Fame Residences

Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Fame Residences, Construction Company, Brgy Highway Hills, Mandaluyong.

02/02/2018

Hi! We are hiring for the following positions:

-(1) QA/QC-

DUTIES AND RESPONSIBILITIES:
 Monitoring and administering the QA/QC Plan or Programmed and ensuring incorporated materials on construction projects are in compliance with the plans and specifications.
 Assuring that the work is performed as required by the contract and meets or exceeds the required qualities.
 Assuring the acceptable quality of materials, processes, and workmanship in the project work.
 Assisting Quality Assurance and Quality Control Engineer such as steel reinforcement checking same as in construction drawing.
 Issue materials receiving report for the delivered materials.
 Waterproofing checking underground level and in wet areas in the building.
 Following up the concreting works in a presence of the Engineer or Consultant, slump test and cubes preparation for the compressive test.
 Finishing work checking in a presence of the Engineer or Consultant, block, plaster, painting, tiling, kitchen cabinets, wardrobes, ceiling and light fittings.
 Maintain standards of safety and comply with Company’s Health, Safety and Environment Management System requirements.
 Follow and maintain Company standards of Quality in accordance with Company Quality System requirements.

REQUIREMENTS:
>Graduate of BSCE / BSARCH
>Atleast 3 years Experience
>Able to conduct proper Quality Conntrol.
>Able to Handle Tight Schedule
>Male/Female
>Single/Married
>CAN WORK UNDER STRESS!

PLEASE SEND YOUR RESUME ON [email protected] , Thank You! :)

Fame Residences January 23, 2017 Progress 03/04/2017

I. Work Activities
Masonry Works
2nd Floor
1. Globe, Smart and Other Providers Area
Plastering of CHB Wall along grid A-B/4-5
2. Mechanical Blower Room(EDSA Side)
Installation of formworks of stiffener columns
3. Ramp GF-2F (EDSA & Mayflower Side)
Plastering of Parapet Wall along grid B-C/9-16 and B-C/19-26
7th & 8th Floor - Tower 1
Layouting of Residential Units and Hallway
9th Floor - Tower 1
Layouting of Unit 14 & 15
Ceiling Works
1. Phase 2 (Tower 3 & 4)
Application of skim coat at ceiling

Fame Residences January 21, 2017 Progress 03/04/2017

I. Work Activities
Masonry Works
2nd Floor
1. Globe, Smart and Other Providers Area
Installation of CHB along grid A-B/4-5
2. Mechanical Blower Room(EDSA Side)
Installation of CHB along grid D-E/28-30
3. Ramp GF-2F
Plastering of CHB Wall along grid B-C/19-26
4. 9th Floor
Layouting of Mock-up units 14 & 15

Fame Residences January 20, 2017 Progress 03/04/2017

I. Work Activities
Masonry Works
2nd Floor
1. Mechanical Blower Room(EDSA Side)
Installation of CHB along grid D-E/28-30
2. Globe and Smart Providers
Plastering of CHB Wall along grid A-B/4-5
3. Ramp GF-2F
Plastering of CHB Wall along grid B-C/19-26
4. 9th Floor
Layouting of Mock-up units 14 & 15

Fame Residences January 19, 2017 Progress 03/04/2017

I. Work Activities
Masonry Works
2nd Floor
1. Mechanical Blower Room(EDSA Side)
Installation of CHB along grid D-E/28-30
2. Globe and Smart Providers
Plastering of CHB Wall along grid A-B/4-5
3. Ramp GF-2F
Plastering of CHB Wall along grid B-C/19-26

Fame Residences January 18, 2017 Progress 03/04/2017

I. Work Activities
Hauling of Materials
Masonry Works
2nd Floor
1. Mechanical Blower Room/Fire Exit (EDSA Side)
Installation of CHB along grid D-E/28-30
2. Globe and Smart Providers and PMO
Plastering of CHB Wall along grid A-B/5
3. Central CCTV and Security Room
Plastering of CHB Walls along grid C/16-18
4. Ramp GF-2F
Plastering of CHB Wall along grid B-C/23-26; B/13-16

Fame Residences January 17, 2017 Progress 03/04/2017

I. Work Activities
Hauling of Materials
Masonry Works
2nd Floor
1. Mechanical Blower Room/Fire Exit (EDSA Side)
Installation of CHB along grid D-E/28-30
Plastering of CHB wall at Fire Exit (EDSA Side) along grid A/31-32
2. Globe and Smart Providers and PMO
Plastering of CHB Wall along grid A-B/5
Concrete pouring of lintel beam along grid A-B/5
3. Central CCTV and Security Room
Plastering of CHB Walls along grid C/16-18
4. Ramp GF-2F
Plastering of CHB Wall along grid B-C/23-26; B/13-16
5. Ramp 3F-5F
Layout of Ramp along grid D-E/10-16 & 19-26

