Cannon, and Ninyo & Moore on this essential project. Our team includes Stephen White, P.E., Bart Crawford, Bryan Wilson, and Acxel Gutierrez.
To learn more about Butier Engineering, Inc., please visit our website at www.butier.com
Butier Engineering, Inc. is excited to be a Silver Sponsor for the 2024 Student Night and Job Fair (SNJF) hosted by the ASCE Los Angeles Younger Member Forum (LA YMF). The SNJF connects students, employers, and young professionals for an evening of networking and celebrating the accomplishments of future engineers. We look forward to the opportunity to meet over 200 of the brightest and most ambitious civil engineering students from 11 local universities. Please stop by our booth to get a chance to learn more about opportunities at Butier!
Congratulations to the City of Santa Ana - Municipal Government Public Works Agency for the completion of the San Lorenzo Sewage Lift Station project! Butier Engineering was honored to celebrate the recent ribbon-cutting ceremony with Mayor Valerie Amezcua, Councilmembers Phil Bacerra and David Penaloza, Interim City Manager Tom Hatch, and Public Works Agency Executive Director Nabil Saba, and other City staff and community members.
Thank you to the City’s leadership and engineering and water resources staff members for bringing this project to fruition. Consultant team members included Tetra Tech (Designer), Griffith Company (Contractor), and Butier Engineering (Construction Manager). For additional project information, please visit our website at www.butier.com.
The City of Chino Hills - Municipal Government 1,2,3-Tricholoropropane Removal Treatment Plant Project reached a significant milestone. Take a moment to watch the reel to see how the project team successfully installed 10 granular activated carbon (GAC) vessels in a single day! Butier Engineering’s team, including Billy Stewart, Keith Stiles, and Katie Squires, is partnering with the City of Chino Hills - Municipal Government Garney Construction, and Hazen and Sawyer on this essential project. Once completed, the treatment plant will provide nearly 3 million gallons/day of additional clean water to Chino Hills residents. To learn more, please visit our website at https://butier.com/project/123-trichloropropane-removal-treatment-plant/.
Butier is proud to introduce our most recent Certified Construction Managers® (CCM®), including William Baker, CCM, CWI, CIP III; Joseph Hawes, CCM; and Dustin Morton, CCM. Their dedication to furthering their education and commitment to performing their best exemplifies the values we foster at Butier. As defined by the Construction Management Association of America (CMAA), CCMs are the “best qualified by education and experience to deliver professional construction management services with the highest quality and ethical conduct.” To learn more about Butier, please visit our website at www.butier.com
Thank you to the City of Manhattan Beach leaders and staff for their vision and commitment to enhancing the City’s drinking water storage and system reliability. The 8-million-gallon Peck Reservoir Replacement Project reduces the need for imported water, increases the City’s critical operational, fire protection, and emergency storage resources, and protects the water supply and distribution for the residents of Manhattan Beach for years to come.
Construction of the 1,2,3-TCP Removal Treatment Plant is right on schedule. Butier Engineering is partnering with the City of Chino Hills - Municipal Government, Garney Construction and Hazen and Sawyer on this essential project that will bring additional high-quality drinking water to the Chino Hills community. The Butier team includes Billy Stewart, Project Manager; Keith Stiles, Lead Inspector; and Katie Squires, Field Engineer.
Congratulations to the City of Manhattan Beach on the completion of the Peck Reservoir Replacement Project. Butier Engineering was proud to be an integral part of this important project that has enhanced the City’s drinking water storage and system reliability.
Moulton Niguel Water District selected Butier Engineering, Inc. (Butier) to provide construction management and inspection services for Phase IV of the Reservoir Management Systems (RMS) Replacement Program. This phase includes replacing the existing on-site generation (OSG) systems at four (4) RMS sites in Mission Viejo and Laguna Niguel. The systems will be replaced with 12.5% bulk sodium hypochlorite or new OSG and ammonia systems. The RMS Replacement Program will help maintain consistent disinfection levels in the District’s potable water distribution system.
Butier looks forward to partnering with Moulton Niguel Water District, Brown & Caldwell (Design Engineer), Pacific Hydrotech Corporation (General Contractor), Ninyo & Moore (Materials Testing & Geotechnical), and On-Site Technical Services, Inc. (Start-up and Commissioning). The Butier team includes Project Director Mark Butier, Resident Engineer Stephen White, Lead Inspector Dustin Morton, and specialty inspectors Joseph Hawes and Bruce Phillips. For additional project details, please visit Butier’s website at www.butier.com.
Chino Basin Desalter Authority selected Butier Engineering, Inc. (Butier) to provide construction management and inspection services for the Well I-11 Booster Pump Station Project. The project includes constructing a new booster pump station to pump groundwater from the well to the Chino II Desalter to remove volatile organic compounds (VOCs) should elevated levels be detected.
Butier looks forward to partnering with Chino Basin Desalter Authority, Webb & Associates (Design Engineer), Pyramid Building and Engineering (General Contractor), and Ninyo & Moore (Geotechnical and Materials Testing). The Butier team includes Project Director Mark Butier, Construction Manager Billy Stewart, Field Inspector Keith Stiles, and Field Engineer Katie Squires. For additional project details, please visit Butier’s website at www.butier.com.
Butier looks forward to continuing our relationship with Eastern Municipal Water District (EMWD) on their As Needed Construction Management team. Butier will be working with EMWD on projects that will help provide safe, reliable, economical, and environmentally sustainable water, wastewater, and recycled water services to the surrounding communities.
Click here to claim your Sponsored Listing.
Videos (show all)
Category
Contact the business
Website
Address
17822 17th Street
Tustin, CA
92780
Opening Hours
Monday | 9am - 4pm |
Tuesday | 9am - 4pm |
Wednesday | 9am - 4pm |
Thursday | 9am - 4pm |
Friday | 9am - 4pm |
2761 Walnut Avenue
Tustin, 92780
Trelleborg Medical Solutions Tustin is a contract manufacturer of final product for medical devices
340 E 1st Street
Tustin, 92781
Providing service solutions for your MRI, CT and PET imaging systems. Expert troubleshooting, world class repair service and same day service available! Contact us today to schedul...