Fame Residences January 16, 2017 Progress 03/04/2017

I. Work Activities
Masonry Works
2nd Floor
1. Mechanical Blower Room/Fire Exit (EDSA Side)
Plastering of CHB wall at Fire Exit (EDSA Side) along grid A/31-32
Hauling of Materials at Mechanical Blower Room grid D-E/28-30
Installation of formworks of zocalo along grid A-B/31-32
2. Property Management Office
Plastering of CHB Wall along grid A-B/5
3. Central CCTV and Security Room
Hauling of Materials at grid line B-C/16-18
Plastering of CHB Walls along grid B-C/18
Pouring of lintel beam along grid B-C/18
4. Ramp 2f-3f (Mayflower Side)
Plastering of CHB Walls along grid B/9-12
9th Floor Tower 1 & 2
1. Layouting of mock-up units 21 & 22 along grid line B-C/30-31

Fame Residences January 14, 2017 Progress 03/04/2017

I. Work Activities
Masonry Works
2nd Floor
1. Mechanical Blower Room (EDSA Side)
Stripping of formworks D-E/28-30
2. Smart, Globe, and other Providers and Utilities Room
Installation of CHB along grid A-B/5
Plastering of CHB Wall along grid A-B/4
3. Central CCTV and Security Room
Plastering of CHB Walls along grid B-C/18
Installation of formworks and pouring of concrete of lintel beam along grid B-C/18

Fame Residences January 13, 2017 Progress 31/03/2017

I. Work Activities
Masonry Works
Ground Floor
1. On-going assembly/installation of Alimak Cage
2nd Floor
1. Mechanical Blower Room & Fire Exit (EDSA Side)
Installation of CHB along grid A/31-32
Pouring of concrete of zocalo along grid D-E/28-30
2. Smart, Globe, and other Providers and Utilities Room
Installation of CHB along grid A-B/5
3. Central CCTV and Security Room
Plastering of CHB Walls along grid C/16-17
4. Ramp (EDSA Side)
Plastering works along grid C/19-22

Fame Residences January 12, 2017 Progres 31/03/2017

I. Work Activities
Masonry Works
2nd Floor
1. Mechanical Blower Room/Fire Exit (EDSA Side)
Installation of CHB along grid A/31-32
2. Smart, Globe, and other Providers and Utilities Room
Plastering OF CHB Walls
3. Central CCTV and Security Room
Plastering OF CHB Walls
4. Ramp (Mayflower side)
Plastering of CHB Walls
5. Machine Room
Installation of formworks of zocalo

Fame Residences January 11, 2017 Progress 30/03/2017

I. Work Activities
Masonry Works
2nd Floor
1. Mechanical Blower Room/Fire Exit (EDSA Side)
Installation of CHB along grid A/31-32
2. Smart, Globe, and other Providers and Utilities Room
Chipping works along grid A-B/4-5
Plastering works along grid A-B/4-5
Hauling of Debris along grid A-B/4-5
3. Central CCTV and Security Room
Plastering works along grid C/17-18

Fame Residences January 10, 2017 Progress 30/03/2017

I. Work Activities
Masonry Works
2nd Floor
1. Mechanical Blower Room/Fire Exit (EDSA Side)
Installation of CHB along grid A/31-32
Installation of formworks along grid D-E/28-30
2. Smart, Globe, and other Providers and Utilities Room
Installation of CHB along grid A-B/4
Plastering works along grid A-B/4
3. Central CCTV and Security Room
Plastering works along grid C/17-18
4. Ramp (EDSA Side)
Plastering works along grid B/22-24

Fame Residences January 9, 2017 Progress 30/03/2017

I. Work Activities
Hauling of Materials
Masonry Works
Ground Floor - Alimak Area
1. On-going Installation of cage and mast
2nd Floor
1. Mechanical Blower Room
Installation of formworks along grid line D-E/28-30
2. Smart, Globe, and other Providers
Chipping of excess CHB along grid line A-B/5
Clearing of Debris
3. Ramp (EDSA Side)
Plastering of CHB Wall along grid B/19-22 and C/18

Fame Residences January 7,2017 Progress 30/03/2017

I. Work Activities
Masonry Works
Hauling of Materials
Ground Floor - Alimak Area
1. Installation of cage and mast
2nd Floor
1. Ramp (Mayflower Side)
Plastering of CHB wall along grid B/9-16
Pouring of concrete of zocalo along grid D-E/15-17
2. Ramp (EDSA Side)
Chipping of zocalo wall along grid B/19-26
3rd Floor
1. Ramp (Mayflower Side)
Installation of formworks of zocalo along grid D-E/14-17

Fame Residences January 6, 2017 Progress 30/03/2017

I. Work Activities
Masonry Works
Ground Floor
1. Alimak
Installation of Base Form
2nd Floor
1. Ramp - Mayflower Side
Installation of formworks of zocalo along grid D-E/13-16
Hauling of Materials
2. Ramp - EDSA Side
Installation of formworks of zocalo along grid D-E/18-26
Hauling of Materials

Fame Residences January 5, 2017 Progress 30/03/2017

I. Work Activities
Masonry Works
2nd Floor
1. Ramp - Mayflower Side
Installation of CHB along grid D-E/12-16
Hauling of Materials
2. Ramp - EDSA Side
Installation of CHB along grid D-E/19-25
Hauling of Materials
3rd Floor
1. Ramp - EDSA Side
Installation of forwmworks of zocalo along grid D-E/18-26

Fame Residences January 4, 2017 Progress 30/03/2017

I. Work Activities
Masonry Works
1. Ramp along grid B/14-16
Hauling of Materials
Installation of CHB
2. Ramp along grid D-E/18-26
Hauling of Materials

Fame Residences January 3, 2017 Progress 30/03/2017
Fame Residences December 29,2016 Progress 29/03/2017

I. Work Activities
Masonry Works
1. Second Floor to Third Floor Ramps
Pouring of concrete for zocalo along grid D-E/20-23
2. Central CCTV Area
Installation of CHB along grid C/11-14; C/19-22; & E/13-14
3. Ground Floor - Alimak Area
Pouring of concrete for foundation for alimak along grid F-G/33

Fame Residences December 28, 2016 Progress 29/03/2017

I. Work Activities
Masonry Works
1. Second Floor to Third Floor Ramps
Installation of formworks of zocalo along grid D-E/20-23
2. Central CCTV Area
Installation of CHB along grid B-C/18; C/11-14; and D-E/10-12
3. Ground Floor - Alimak Area
Installation of formworks of foundation for alimak along grid G-F/33

Fame Residences December 27, 2016 Progress 29/03/2017

I. Work Activities
Masonry Works
1. Second Floor to Third Floor Ramps
Installation of formworks of zocalo along grid D-E/19-26
Pouring of concrete of zocalo along grid D-E/19-26
Installation of CHB along grid D-E/9-16
2. CCTV Area
Pouring of concrete of zocalo along grid B-C/18
Installation of CHB along grid B-C/18

Fame Residences December 23, 2016 Progress 29/03/2017

I. Work Activities
Masonry Works
1. Second Floor to Third Floor Ramps
Installations of formworks grid D-E/9-16
Installations of formworks along grid B-C/9-16
Installation of CHB along grid B-C/9-16
Installation of CHB along grid B/18-26

Fame Residences December 22, 2016 Progress 29/03/2017

I. Work Activities
Masonry Works
1. Second Floor to Third Floor Ramps
Installations of formworks and pouring of concrete for zocalo wall along grid D-E/9-16
Installations of formworks along grid B/9-16
Installation of CHB along grid B/9-16
Installation of CHB along grid B/18-26
Hauling of materials

Fame Residences December 21, 2016 Progress 29/03/2017

I. Work Activities
Masonry Works
1. Second Floor to Third Floor Ramp grid B/9-26
Installation of formworks of zocalo along grid B/9-16
Installation of CHB along grid B/9-16
Pouring of concrete of zocalo along grid B/22-26
Installation of formworks of zocalo along grid D-E/9-16
Pouring of concrete of zocalo along grid D-E/9-16

Fame Residences December 20, 2016 Progress 29/03/2017

I. Work Activities
Masonry Works
1. Utilities Room
Installation of CHB at Utilities Room along grid A-B/3-4
Installation of formworks
Hauling of Materials
2. Second Floor Ramp along grid B-C/19-26 & B-C/9-16
Installation of formworks of zocalo of parapet wall at ramp
Concrete pouring of zocalo of parapet wall at ramp
3. Second Floor to Third Floor Ramp along grid D-E/9-16
Installation of formworks of zocalo of parapet wall at ramp

Fame Residences December 17, 2016 Progress 29/03/2017

I. Work Activities
Masonry Works
1. Globe, Smart, Other Provider & Utilities Room
Installation of CHB at Utilities Room along grid A-B/3-4
2. CCTV and Security Area
Installation of CHB along grid B-C/16-18
3. Second Floor Ramp along grid B-C/19-26
Installation of formworks of zocalo of parapet wall at ramp
Concrete pouring of zocalo of parapet wall at ramp
Plumbing Works
1. Connection of waterline at grid line G/32

Fame Residences December 16, 2016 Progress 29/03/2017

I. Work Activities
1. Globe and Smart Provider Area
Installation of CHB along grid A-B/2-4
2. CCTV and Security Area
Installation of CHB along grid B-C/16-18
3. Ground to Second Floor Ramp along grid B-C/19-26
Installation of formworks for ramp perimeter

Fame Residences December 14, 2016 Progress 29/03/2017

I. Work Activities
1. Globe and Smart Provider Area
Installation of CHB along grid A-B/4-5
2. CCTV and Security Area
Installation of CHB along grid B-C/16-18

Fame Residences December 15, 2016 Progress 29/03/2017

I. Work Activities
1. Globe and Smart Provider Area
Installation of CHB along grid A-B/4-5
2. CCTV and Security Area
Installation of CHB along grid B-C/16-18

Want your business to be the top-listed Engineering Company in Mandaluyong?
Click here to claim your Sponsored Listing.

Telephone

Website

Address


Brgy Highway Hills
Mandaluyong
1554

Other Construction Companies in Mandaluyong (show all)
Sharp Edge Construction Management Sharp Edge Construction Management
Shaw Boulevard
Mandaluyong, 1552

Our expertise in construction management and quality check enables us to identify and mitigate project risks, ensure regulatory compliance, and ensure that the project adheres to t...

Ganjaes Construction and Development Corp. Ganjaes Construction and Development Corp.
107 Sunflower Street , Hulo Bliss Townhomes, Brgy. Hulo
Mandaluyong, 1550

A general contracting company based in Taguig who have opened various shops and boutiques for the SSI Group around the Philippines such as Chariol, Hermes, Lacoste, Longchamp, and ...

bp glass & aluminum contractor inc. bp glass & aluminum contractor inc.
Unit 1L, Lee Gardens Condominium, Brgy. Wack-Wack, Shaw Boulevard
Mandaluyong, 1509

We offer fabrication & installation of glass & aluminum doors & windows, curtain wall, shower etc

ANTA Construction Corporation ANTA Construction Corporation
626 Lee Street Brgy. Addition Hills
Mandaluyong, 1550

Official page for ANTA Construction Corporation. We believe that quality is conformance with client

PYNX Builders Co. Ltd. PYNX Builders Co. Ltd.
Makati-Mandaluyong Brg
Mandaluyong, 1550

We are a construction company in line with specialty construction for kitchen fire suppression, gas piping and electronic safety device installation. We also have architectural des...

JnH Hardware and Construction Supplies JnH Hardware and Construction Supplies
46 A Esteban Street Brgy Highwayhills, Mandaluyong City
Mandaluyong

Construction supplies located in Antipolo City

Fox Water Proofing Fox Water Proofing
Mandaluyong

Nationwide Erectors Corporation Nationwide Erectors Corporation
GF Lux Center Building Wack-Wack EDSA
Mandaluyong, 1550

Services and Product Offered: Bored Piling, Steel Fabrication & Er****on, Supply of Aggregates

Cris Valdez Cris Valdez
Dr. Jose Fabella
Mandaluyong, 1553

Construction Company

HLD Builders HLD Builders
Mandaluyong, 1550

HLD Builders - A Group of DESIGN AND BUILD CONTRACTORS, ENGINEERS, ARCHITECTS, INTERIOR, LANDSCAPE. "Build the impossible"

Snpdri Philippines Corporation Snpdri Philippines Corporation
622 BSA Twin Towers Bldg. , Bank Drive Cor. J. Vargas Avenue
Mandaluyong, 1555

A world-leading clean energy developer and provider.

Ireenel Construction & Supply Inc - ICS Inc. Ireenel Construction & Supply Inc - ICS Inc.
297C STO. ROSARIO
Mandaluyong, 1550

Ireenel Construction And Supply Inc. is a 100% Filipino capitalized corporation established and regi